DART Madill bridges replacement three design-build

DART Madill bridges replacement — engineering and construction services for three bridges, proposed as a design-build project

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
Dallas Area Rapid Transit
Where
Texas · Dallas
Segments
Civil works
Technology areas
Track & civil
Status
Planned — A state-of-good-repair reserve with cash flow shown in FY2028 in the FY2027 proposed programme; no solicitation appears on DART's public procurement portal as of September 2026.
Value band
$5–25m
Currency
USD
Key dates (month)
Cash flow year 2028

Next step

Planned — no solicitation published.

Read the notice: Dallas Area Rapid Transit ↗

Withheld in the free surface

  • Full scope
  • Exact value
  • How the figure was arrived at
  • Key dates (1)
  • Published bidders

Full detail withheld: 5 fields. In the United States edition · See a fully open example

2 sources · all primary
  • ● Dallas Area Rapid Transit · FY 2026 Annual Budget & 20-Year Financial Plan (adopted; FY2026-FY2030 Capital Improvement Program and FY2026-FY2045 financial plan) (published 2025-09 · checked 2026-09-14)
  • ● Dallas Area Rapid Transit · Proposed FY 2027 Annual Budget & 20-Year Financial Plan (proposed budget as of 11 August 2026; FY2027-FY2031 CIP cash flows with Approved Budget column) (published 2026-08-11 · checked 2026-09-14)

Related tenders

Same buyer first, then the same segment in this market.

TenderBuyerStatusValue bandNext key date
DART New Light Rail Vehicles level boardingDARTOpencontract value not published
DART Silver Line design-build DFW Airport PlanoDARTIn executionover $1bn
DART Silver Line Stadler diesel multiple unitsDARTIn executioncontract value not publishedContract runs to September 2035
Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
Trinity Railway Express Silver Line operations maintenanceDARTIn execution$500m–1bnAwarded September 2015
TRE Double Track Medical Market IH-35E bridgesDARTIn execution$25–100mAwarded June 2026
DART Silver Line Equipment Operations Maintenance FacilityDARTIn execution$5–25mContract runs to May 2026

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.