European Union · Country
? How to use this page

How to use a region page

  1. Counts and the pipeline for this region come first; the tabs list its buyers, players and tenders.
  2. Cities on the map open their own pages.
  3. Capex, pipeline value and the market narrative open with this market's edition.

Romania

15 buyers · 42 tenders · checked 2026-10-03

CFR SA manages 10,628 km; Craiova-Caransebeș RON 10.4bn since August 2025, Brașov-Sighișoara/Cluj-Oradea executing, Bucharest Magistrala 4 RON 9.07bn; several lots closed without award.

Everything here is free. One market edition opens in full with one email. Open your free edition

1Metro systems operating
4Tram systems operational
15Buyers tracked
42Tenders tracked
Live pipeline
RON 52.4bn of valued 2025–2026 rail procurements tracked across 41 of the 42 entries, the largest being the Magistrala 4 metro extension (RON 9.07bn), the Craiova–Caransebeș corridor lots (RON 10.40bn awarded plus a RON 6.15bn lot closed without award) and ARF's rolling-stock programmes (RON 6.26bn); RON 1.69bn of it is open for bids on 12 September 2026
Technology areas
Signalling & train control, Track & civil, Electrification, Rolling-stock hardware, Predictive maintenance, Digital operations, AI inspection, Cybersecurity

Key figures

CFR SA's network as published i…10,628 km of line · 904 stationsCFR SA's network as published in its Network Statement 2027 (§2.3.1, §2.3.3): 10,628 km of railway of which 2,917 km double track and 7,711 km single track, and 904 stations. The company's own site gives a wider total of 19,629.00 km of CF lines — 13,442.00 km of running and through lines plus 6,187.00 km of station lines, of which 17,429.00 km public and 2,400.00 km private infrastructure, and 4,787.00 km non-interoperable. Gauge is the European 1,435 mm.
2 sources · all primary
  • ● CNCF “CFR” SA · CFR Network Statement 2027 (draft), version 16.0.0, update 21.04.2026, validity 13.12.2026–11.12.2027 — §2.2.1.1 interoperable route length, §2.3.1 track typologies, §2.3.3 stations, §2.3.9 power supply, §2.3.10 signalling, §2.4.4–2.4.5 tunnels and bridges, §1.5 RFC 7 and RFC 9, §3.3 access conditions, abbreviations list (published 2026-04-21 · checked 2026-09-12)
  • ● CNCF “CFR” SA · Reţeaua feroviară — Pe scurt (network totals, non-interoperable km, turnouts, bridges, tunnels, gauge) (published 2026 · checked 2026-09-12)
Interoperable railway infrastru…6,878 route-km interoperableInteroperable railway infrastructure — the part connected to the trans-European railway network — has a route length of 6,878 km, listed in Annex 2 of GD 643/2011; CFR has leased non-interoperable sections to five non-interoperable infrastructure managers (GIFN). CFR's own site puts non-interoperable line at 4,787.00 km including station lines.
2 sources · all primary
  • ● CNCF “CFR” SA · CFR Network Statement 2027 (draft), version 16.0.0, update 21.04.2026, validity 13.12.2026–11.12.2027 — §2.2.1.1 interoperable route length, §2.3.1 track typologies, §2.3.3 stations, §2.3.9 power supply, §2.3.10 signalling, §2.4.4–2.4.5 tunnels and bridges, §1.5 RFC 7 and RFC 9, §3.3 access conditions, abbreviations list (published 2026-04-21 · checked 2026-09-12)
  • ● CNCF “CFR” SA · Reţeaua feroviară — Pe scurt (network totals, non-interoperable km, turnouts, bridges, tunnels, gauge) (published 2026 · checked 2026-09-12)
Electrification is 25 kV nomina…25 kV 50 Hz · no national electrified total publishedElectrification is 25 kV nominal at 50 Hz, with the traction current bought on the OPCOM electricity market since 1 September 2014, transformed from 110 kV to 25 kV in CFR's traction substations and supplied to operators by Electrificare CFR SA. Neither CFR's network statement nor its website publishes an electrified kilometre total or share — the electrified lines are shown only on the map in Annex 2.a. The published figures are corridor-level: Rail Freight Corridor 7 Curtici–Sighișoara–Brașov–București–Constanța is 858 km and 100 per cent electrified, while its southern branch Curtici–Timișoara–Caransebeș–Orșova–Craiova–Calafat is 507 km with 399 km electrified (79 per cent) and 108 km not (21 per cent).
1 source · primary
  • ● CNCF “CFR” SA · CFR Network Statement 2027 (draft), version 16.0.0, update 21.04.2026, validity 13.12.2026–11.12.2027 — §2.2.1.1 interoperable route length, §2.3.1 track typologies, §2.3.3 stations, §2.3.9 power supply, §2.3.10 signalling, §2.4.4–2.4.5 tunnels and bridges, §1.5 RFC 7 and RFC 9, §3.3 access conditions, abbreviations list (published 2026-04-21 · checked 2026-09-12)
The control-command and signall…ETCS Level 2 + GSM-R · 1,195 automatic level-crossing installationsThe control-command and signalling subsystem is ETCS Level 2 trackside with GSM-R carrying voice and data between trackside and on-board ERTMS equipment; train speed supervision is by INDUSI and/or ETCS. Level crossings carry 1,195 automatic signalling installations with and without half-barriers. Most stations have interlockings, but low-traffic sections still use key-operated switch and signal control, which is what the eight-lot centralisation programme is replacing. ERTMS itself is being bought in parts: Lot 1 of the Predeal–București–Constanța programme, the civil works for the Operational Control Centre at CNMT București, was awarded at RON 75,587,205.97 in May 2025, while the signalling works Lots 2 and 3, estimated RON 1,929,177,770.03, closed for bids on 27 October 2025 with no award on TED as of 12 September 2026.
3 sources · all primary
  • ● CNCF “CFR” SA · CFR Network Statement 2027 (draft), version 16.0.0, update 21.04.2026, validity 13.12.2026–11.12.2027 — §2.2.1.1 interoperable route length, §2.3.1 track typologies, §2.3.3 stations, §2.3.9 power supply, §2.3.10 signalling, §2.4.4–2.4.5 tunnels and bridges, §1.5 RFC 7 and RFC 9, §3.3 access conditions, abbreviations list (published 2026-04-21 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Implementarea măsurilor necesare funcționării sistemului ERTMS pe secțiunea de cale ferată Predeal – București – Constanța și extinderea sistemului GSM-R pe rețeaua primară de transport feroviar – LOT 1 – Lucrări de construcții civile pentru Centrul de Control Operațional – CNMT București”; awarded RON 75,587,205.97 against a higher tender of RON 92,380,820.50, contract of 15 May 2025; DRUM ASFALT and GDO MOV IMPEX S.R.L. (published 2025-05-16 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “Implementarea măsurilor necesare funcționării sistemului ERTMS pe secțiunea de cale ferată Predeal – București – Constanța și extinderea sistemului GSM-R pe rețeaua primară”, ERTMS Level 2 signalling works, LOT 2 Predeal–Buftea and LOT 3 Chitila–Pajura–București Băneasa–Pantelimon–Lehliu–Fetești–Constanța; estimated RON 1,929,177,770.03; participation deadline 27 October 2025 (published 2025-09-25 · checked 2026-09-12)
The Orient/East-Mediterranean c…RON 10.40bn of Craiova–Caransebeș lots awarded · RON 6.15bn Lot 3 unawardedThe Orient/East-Mediterranean corridor rehabilitation Craiova–Drobeta Turnu Severin–Caransebeș has been awarded lot by lot since August 2025: Lots 4 and 5 RON 4,453,078,752.76, Lot 6 RON 2,114,352,202.96, Lots 1 and 2 RON 3,837,552,296.25. Lot 3 (Igiroasa–Drobeta Turnu Severin, km 331+000–362+632), estimated RON 6,152,376,194.85, closed for bids on 3 November 2025 with no award on TED as of 12 September 2026. Five of the six lots are therefore let and one is not; the awards total RON 10,404,983,251.97.
4 sources · all primary
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Reabilitarea liniei feroviare Craiova-Drobeta Turnu Severin-Caransebeș, parte a Coridorului Orient/Est-Mediteranean” Lot 1 and Lot 2; awarded RON 2,037,420,531.88 and RON 1,800,131,764.37 (total RON 3,837,552,296.25) against an estimate of RON 4,963,274,811.48; TERNA and S.C. Alstom Transport S.A. (published 2026-07-22 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — Craiova-Drobeta Turnu Severin-Caransebeș, Lot 4 (km 362+632–404+250) and Lot 5 (km 404+250–436+887); awarded RON 2,143,133,821.64 and RON 2,309,944,931.12 (total RON 4,453,078,752.76); PORR CONSTRUCT S.R.L., ROTARY CONSTRUCTII MENTENANTA, IC IÇTAŞ INŞAAT (published 2025-08-29 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — Craiova-Drobeta Turnu Severin-Caransebeș, Lot 6 (km 436+887–474+046.53); awarded RON 2,114,352,202.96 against the next tender at RON 2,202,993,566.62; IC IÇTAŞ INŞAAT SANAYI VE TICARET A.Ş. and ROTARY CONSTRUCTII MENTENANTA (published 2025-12-22 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — Craiova-Drobeta Turnu Severin-Caransebeș, LOT 3 Igiroasa (Cap Y) – Drobeta Turnu Severin (Cap X), km 331+000–362+632, including the route variant connections to Prunișor and Drobeta Marfă and the Dudașu connection; estimated RON 6,152,376,194.85; participation deadline 3 November 2025 (published 2025-10-29 · checked 2026-09-12)
Bucharest has the country's onl…1 metro · 4 tram systems · 2 metropolitan rail projects in procurementBucharest has the country's only metro, run by Metrorex, with the Magistrala 6 airport link in execution and the Magistrala 4 Gara de Nord–Gara Progresul extension awarded at RON 9.07bn by Sector 4's district administration. Tram systems tracked here are Bucharest (STB, lines 1, 4, 5, 7, 10, 11, 21, 23, 25, 27, 32, 41, 47, 53), Timișoara, Iașu00219i and Oradea. Metropolitan rail is being bought in Cluj (Tren Metropolitan Cluj: RON 473.9m of works awarded, RON 622.3m of EMUs closed for bids) and Oradea (14 tram-trains, RON 462.0m, closed for bids).
8 sources · all primary
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Legătura reţelei de metrou cu Aeroportul Internaţional Henri Coandă (Magistrala 6. 1 Mai – Otopeni). Pachet 2: Proiectare şi execuţie lucrări de arhitectură, cale de rulare, instalații electromecanice și de curenți slabi”; awarded RON 1,667,516,058.64; ALTIMATE, SALCEF SPA, SOMET, THEDA MAR DESIGN and TIAB; Metrorex contact contact@metrorex.ro, +40 213193601 (published 2025-04-10 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Extinderea rețelei de metrou Magistrala 4 de metrou, secțiunea Gara de Nord – Gara Progresul”; awarded RON 4,691,432,000 and RON 4,383,033,884.22 (total RON 9,074,465,884.22); GP GROUP JSC, Trace Group Hold, DOGUS INSAAT VE TICARET A.S., BOG'ART, CONCELEX and CONSTRUCTII ERBASU; contracting authority Sector 4 (Primăria Sectorului 4 București), achizitiipublice@ps4.ro (published 2026-02-06 · checked 2026-09-12)
  • ● Societatea de Transport București STB SA · STB home page — tram line list (1, 4, 5, 7, 10, 11, 21, 23, 25, 27, 32, 41, 47, 53), trolleybus and bus lines, service notices (published 2026-09 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Proiectare și Execuție Lucrări de Infrastructură CF, precum și Lucrări auxiliare pentru accesibilitatea utilizatorilor” for TREN METROPOLITAN CLUJ; awarded RON 473,918,781.10 against an estimate of RON 474,030,818.65; CON-A OPERATIONS with ZUE (published 2026-05-15 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “Achiziția de rame electrice pentru transportul metropolitan de călători” plus maintenance and repair services for the TREN METROPOLITAN CLUJ investment; estimated RON 622,300,000; participation deadline 14 August 2026; buyers Municipiul Cluj-Napoca with the communes Apahida, Baciu, Bonțida, Gârbău and Jucu (published 2026-07-29 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “Achiziționarea a 14 tram-trenuri electrice destinate conectării MUNICIPIULUI ORADEA de ZONA METROPOLITANĂ” plus maintenance and repair services; estimated RON 461,968,200; participation deadline 10 September 2026; buyer JUDEŢUL BIHOR, achizitii@cjbihor.ro, +40 259441317 (published 2026-07-27 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Furnizare tramvaie în cadrul proiectului Asigurarea unui transport public local ecologic prin achiziția de tramvaie noi”, SMIS 341003, Programul Regional Vest 2021–2027; awarded RON 105,760,000; Bozankaya Rayli Sistemler A.Ş.; contract dated 19 February 2026 (published 2026-02-24 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “REABILITARE LINII DE TRAMVAI POD ROȘ – ANASTASIE PANU” construction works; estimated RON 94,854,268.26; participation deadline 17 August 2026; buyer Municipiul Iași, licitatii@primaria-iasi.ro, +40 232 267582 (published 2026-07-08 · checked 2026-09-12)
ARF has contracted 62 regional…RON 6.26bn of ARF orders · 23 locomotives unawardedARF has contracted 62 regional EMUs (RE-R) in three lots with 15 years of maintenance at RON 3,038,000,000 and 20 interregional EMUs (RE-IR) at RON 1,604,280,000, both from PESA Bydgoszcz, and 12 hydrogen fuel-cell multiple units with maintenance at RON 1,617,696,763.20 from Siemens Mobility Austria — RON 6,259,976,763.20 together. Its tender for 23 ERTMS-fitted electric locomotives for 160 km/h, estimated RON 1,572,654,000, closed on 10 June 2026 with no award on TED.
4 sources · all primary
  • ● Tenders Electronic Daily (TED) · Contract modification notice — “Achiziționarea de rame electrice regionale, denumite RE-R” plus 15 years of maintenance, in three lots of 20, 23 and 19 units; amounts RON 980,000,000, RON 1,127,000,000 and RON 931,000,000 (total RON 3,038,000,000); POJAZDY SZYNOWE PESA BYDGOSZCZ; original contract 6 November 2024 (published 2025-07-16 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract modification notice — “Achiziția de 20 rame electrice interregionale de lung parcurs RE-IR” plus maintenance; RON 1,604,280,000; POJAZDY SZYNOWE PESA BYDGOSZCZ; original contract 19 December 2023 (published 2025-07-15 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Achiziție 12 automotoare în tracțiune electrică pe bază de pile de combustie cu hidrogen” plus maintenance and repair services; awarded RON 1,617,696,763.20 against an estimate of RON 2,468,146,243; Siemens Mobility Austria GmbH and Siemens Mobility GmbH; contract dated 28 April 2026 (published 2026-05-13 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “Achiziția de 23 locomotive electrice noi cu sisteme ERTMS, capabile să circule cu o viteză maximă de 160 km/h și să tracteze până la 16 vagoane de călători” plus maintenance; estimated RON 1,572,654,000; participation deadline 10 June 2026 (published 2026-04-27 · checked 2026-09-12)
ARF published prior information…3 contracts to be competitively awarded for 2028–2033ARF published prior information notices on 28 August 2026 for three rail passenger public service contracts to be awarded competitively for 10 December 2028 – 11 December 2033, naming the electrified trunk routes each will cover: Contract 1 București Nord–Constanța, București Nord–Craiova, București Nord–Craiova–Timișoara Nord–Arad, București Nord–Brașov–Arad–Timișoara Nord and București Nord–Craiova–Petroșani–Deva; Contract 2 București Nord–Brașov, București Nord–Brașov–Cluj Napoca, Brașov–Deda–Cluj Napoca and Cluj Napoca–Deva–Timișoara Nord. No values are published.
3 sources · all primary
  • ● Tenders Electronic Daily (TED) · Prior information notice for a public service contract — “Contract de servicii publice nr.1 atribuit competitiv pentru perioada 10/12/2028 - 11/12/2033”, electrified routes București Nord–Constanța, București Nord–Craiova, București Nord–Craiova–Timișoara Nord–Arad, București Nord–Brașov–Arad–Timișoara Nord and București Nord–Craiova–Petroșani–Deva; no value published; ARF contact office@arf.gov.ro, +40 374808535 (published 2026-08-28 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Prior information notice for a public service contract — “Contract de servicii publice nr.2 atribuit competitiv pentru perioada 10/12/2028 - 11/12/2033”, routes București Nord–Brașov, București Nord–Brașov–Cluj Napoca, Brașov–Deda–Cluj Napoca and Cluj Napoca–Deva–Timișoara Nord; no value published (published 2026-08-28 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Prior information notice for a public service contract — “Contract de servicii publice nr.3 atribuit competitiv pentru perioada 10/12/2028 - 11/12/2033”; no value published (published 2026-08-28 · checked 2026-09-12)
Romania's recovery and resilien…EUR 28.5bn recovery plan · all milestones due by August 2026Romania's recovery and resilience plan is worth EUR 28.5bn. The Commission's page gives EUR 13.6bn of RRF grants (including the Brexit Adjustment Reserve transfer and the REPowerEU grant) and EUR 7.8bn of RRF loans in its summary, while its own text gives RRF and REPowerEU grant allocations of EUR 12.1bn and EUR 1.4bn plus EUR 14.9bn of loans for the same total. Only the body-text figures come close to reconciling — 12.1 + 1.4 + 14.9 = 28.4 — while the summary box sums to EUR 21.4bn, so the box is the figure to distrust; both are recorded because the page carries both. The plan holds 111 investment streams and 66 reforms, 44.1 per cent of it supporting climate objectives and 21.8 per cent the digital transition. It was approved by Council on 29 October 2021 and revised on 8 December 2023 to add a REPowerEU chapter, with EUR 1.8bn of pre-financing disbursed. The Regulation requires all milestones and targets in national plans to be completed by August 2026 — the deadline against which CFR SA's twelve PNRR rail projects are being judged. No rail sub-envelope is published.
2 sources · all primary
  • ● European Commission · Romania's recovery and resilience plan — plan value, approval and revision dates, pre-financing, and the RRF requirement that all milestones and targets be completed by August 2026 (published 2026 · checked 2026-09-12)
  • ● CNCF “CFR” SA · Proiecte PNRR — the twelve rail projects CFR runs under Romania's recovery plan (published 2026 · checked 2026-09-12)

Buyers

Tenders

TenderBuyerStatusValue bandNext key date
CFR Craiova–Caransebeș modernisation, lots 1 to 6 · 4 partsCFR SABids closed (mixed across parts)Varies by part
CFR SA Craiova Caransebeș Lot 3 IgiroasaCFR SABids closedover $1bnBids closed November 2025 · award expected
CFR SA Craiova Drobeta Turnu Severin CaransebeșCFR SAAwarded$500m–1bnAwarded July 2026
CFR SA Craiova Caransebeș Lots 4 5CFR SAIn execution$500m–1bnAwarded August 2025
CFR SA Craiova Caransebeș Lot 6CFR SAIn execution$100–500mAwarded December 2025
ARF 23 ERTMS-fitted electric locomotives 160 km/hARFBids closed$100–500mBids closed June 2026 · award expected
CFR SA ERTMS Level 2 Predeal BucureștiCFR SABids closed$100–500mBids closed October 2025 · award expected
Județul Bihor 14 electric tram-trains OradeaJudețul BihorBids closed$100–500mBids closed September 2026 · award expected
Municipiul București Colentina Titan tram depotsPMBBids closed$100–500mBids closed September 2026 · award expected
Cluj-Napoca Tren Metropolitan Cluj electric multiple unitsCluj-NapocaBids closed$100–500mBids closed August 2026 · award expected
CFR SA Ploiești Triaj Valea Călugărească modernisationCFR SABids closed$25–100mBids closed September 2026 · award expected
CFR SA Roman Iași border electrification FazaCFR SABids closed$25–100mBids closed September 2026 · award expected
CFR SA concrete sleepers elastic fastening supplyCFR SABids closed$25–100mBids closed September 2026 · award expected
CFR SA line 816 Palas Port ACFR SABids closed$25–100mBids closed June 2026 · award expected
CFR SA track renewal Cluj Napoca TrenCFR SABids closed$25–100mBids closed March 2026 · award expected
Municipiul București Bd. Dimitrie Pompeiu tram extensionPMBBids closed$25–100mBids closed September 2026 · award expected
CFR SA central systems cybersecurity railway ITCFR SABids closed$5–25mBids closed September 2026 · award expected
CFR SA new rail bridge Deda RăzboieniCFR SABids closed$5–25mBids closed September 2026 · award expected
CFR SA pantograph inspection vehicles telescopic platformCFR SABids closed$5–25mBids closed August 2026 · award expected
Metrorex Magistrala 4 access-control system integrationMetrorexBids closed$5–25mBids closed August 2026 · award expected
Municipiul Iași Pod Roș Anastasie Panu tramIașiBids closed$5–25mBids closed August 2026 · award expected
ARF 12 hydrogen fuel-cell electric multiple unitsARFAwarded$100–500mAwarded April 2026
CFR SA Constanța Port infrastructure modernisation EtapaCFR SAAwarded$100–500mAwarded July 2026
CFR SA signalling centralisation programme, lots · 3 partsCFR SAAwarded (mixed across parts)Varies by part
CFR SA signalling centralisation programme Lots 1 2CFR SAAwarded$100–500mAwarded July 2026
CFR SA signalling centralisation Lot 4 IașiCFR SAAwarded$100–500mAwarded August 2026
CFR SA signalling centralisation Lot 3 BrașovCFR SACancelled$25–100mDate July 2026
CFR SA turnout supply framework S49E1 S60CFR SAAwarded$100–500mAwarded August 2026
CFR SA impregnated beech wooden sleepers supplyCFR SAAwarded$25–100mAwarded August 2026
CFR SA ERTMS Lot 1 Operational Control CentreCFR SAAwarded$5–25mAwarded May 2025
CFR SA seven level crossings Brașov modernisationCFR SAAwarded$5–25mAwarded March 2026
Sector 4 București Magistrala 4 metro extensionSector 4 BucureștiIn executionover $1bnAwarded December 2025
ARF 62 regional electric multiple units RE-RARFIn execution$500m–1bnAwarded November 2024
CFR SA Brașov Sighișoara rehabilitation 160 km/hCFR SAIn execution$500m–1bnAwarded March 2020
ARF 20 interregional electric multiple units RE-IRARFIn execution$100–500mAwarded December 2023
CFR SA Caransebeș Timișoara Arad modernisationCFR SAIn execution$100–500mAwarded November 2022
CFR SA Cluj Napoca Oradea Episcopia BihorCFR SAIn execution$100–500mAwarded December 2022
Metrorex Magistrala 6 1 Mai Otopeni PackageMetrorexIn execution$100–500mAwarded March 2025
Cluj-Napoca Tren Metropolitan Cluj infrastructure passenger accessCluj-NapocaIn execution$100–500mAwarded April 2026
CFR Călători R9 Desiro SR 20D overhaulCFR CălătoriIn execution$25–100mAwarded May 2026
CFR Călători R7 Desiro SR 20D power-packCFR CălătoriIn execution$5–25mAwarded March 2026
Municipiul Timișoara new trams Programul Regional VestTimișoaraIn execution$5–25mAwarded February 2026
STB V3A tram modernisation V3A-PPC-CA variantSTBIn execution$5–25mAwarded May 2025
ARF three rail public service contracts 2028ARFPlannedno value published on TEDAnnounced August 2026

Cities

CityNetwork statusNetworks
Bucharestoperational — the Bucharest metro (Metrorex) with the Magistrala 6 airport link and the Magistrala 4 Gara de Nord–Gara Progresul extension both under construction, the STB tram network on the lines STB publishes (1, 4, 5, 7, 10, 11, 21, 23, 25, 27, 32, 41, 47, 53) with the Colentina and Titan depots in procurement, and CFR's București Nord hub on the Rhine–Danube and Orient/East-Mediterranean corridorsBucharest metro (Metrorex); Magistrala 6, 1 Mai – Otopeni airport link (under construction); Magistrala 4 extension, Gara de Nord – Gara Progresul (Sector 4); Bucharest tram network (STB)
Cluj-Napocaunder construction — Tren Metropolitan Cluj, the first stage of the Cluj rapid metropolitan transport system: CF infrastructure and passenger-access works awarded at RON 473.9m, electric multiple units tendered at RON 622.3m, and CFR SA's 50.74 km track renewal Cluj Napoca–Apahida–Jucu–Bonțida closed for bids; the second component of the same first stage is Magistrala I de MetrouTren Metropolitan Cluj (Gilău–Florești–Cluj-Napoca–Baciu–Apahida–Jucu–Bonțida); Magistrala I de Metrou Cluj (Componenta 1 of the same investment); Cluj-Napoca tram network
Timișoaraoperational and being renewed — tram network with new Bozankaya trams arriving (the first of a lot of ten reached the city on 12 September 2026) and tram line renewal inside the city's street reconstruction contracts; CFR's Caransebeș–Timișoara–Arad modernisation runs through the city on the Orient/East-Mediterranean corridorTimișoara tram network (Municipiul Timișoara / STPT)
Iașioperational and being renewed — tram line rehabilitation (Pod Roș–Anastasie Panu closed for bids at RON 94.9m, a second contract awarded at RON 57.8m); CFR SA is tendering the electrification of Iași–border towards Ungheni in Moldova and holds the signalling-centralisation Lot 4 for its Iași and Galați branchesIași tram network (Municipiul Iași / CTP Iași)
Oradeatram network operational; 14 electric tram-trains tendered by Județul Bihor at RON 462.0m to connect the city to its metropolitan zone, with the network side (“Dezvoltarea rețelei de Tram-Train Metropolitan Oradea”) a Programul Transport 2021–2027 project, and CFR's Cluj Napoca–Oradea–Episcopia Bihor electrification in executionOradea tram network; Tram-Train Metropolitan Oradea (in procurement)
Constanțano urban rail; the country's freight rail node — Constanța Port rail infrastructure modernisation Etapa III awarded at RON 523.8m, Etapa I and Etapa II running as CEF Transport projects, the line 816 Palas–Port A second port access closed for bids at RON 404.0m, and the eastern end of both the ERTMS Predeal–București–Constanța programme and Rail Freight Corridor 7

Players with a footprint here

PlayerKindFootprint
SwietelskyTrack & electrification contractorProject presence
ElsitelTrack & electrification contractorProject presence
RotaryTrack & electrification contractorProject presence
UTICivil contractorProject presence
İÇTAŞCivil contractorProject presence

Withheld in the free surface

  • Capex in this region (3)
  • Market narrative

Full detail withheld: 2 fields. In the European Union edition · See a fully open example

  • Infrastructure detail
  • Institutional layer
  • Corridors and freight
  • Procurement routes
  • Unawarded and cancelled

Full detail withheld: 5 fields. In the European Union edition · See a fully open example

Sources

  • ● CNCF “CFR” SA · Achiziţii publice (procurement section index and the legal basis — Law 99/2016, GD 394/2016) (published 2026 · checked 2026-09-12)
  • ● CNCF “CFR” SA · Informaţii achizitii publice (annual programme; “Situație achiziții aflate în derulare — IULIE 2026” and the 2025 contract-execution annex) (published 2026-07 · checked 2026-09-12)
  • ● CNCF “CFR” SA · Proiecte CEF 2021–2027 — the seven CEF Transport projects (published 2026 · checked 2026-09-12)
  • ● CNCF “CFR” SA · Reţeaua feroviară — Pe scurt (network totals, non-interoperable km, turnouts, bridges, tunnels, gauge) (published 2026 · checked 2026-09-12)
  • ● CNCF “CFR” SA · CFR Network Statement 2027 (draft), version 16.0.0, update 21.04.2026, validity 13.12.2026–11.12.2027 — §2.2.1.1 interoperable route length, §2.3.1 track typologies, §2.3.3 stations, §2.3.9 power supply, §2.3.10 signalling, §2.4.4–2.4.5 tunnels and bridges, §1.5 RFC 7 and RFC 9, §3.3 access conditions, abbreviations list (published 2026-04-21 · checked 2026-09-12)
  • ● CNCF “CFR” SA · Proiecte PNRR — the twelve rail projects CFR runs under Romania's recovery plan (published 2026 · checked 2026-09-12)
  • ● CNCF “CFR” SA · Proiecte Programul Transport 2021–2027 — project list with SMIS/MySMIS codes (published 2026 · checked 2026-09-12)
  • ● SNTFC “CFR Călători” SA · Achiziţii publice — annual procurement programme published in SEAP at e-licitatie.ro; transparency statement per OMTI 1121/2012 (published 2026 · checked 2026-09-12)
  • ● European Central Bank · Euro foreign exchange reference rates — full daily history (a permanent file, unlike the rolling 90-day window); record for 11 September 2026: RON 5.2547 and USD 1.1592 per EUR, the two published series EXR.D.RON.EUR.SP00.A and EXR.D.USD.EUR.SP00.A in the ECB Data Portal, implying RON 4.533 per USD (published 2026-09-11 · checked 2026-09-12)
  • ● Municipiul Timișoara · Home page, 12 September 2026 — “Primul tramvai electric din lotul de 10 tramvaie Bozankaya a ajuns la Timișoara” (published 2026-09-12 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “Achiziția de 23 locomotive electrice noi cu sisteme ERTMS, capabile să circule cu o viteză maximă de 160 km/h și să tracteze până la 16 vagoane de călători” plus maintenance; estimated RON 1,572,654,000; participation deadline 10 June 2026 (published 2026-04-27 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Achiziție 12 automotoare în tracțiune electrică pe bază de pile de combustie cu hidrogen” plus maintenance and repair services; awarded RON 1,617,696,763.20 against an estimate of RON 2,468,146,243; Siemens Mobility Austria GmbH and Siemens Mobility GmbH; contract dated 28 April 2026 (published 2026-05-13 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Prior information notice for a public service contract — “Contract de servicii publice nr.1 atribuit competitiv pentru perioada 10/12/2028 - 11/12/2033”, electrified routes București Nord–Constanța, București Nord–Craiova, București Nord–Craiova–Timișoara Nord–Arad, București Nord–Brașov–Arad–Timișoara Nord and București Nord–Craiova–Petroșani–Deva; no value published; ARF contact office@arf.gov.ro, +40 374808535 (published 2026-08-28 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract modification notice — “Achiziția de 20 rame electrice interregionale de lung parcurs RE-IR” plus maintenance; RON 1,604,280,000; POJAZDY SZYNOWE PESA BYDGOSZCZ; original contract 19 December 2023 (published 2025-07-15 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract modification notice — “Achiziționarea de rame electrice regionale, denumite RE-R” plus 15 years of maintenance, in three lots of 20, 23 and 19 units; amounts RON 980,000,000, RON 1,127,000,000 and RON 931,000,000 (total RON 3,038,000,000); POJAZDY SZYNOWE PESA BYDGOSZCZ; original contract 6 November 2024 (published 2025-07-16 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “Achiziționarea a 14 tram-trenuri electrice destinate conectării MUNICIPIULUI ORADEA de ZONA METROPOLITANĂ” plus maintenance and repair services; estimated RON 461,968,200; participation deadline 10 September 2026; buyer JUDEŢUL BIHOR, achizitii@cjbihor.ro, +40 259441317 (published 2026-07-27 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract modification notice — “Reabilitarea liniei de cale ferata Brasov-Simeria, componenta a Coridorului Rin-Dunare, pentru circulatia cu viteza maxima de 160 km/h, sectiunea Brasov-Sighisoara, subsectiunile 1. Brasov-Apata si 3. Cata-Sighisoara”; total RON 3,747,588,308.68; addendum 28 of 09.07.2026; original contract 05.03.2020 (published 2026-07-15 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract modification notice — “Modernizarea liniei feroviare Caransebeș – Timișoara – Arad”, Lot 3 Timișoara Est–Ronaț Triaj Gr.D and Lot 4 Ronaț Triaj Gr.D–Arad; amounts RON 2,184,174,656.60 and RON 1,440,433,361.02; addendum 3 of 08.07.2026 to contract 124/04.11.2022 (published 2026-07-15 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Servicii de revizie tip R9 la automotoarele Desiro SR 20D – Revizie Capitală”; awards to date RON 135,735,226.28 against a framework maximum of RON 155,148,588.60 and a re-estimated RON 159,906,983.59; ELECTROPUTERE VFU PASCANI (published 2026-05-26 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “Achiziția de rame electrice pentru transportul metropolitan de călători” plus maintenance and repair services for the TREN METROPOLITAN CLUJ investment; estimated RON 622,300,000; participation deadline 14 August 2026; buyers Municipiul Cluj-Napoca with the communes Apahida, Baciu, Bonțida, Gârbău and Jucu (published 2026-07-29 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Proiectare și Execuție Lucrări de Infrastructură CF, precum și Lucrări auxiliare pentru accesibilitatea utilizatorilor” for TREN METROPOLITAN CLUJ; awarded RON 473,918,781.10 against an estimate of RON 474,030,818.65; CON-A OPERATIONS with ZUE (published 2026-05-15 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “Lucrări de înlocuire la rând a elementelor suprastructurii de cale ferată pe linia CF Cluj Napoca – Apahida – Jucu – Bonțida (50,74 km)” for the Tren Metropolitan Gilău–Florești–Cluj-Napoca–Baciu–Apahida–Jucu–Bonțida project, 2 lots; estimated RON 227,167,536.54; participation deadline 2 March 2026 (published 2026-01-12 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract modification notice — “Electrificarea și reabilitarea liniei de cale ferată Cluj Napoca – Oradea – Episcopia Bihor”, Lot 3 Poieni–Aleșd and Lot 4 Aleșd–Hungarian border; amounts RON 2,416,850,365.99 and RON 2,117,167,899.08; addendum 3 of 17.08.2026; contracts of 2022 (published 2026-08-19 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Modernizarea infrastructurii feroviare din Portul Constanța – Etapa III”; awarded RON 523,811,174.66 against an estimate of RON 732,237,834.15 and a higher tender of RON 554,645,776.24; SWIETELSKY CONSTRUCT and BAWI CONSTRUCTION (published 2026-07-20 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Reabilitarea liniei feroviare Craiova-Drobeta Turnu Severin-Caransebeș, parte a Coridorului Orient/Est-Mediteranean” Lot 1 and Lot 2; awarded RON 2,037,420,531.88 and RON 1,800,131,764.37 (total RON 3,837,552,296.25) against an estimate of RON 4,963,274,811.48; TERNA and S.C. Alstom Transport S.A. (published 2026-07-22 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — Craiova-Drobeta Turnu Severin-Caransebeș, LOT 3 Igiroasa (Cap Y) – Drobeta Turnu Severin (Cap X), km 331+000–362+632, including the route variant connections to Prunișor and Drobeta Marfă and the Dudașu connection; estimated RON 6,152,376,194.85; participation deadline 3 November 2025 (published 2025-10-29 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — Craiova-Drobeta Turnu Severin-Caransebeș, Lot 4 (km 362+632–404+250) and Lot 5 (km 404+250–436+887); awarded RON 2,143,133,821.64 and RON 2,309,944,931.12 (total RON 4,453,078,752.76); PORR CONSTRUCT S.R.L., ROTARY CONSTRUCTII MENTENANTA, IC IÇTAŞ INŞAAT (published 2025-08-29 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — Craiova-Drobeta Turnu Severin-Caransebeș, Lot 6 (km 436+887–474+046.53); awarded RON 2,114,352,202.96 against the next tender at RON 2,202,993,566.62; IC IÇTAŞ INŞAAT SANAYI VE TICARET A.Ş. and ROTARY CONSTRUCTII MENTENANTA (published 2025-12-22 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “Arhitectură centrală sisteme și securitate cibernetică pentru sistemul informatic feroviar”; estimated RON 110,552,200; participation deadline 21 September 2026, 15:00 (published 2026-08-27 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “Implementarea măsurilor necesare funcționării sistemului ERTMS pe secțiunea de cale ferată Predeal – București – Constanța și extinderea sistemului GSM-R pe rețeaua primară”, ERTMS Level 2 signalling works, LOT 2 Predeal–Buftea and LOT 3 Chitila–Pajura–București Băneasa–Pantelimon–Lehliu–Fetești–Constanța; estimated RON 1,929,177,770.03; participation deadline 27 October 2025 (published 2025-09-25 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “REABILITARE LINII DE TRAMVAI POD ROȘ – ANASTASIE PANU” construction works; estimated RON 94,854,268.26; participation deadline 17 August 2026; buyer Municipiul Iași, licitatii@primaria-iasi.ro, +40 232 267582 (published 2026-07-08 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “INTEGRAREA SISTEMULUI DE CONTROL ACCES AL MAGISTRALEI 4 (RACORD 1 – NICOLAE GRIGORESCU 2 – ANGHEL SALIGNY ȘI RACORD 2 – GARA DE NORD 2 – STRĂULEȘTI) CU MAGISTRALELE 1, 2 ȘI 3 ȘI TL”; estimated RON 101,583,462.30; participation deadline 17 August 2026 (published 2026-08-10 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Legătura reţelei de metrou cu Aeroportul Internaţional Henri Coandă (Magistrala 6. 1 Mai – Otopeni). Pachet 2: Proiectare şi execuţie lucrări de arhitectură, cale de rulare, instalații electromecanice și de curenți slabi”; awarded RON 1,667,516,058.64; ALTIMATE, SALCEF SPA, SOMET, THEDA MAR DESIGN and TIAB; Metrorex contact contact@metrorex.ro, +40 213193601 (published 2025-04-10 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “Reabilitarea și electrificarea liniei cf 816 Palas – Port A, consolidare tunel km 224+670-225+160 pentru a asigura al doilea acces feroviar în Portul Constanța”; estimated RON 404,037,640.92; participation deadline 29 June 2026 (published 2026-05-28 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “DREZINE PANTOGRAF CU PLATFORMĂ TELESCOPICĂ ȘI MACARA”; estimated RON 38,000,000; participation deadline 18 August 2026, 15:00 (published 2026-07-31 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — “Reabilitarea liniei de cale ferată Ploiești Triaj – Focșani”, Etapa I Light Modernization, secțiunea Ploiești Triaj – Valea Călugărească; estimated RON 285,790,124.40; participation deadline 1 September 2026, 15:00 (published 2026-08-06 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — design, designer technical assistance and works for “Lărgire Bd. Dimitrie Pompeiu cu extindere infrastructura de tramvai si străpungere Bd. Barbu Vacarescu” with a connecting road and a Park&Ride; estimated RON 256,418,082.89; participation deadline 21 September 2026 (published 2026-09-04 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract notice — design, designer technical assistance and works for LOT 1 Modernizărea Depoului de Tramvaie Colentina (estimated RON 277,200,401.97) and LOT 2 Modernizărea Depoului de Tramvaie Titan (estimated RON 371,358,479.53), total RON 648,558,881.50; participation deadline 24 September 2026; Municipiul București, Direcția Generală Achiziții Publice, directiaproceduri@pmb.ro, +40 213055530 (published 2026-09-09 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Extinderea rețelei de metrou Magistrala 4 de metrou, secțiunea Gara de Nord – Gara Progresul”; awarded RON 4,691,432,000 and RON 4,383,033,884.22 (total RON 9,074,465,884.22); GP GROUP JSC, Trace Group Hold, DOGUS INSAAT VE TICARET A.S., BOG'ART, CONCELEX and CONSTRUCTII ERBASU; contracting authority Sector 4 (Primăria Sectorului 4 București), achizitiipublice@ps4.ro (published 2026-02-06 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Sporirea eficienței economice și a siguranței feroviare prin creșterea nivelului de centralizare al instalațiilor de semnalizare feroviară”, 2 lots; awarded RON 822,652,514.57 and RON 135,199,228.33 (total RON 957,851,742.90) against an estimate of RON 1,117,092,442.80; Elsitel Elektromekanik, IMSAT and Siemens Mobility (published 2026-07-23 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice recording no award — signalling centralisation Lot 3, Brașov regional branch, sublot 1 Războieni–Târgu Mureș and sublot 2; estimates RON 182,986,996.31 and RON 178,606,173.30 (total RON 361,593,169.61); outcome codes ‘clos-nw’ with reasons ‘all-rej’ and ‘no-rece’ (published 2026-07-31 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — signalling centralisation Lot 4, Iași and Galați regional branches (design and execution); awarded RON 588,616,798.88 against an estimate of RON 654,356,699.40 and a higher tender of RON 637,760,219.78; Elsitel Elektromekanik, IMSAT and Siemens Mobility (published 2026-08-06 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Furnitura pentru modernizare vagoane de tramvai V3A in varianta V3A-PPC-CA”; framework maximum and award RON 30,760,935 against a re-estimated RON 33,954,835; BMF TOTAL SERV; buyer Societatea de Transport Bucuresti STB SA, info@stbsa.ro, +40 213074151 (published 2025-05-27 · checked 2026-09-12)
  • ● Tenders Electronic Daily (TED) · Contract award notice — “Furnizare tramvaie în cadrul proiectului Asigurarea unui transport public local ecologic prin achiziția de tramvaie noi”, SMIS 341003, Programul Regional Vest 2021–2027; awarded RON 105,760,000; Bozankaya Rayli Sistemler A.Ş.; contract dated 19 February 2026 (published 2026-02-24 · checked 2026-09-12)

Browse: the Atlas · European Union · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.