Madrid to Lamy positive train control
Positive train control on the 24-mile Amtrak-only line between CP Madrid and Lamy
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- Rio Metro Regional Transit District
- Where
- New Mexico · Santa Fe
- Segments
- Signalling
- Technology areas
- Signalling & train control
- Status
- Planned — Design and construction await Amtrak, NMDOT and Rio Metro agreements; completion expected end of 2027.
- Value band
- $5–25m
- Currency
- USD
- Key dates (month)
- Amtrak expected completion December 2027
Next step
Withheld in the free surface
- Full scope
- Exact value
- How the figure was arrived at
- Key dates (1)
- Published bidders
Full detail withheld: 5 fields. In the United States edition · See a fully open example
2 sources · all primary
- ● Rio Metro Regional Transit District Budget and Capital Plan FY2027-FY2031 · Adopted 15 May 2026; Rail Runner budget (Tables 1-1, 1-2), capital maintenance programme, funded and unfunded capital projects (Tables 2-2, 2-3), partner pass-through projects (Table 2-4) (published 2026-05-15 · checked 2026-10-08)
- ● New Mexico State Rail Plan, February 2026 · NMDOT State Rail Plan prepared by Huitt-Zollars; read page by page: ownership and operation of Rail Runner (pp. 30-40), funding programmes (pp. 91-96), short-range investment programme (pp. 115-119), long-range programme (p. 127-128) (published 2026-02-13 · checked 2026-10-08)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Rail Runner maintenance facility design-build | Rio Metro | Bids closed | $25–100m | |
| Downtown Albuquerque centralised traffic control | Rio Metro | In execution | $5–25m | |
| Rail Runner maintenance facility phase 2 | Rio Metro | Planned | $5–25m |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Rail Runner Alameda siding | Rio Metro | In execution | $5–25m | |
| Belen CP Ross extension | Rio Metro | Planned | $5–25m | |
| Los Lunas siding | Rio Metro | Planned | $5–25m |
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.