Philadelphia ZOO Interlocking upgrade Keystone Corridor
Philadelphia ZOO Interlocking upgrade — where the Keystone Corridor meets the Northeast Corridor
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- PennDOT Bureau of Rail, Freight, Ports and Waterways
- Where
- Pennsylvania · Philadelphia
- Segments
- Track, Signalling, Electrification, Civil works
- Technology areas
- Track & civil, Signalling & train control
- Status
- In execution — Phase 1.3, the through-freight bypass contractor work, was completed in mid-2025 and phase 1.1, state-of-good-repair work on the 2 Thru Freight Track, by Amtrak in November 2025.
- Value band
- $25–100m
- Currency
- USD
- Key dates (month)
- Phase 1 3 complete 2025 · Phase 1 1 complete November 2025 · Phase 1 4 anticipated complete May 2026 · Phase 1 2 start 2026
Status in full
Read more
Phase 1.3, the through-freight bypass contractor work, was completed in mid-2025 and phase 1.1, state-of-good-repair work on the 2 Thru Freight Track, by Amtrak in November 2025. Phase 1.4 signal work by Amtrak was anticipated complete in May 2026. For phase 1.2, slope stabilisation, a contractor has been selected and given notice to proceed, and PennDOT, Amtrak and SEPTA were coordinating the schedule and track outage plan for a start in Q3 2026; the contract was advanced early to allow for long-lead materials.
Next step
Withheld in the free surface
- Full scope
- Exact value
- How the figure was arrived at
- Key dates (4)
- Published bidders
Full detail withheld: 5 fields. In the United States edition · See a fully open example
2 sources · all primary
- ● Pennsylvania Department of Transportation · Advancing PA Rail — Philadelphia ZOO Interlocking (published 2026 · checked 2026-09-13)
- ● Pennsylvania Department of Transportation · Advancing PA Rail — Projects index with active and completed status (published 2026 · checked 2026-09-13)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Keystone West Norfolk Southern infrastructure projects | PennDOT Rail Bureau | In execution | $100–500m | |
| Coatesville Station reconstruction Keystone Corridor | PennDOT Rail Bureau | In execution | $25–100m | Completion 2026 |
| Downingtown Station relocation Keystone Corridor | PennDOT Rail Bureau | Planned | value not published | Target 2027 |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Ashmont and Mattapan Infrastructure Upgrades | MBTA | Open | $100–500m | |
| Paoli-Darby Road project Keystone Corridor | PennDOT Rail Bureau | Planned | $25–100m | |
| PennDOT Rail Freight Transportation Assistance Programs | PennDOT Rail Bureau | Planned | no 2026 round award published; PennDOT's State Rail Plan publishes the five preceding rounds at $26.0m to $42.5m a year |
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.