Vermont

3 buyers · 8 tenders · checked 2026-10-08

VTrans funds two Amtrak routes and leases state freight lines; the open federal items are CRISI grants and the western-corridor bridge programme.

Everything here is free. One market edition opens in full with one email. Open your free edition

0Metro systems operating
3Buyers tracked
8Tenders tracked
5Cities tracked
Live pipeline
$19.5m CRISI New England Central Railroad (multi-state grant, signed January 2026); $43.3m federal obligation on the western-corridor freight bridge programme (period to October 2026); $19.5m St. Lawrence & Atlantic Tri-State upgrade (VTrans programme line, three states); $6.0m Vermonter safety CRISI line; $9.5m Amtrak subsidy line (SFY2026); FY2026 rail programme about $62m in total; $65.9m Vermont Railway Hoosick Sub track replacement, $19.1m Green Mountain Railroad and $5.0m Washington County Railroad flood hazard mitigation, $5.1m Cavendish Bridge 132 (state programme lines, FY2026 as passed)
Technology areas
Track & civil, Signalling & train control, Digital operations

Key figures

Vermont active rail570.3 milesActive rail in Vermont per the 2025 Rail Plan, of which 297.6 miles are public-state owned; the largest private line is New England Central at 189.4 miles.
1 source · primary
  • ● 2025 Vermont Rail Plan (December 2025) · State Rail Plan: Amtrak services, 570.3 active route miles with 297.6 state-owned, rail funding outlook, CRISI projects, Corridor ID grants, SFY2026 rail programme (published 2025-12-29 · checked 2026-10-08)
FY2026 rail programme$61,887,348Total of the rail lines in VTrans's FY2026 as-passed Transportation Program; the Rail Plan calls it about $62 million, nearly triple SFY2021, helped by federal grants and FEMA recovery funds.
2 sources · all primary
  • ● VTrans FY2026 Transportation Program - Rail (as passed) · FY2026 as-passed rail programme: total line items, Amtrak operations subsidy, Windsor-St. Albans CRISI(17) and Tri-State Regional Rail Upgrade CRISI(24) lines; also the VTRY(59), REGM2350, REWC2318, GMRC(24), VTRY(45) and RAIL PASS. SERVICE lines (published 2025-06-10 · checked 2026-10-08)
  • ● 2025 Vermont Rail Plan (December 2025) · State Rail Plan: Amtrak services, 570.3 active route miles with 297.6 state-owned, rail funding outlook, CRISI projects, Corridor ID grants, SFY2026 rail programme (published 2025-12-29 · checked 2026-10-08)
Amtrak subsidy, FY2026$9,500,000Amtrak subsidy line in the FY2026 as-passed programme; farebox return is 87 percent on the Ethan Allen Express and 78 percent on the Vermonter per the 2025 Rail Plan summary.
2 sources · all primary
  • ● VTrans FY2026 Transportation Program - Rail (as passed) · FY2026 as-passed rail programme: total line items, Amtrak operations subsidy, Windsor-St. Albans CRISI(17) and Tri-State Regional Rail Upgrade CRISI(24) lines; also the VTRY(59), REGM2350, REWC2318, GMRC(24), VTRY(45) and RAIL PASS. SERVICE lines (published 2025-06-10 · checked 2026-10-08)
  • ● 2025 Vermont Rail Plan executive summary · Two-page summary: farebox return 87 percent on the Ethan Allen Express and 78 percent on the Vermonter, nearly 580 miles of active line, 38 recommended initiatives (published 2025-12-29 · checked 2026-10-08)
NECR CRISI grant$19,524,497FRA CRISI grant to New England Central Railroad signed 27 January 2026, multi-state with Providence & Worcester; Vermont work is on the Swanton and Burlington subdivisions.
1 source · primary
20-year rail capitalabout $300 millionState and federal capital the 2025 Rail Plan expects over 20 years ($5.7 million federal plus $9 million state a year).
1 source · primary
  • ● 2025 Vermont Rail Plan (December 2025) · State Rail Plan: Amtrak services, 570.3 active route miles with 297.6 state-owned, rail funding outlook, CRISI projects, Corridor ID grants, SFY2026 rail programme (published 2025-12-29 · checked 2026-10-08)
Passenger service purchase$99,700,638Total on VTrans's programme line for purchase of interstate rail passenger service, with $90,950,638 expended through FY2024 and $8,750,000 in FY2025; USAspending also records federal-aid transfers to VTrans for Amtrak operations.
2 sources · all primary

Buyers

BuyerTypeTendersContracts awarded
Vermont Agency of Transportation - Rail ProgramState DOT70
New England Central RailroadFreight railroad10
Vermont Rail SystemFreight railroad00

Tenders

Cities

CityNetwork statusNetworks
BurlingtonNorthern terminus of the Ethan Allen Express since the July 2022 extension; Union Station platform on the waterfront, with Vermont Rail System's yard used for overnight storage.
RutlandEthan Allen Express stop and centre of the Vermont Railway; the Green Mountain Railroad runs from Rutland to Bellows Falls and the western-corridor bridge programme runs south to Hoosick, New York.
St. AlbansNorthern terminus of the Vermonter; the New England Central's Italy yard here is in the scope of its CRISI grant.
White River JunctionVermonter stop on the New England Central; start of the Connecticut River line leased to the Washington County Railroad, and site of an FRA-funded accessibility upgrade to the station.
Bellows FallsVermonter stop; eastern end of the Green Mountain Railroad lease that runs to Rutland.

Withheld in the free surface

  • Capex in this region (3)
  • Live pipeline value (3)
  • Market narrative

Full detail withheld: 3 fields. In the United States edition · See a fully open example

  • State leases (2)
  • Corridor id (2)

Full detail withheld: 2 fields. In the United States edition · See a fully open example