? How to use this page
How to use a buyer page
- Who this buyer is, then who already holds positions here and what it is tendering.
- Click Watch and every change lands in your weekly digest.
- How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.
Rio Metro Regional Transit District
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Type
- Transit authority — Regional transit district for the Albuquerque area, formed in 2005; NMDOT's managing agency for the Rail Runner Express. Staffed through the Mid-Region Council of Governments, which posts its bids.
- Market · Region
- United States · New Mexico
- Open tenders
- 0
- Technology areas
- Track & civil, Signalling & train control, Rolling-stock hardware
Manages the Rail Runner for NMDOT and is procuring a new maintenance facility in Albuquerque.
About this buyer
Read more
Sets Rail Runner schedules and fares, dispatches trains and maintains NMDOT's railroad, contracting Herzog Transit Services for operations and maintenance. The fleet is nine MP36PH-3C locomotives, nine cab cars and 13 coaches. Its Budget and Capital Plan, adopted on 15 May 2026, centres on a new operations and maintenance facility in Albuquerque, now in design-build qualifications, with completed signalling and siding work and a list of unfunded sidings, rolling stock and bridge projects behind it. It also runs bus and dial-a-ride services and pays the Rail Runner's state infrastructure bank loan for positive train control.
- Type
- Transit authority — Regional transit district for the Albuquerque area, formed in 2005; NMDOT's managing agency for the Rail Runner Express. Staffed through the Mid-Region Council of Governments, which posts its bids.
- Where
- New Mexico · Albuquerque
- Programmes
- FRA Consolidated Rail Infrastructure and Safety Improvements
- Technology areas
- Track & civil, Signalling & train control, Rolling-stock hardware
Structure
- operates for NMDOT — Managing agency for Rail Runner and NMDOT's railroad operations and maintenance; sets schedules and fares and dispatches trains (active)
- funded by FTA — Grant NM-2026-037, FY2025 BUILD grant for the Rail Runner operations and maintenance facility (22 September 2026 to 30 September 2033) (active)
- funded by FTA — Grant NM-2026-038, formula funds for construction of the first phase of the operations and maintenance facility (24 September 2026 to 30 September 2033) (active)
- funded by FTA — Grant NM-2026-019, centralised traffic control and positive train control near downtown Albuquerque (14 July 2026 to 1 October 2027) (active)
- funded by FTA — Grants NM-2025-020 (Section 5337 state of good repair) and NM-2025-021 (Section 5307), both signed 25 September 2025, for Rail Runner equipment and track maintenance (active)
- funded by FTA — Grant NM-2019-013, CRISI railroad safety technology grant for Rail Runner positive train control (12 April 2019 to 31 March 2020) (ended)
Who holds what here
- awarded Herzog — Rail Runner operations and maintenance, including track, signal and equipment maintenance (Herzog Transit Services) (active)
- Contract detail and values (7)$25–100m · $5–25mIn the United States edition See a fully open example
Sources for these relationships (8)
- ● New Mexico State Rail Plan, February 2026 · NMDOT State Rail Plan prepared by Huitt-Zollars; read page by page: ownership and operation of Rail Runner (pp. 30-40), funding programmes (pp. 91-96), short-range investment programme (pp. 115-119), long-range programme (p. 127-128) (published 2026-02-13 · checked 2026-10-08)
- ● USAspending.gov - FTA grant NM-2025-021, Rio Metro Regional Transit District · Federal award record: $25,817,101, Federal Transit Formula Grants (Section 5307 large urban), signed 25 September 2025, period to 1 July 2027; maintenance of equipment and way for the Rail Runner (published 2025-09-25 · checked 2026-10-08)
- ● USAspending.gov - FTA award NM-2026-037, Rio Metro Regional Transit District · Federal award record: $22,477,133, National Infrastructure Investments (FY2025 BUILD grant), signed 22 September 2026, period to 30 September 2033; construction of the Rail Runner operations and maintenance facility (maintenance shop for four locomotives or cars, service station, new and relocated track) (published 2026-09-22 · checked 2026-10-08)
- ● USAspending.gov - FTA grant NM-2026-019, Rio Metro Regional Transit District · Federal award record: $8,290,500, Federal Transit Formula Grants, signed 14 July 2026, period to 1 October 2027; centralised traffic control and positive train control on a 4.7-mile double-track segment near downtown Albuquerque (control points Hahn, Abajo, Marquette, Maine) (published 2026-07-14 · checked 2026-10-08)
- ● USAspending.gov - FTA grant NM-2026-038, Rio Metro Regional Transit District · Federal award record: $17,249,999, Federal Transit Formula Grants, signed 24 September 2026, period to 30 September 2033; first phase of the Rail Runner operations and maintenance facility (two-track shop, crane, service station, yard track, drainage) (published 2026-09-24 · checked 2026-10-08)
- ● USAspending.gov - award NM-2019-013, Rio Metro Regional Transit District · Federal award record: $29,359,208, Railroad Safety Technology Grants (CRISI), signed 12 April 2019, period ended 31 March 2020, awarding sub-agency shown as the Federal Transit Administration; Rio Metro NMRX positive train control implementation project (published 2019-04-12 · checked 2026-10-08)
- ● USAspending.gov - FTA grant NM-2025-020, Rio Metro Regional Transit District · Federal award record: $27,195,676, State of Good Repair Grants Program, signed 25 September 2025, period to 1 July 2028; maintenance of equipment and way for the Rail Runner (9 locomotives, 9 cab cars, 13 coach cars, about 96.5 miles of right-of-way) (published 2025-09-25 · checked 2026-10-08)
- ● Rio Metro Regional Transit District Budget and Capital Plan FY2027-FY2031 · Adopted 15 May 2026; Rail Runner budget (Tables 1-1, 1-2), capital maintenance programme, funded and unfunded capital projects (Tables 2-2, 2-3), partner pass-through projects (Table 2-4) (published 2026-05-15 · checked 2026-10-08)
Tenders
| Tender | Status | Value band | Next key date |
|---|---|---|---|
| Rail Runner maintenance facility design-build | Bids closed | $25–100m | |
| Rail Runner Alameda siding | In execution | $5–25m | |
| Downtown Albuquerque centralised traffic control | In execution | $5–25m | |
| Sidings and platforms for reliability | Planned | $25–100m | |
| Sidings and platforms for hourly service | Planned | $25–100m | |
| Belen CP Ross extension | Planned | $5–25m | |
| Madrid to Lamy positive train control | Planned | $5–25m | |
| Los Lunas siding | Planned | $5–25m | |
| Rail Runner maintenance facility phase 2 | Planned | $5–25m | |
| Two additional Rail Runner locomotives | Planned | $5–25m |
Withheld in the free surface
- Procurement structure
- Published contacts (3)
- Award history (7)
- Entry path
Full detail withheld: 4 fields. In the United States edition · See a fully open example
14 sources · all primary
- ● Rio Metro Regional Transit District bid postings · Open bids listing read 8 October 2026: four RFPs (on-call general construction closing 9 October 2026; three Mid-Region Council of Governments GRO Fund programme RFPs closing 2 November 2026) and one open job-access RFQ; no rail capital solicitation is open (published 2026-10-08 · checked 2026-10-08)
- ● Rio Metro RFQ 2026-01, Rail Runner Operations and Maintenance Facility Design Build · Bid posting: statements of qualifications requested for design-build of the Rail Runner operations and maintenance facility in Albuquerque; shortlist of up to three; published 14 June 2026; closed 31 July 2026; documents through Autodesk BuildingConnected (published 2026-06-14 · checked 2026-10-08)
- ● Rio Metro RFP 2025-01, NMRX Operations and Maintenance Facility Design Consultant and Owner Representative · Bid posting: qualifications-based selection of a facility design consultant and owner's representative using a two-step design-build bridging method; issued 16 August 2024; closed 27 September 2024 (published 2024-08-16 · checked 2026-10-08)
- ● Rio Metro ITB 2026-03, Provide Diesel Fuel for the New Mexico Rail Runner Express · Bid posting: awarded (recipient TAC Energy); published 1 July 2026; closed 3 August 2026; no value published (published 2026-07-01 · checked 2026-10-08)
- ● Rio Metro RFP 2026-02, On-Call General Construction Services · Bid posting: multiple on-call firms for transit facility improvements at Rio Metro, MRCOG and workforce facilities; published 9 September 2026; closes 9 October 2026; no value published (published 2026-09-09 · checked 2026-10-08)
- ● Rio Metro Regional Transit District Budget and Capital Plan FY2027-FY2031 · Adopted 15 May 2026; Rail Runner budget (Tables 1-1, 1-2), capital maintenance programme, funded and unfunded capital projects (Tables 2-2, 2-3), partner pass-through projects (Table 2-4) (published 2026-05-15 · checked 2026-10-08)
- ● Rio Metro Publications page · Index of the Budget and Capital Plan (May 2026), the Double Track Study (2022), the Transit Consolidation Study final report (December 2025) and other plans (published 2026-10-08 · checked 2026-10-08)
- ● New Mexico State Rail Plan, February 2026 · NMDOT State Rail Plan prepared by Huitt-Zollars; read page by page: ownership and operation of Rail Runner (pp. 30-40), funding programmes (pp. 91-96), short-range investment programme (pp. 115-119), long-range programme (p. 127-128) (published 2026-02-13 · checked 2026-10-08)
- ● USAspending.gov - FTA award NM-2026-037, Rio Metro Regional Transit District · Federal award record: $22,477,133, National Infrastructure Investments (FY2025 BUILD grant), signed 22 September 2026, period to 30 September 2033; construction of the Rail Runner operations and maintenance facility (maintenance shop for four locomotives or cars, service station, new and relocated track) (published 2026-09-22 · checked 2026-10-08)
- ● USAspending.gov - FTA grant NM-2026-038, Rio Metro Regional Transit District · Federal award record: $17,249,999, Federal Transit Formula Grants, signed 24 September 2026, period to 30 September 2033; first phase of the Rail Runner operations and maintenance facility (two-track shop, crane, service station, yard track, drainage) (published 2026-09-24 · checked 2026-10-08)
- ● USAspending.gov - FTA grant NM-2026-019, Rio Metro Regional Transit District · Federal award record: $8,290,500, Federal Transit Formula Grants, signed 14 July 2026, period to 1 October 2027; centralised traffic control and positive train control on a 4.7-mile double-track segment near downtown Albuquerque (control points Hahn, Abajo, Marquette, Maine) (published 2026-07-14 · checked 2026-10-08)
- ● USAspending.gov - FTA grant NM-2025-020, Rio Metro Regional Transit District · Federal award record: $27,195,676, State of Good Repair Grants Program, signed 25 September 2025, period to 1 July 2028; maintenance of equipment and way for the Rail Runner (9 locomotives, 9 cab cars, 13 coach cars, about 96.5 miles of right-of-way) (published 2025-09-25 · checked 2026-10-08)
- ● USAspending.gov - FTA grant NM-2025-021, Rio Metro Regional Transit District · Federal award record: $25,817,101, Federal Transit Formula Grants (Section 5307 large urban), signed 25 September 2025, period to 1 July 2027; maintenance of equipment and way for the Rail Runner (published 2025-09-25 · checked 2026-10-08)
- ● USAspending.gov - award NM-2019-013, Rio Metro Regional Transit District · Federal award record: $29,359,208, Railroad Safety Technology Grants (CRISI), signed 12 April 2019, period ended 31 March 2020, awarding sub-agency shown as the Federal Transit Administration; Rio Metro NMRX positive train control implementation project (published 2019-04-12 · checked 2026-10-08)
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.