Tender · Planned
? How to use this page
How to use a tender page
- What is being bought, for how much, and what happens next.
- Next step tells you the procedure and where the notice is; Watch to follow deadlines and the award.
- Full scope, exact values, dates and bidders open with this market's edition, with a calendar export.
College Drive Overpass at BNSF Crossing
Overpass to close the College Drive at-grade crossing of the BNSF line on WY 212 in Cheyenne, funded by an FRA CRISI Special Transportation Circumstances award
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- Wyoming Department of Transportation (Planning and Railroads)
- Where
- Wyoming · Cheyenne
- Segments
- Civil works, Track
- Technology areas
- Track & civil
- Status
- Planned — Design and environmental work come first; the STIP programmes the let for 2031.
- Value band
- $25–100m
- Currency
- USD
- Key dates (month)
- Award signed December 2025 · Period of performance start October 2025 · Period of performance end November 2037 · Stip let year 2031
Next step
Withheld in the free surface
- Full scope
- Exact value
- How the figure was arrived at
- Key dates (4)
- Published bidders
Full detail withheld: 5 fields. In the United States edition · See a fully open example
3 sources · all primary
- ● USAspending award 69A36526422700CRSWY · FRA CRISI Special Transportation Circumstances award to Wyoming Department of Transportation for the College Drive overpass at the BNSF crossing, Cheyenne: federal 38,683,896, non-federal 9,670,974, signed 19 December 2025, performance to 30 November 2037 (published 2025-12-19 · checked 2026-10-08)
- ● WYDOT FY2026 STIP January addendum · STIP line: reconstruction to include a bridge overpass replacing the College Drive at-grade rail crossing on WY 212 at the BNSF line (USDOT 245617J), programmed 2031, total cost in thousands 48,355, January 2026 amendment (published 2026-01 · checked 2026-10-08)
- ● WYDOT Statewide Rail Plan online meeting 2 · Draft project list (College Drive grade separation, Front Range extension feasibility, Reed Avenue corridor), Section 130 formula funding, STC award for College Drive, FY2026 appropriations notes (published undated · checked 2026-10-08)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Ashmont and Mattapan Infrastructure Upgrades | MBTA | Open | $100–500m | |
| Light Rail Modernization Program Tranche 3 Cromwell Facility | MDOT MTA | Open | estimated cost class L: over $100 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract value | Published July 2026 |
| Cheyenne Area Grade Separation Replacement | WYDOT | Planned | $5–25m |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Red Line Hi-Rail Access Tunnel Alewife | MBTA | Open | $25–100m | |
| Light Rail Metro Facilities Ancillary maintenance construction | MDOT MTA | Open | estimated cost class H: $15 million to $30 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value | |
| MARC Mechanical Ancillary maintenance construction master contract | MDOT MTA | Open | estimated cost class G: $10 million to $15 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value |
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.