Buyer · Transit authority
? How to use this page

How to use a buyer page

  1. Who this buyer is, then who already holds positions here and what it is tendering.
  2. Click Watch and every change lands in your weekly digest.
  3. How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.

Rio Metro Regional Transit District

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Type
Transit authority — Regional transit district for the Albuquerque area, formed in 2005; NMDOT's managing agency for the Rail Runner Express. Staffed through the Mid-Region Council of Governments, which posts its bids.
Market · Region
United States · New Mexico
Open tenders
0
Technology areas
Track & civil, Signalling & train control, Rolling-stock hardware

Manages the Rail Runner for NMDOT and is procuring a new maintenance facility in Albuquerque.

About this buyer

Read more

Sets Rail Runner schedules and fares, dispatches trains and maintains NMDOT's railroad, contracting Herzog Transit Services for operations and maintenance. The fleet is nine MP36PH-3C locomotives, nine cab cars and 13 coaches. Its Budget and Capital Plan, adopted on 15 May 2026, centres on a new operations and maintenance facility in Albuquerque, now in design-build qualifications, with completed signalling and siding work and a list of unfunded sidings, rolling stock and bridge projects behind it. It also runs bus and dial-a-ride services and pays the Rail Runner's state infrastructure bank loan for positive train control.

Type
Transit authority — Regional transit district for the Albuquerque area, formed in 2005; NMDOT's managing agency for the Rail Runner Express. Staffed through the Mid-Region Council of Governments, which posts its bids.
Where
New Mexico · Albuquerque
Programmes
FRA Consolidated Rail Infrastructure and Safety Improvements
Technology areas
Track & civil, Signalling & train control, Rolling-stock hardware

Structure

  • operates for NMDOT — Managing agency for Rail Runner and NMDOT's railroad operations and maintenance; sets schedules and fares and dispatches trains (active)
  • funded by FTA — Grant NM-2026-037, FY2025 BUILD grant for the Rail Runner operations and maintenance facility (22 September 2026 to 30 September 2033) (active)
  • funded by FTA — Grant NM-2026-038, formula funds for construction of the first phase of the operations and maintenance facility (24 September 2026 to 30 September 2033) (active)
  • funded by FTA — Grant NM-2026-019, centralised traffic control and positive train control near downtown Albuquerque (14 July 2026 to 1 October 2027) (active)
  • funded by FTA — Grants NM-2025-020 (Section 5337 state of good repair) and NM-2025-021 (Section 5307), both signed 25 September 2025, for Rail Runner equipment and track maintenance (active)
  • funded by FTA — Grant NM-2019-013, CRISI railroad safety technology grant for Rail Runner positive train control (12 April 2019 to 31 March 2020) (ended)

Who holds what here

  • awarded Herzog — Rail Runner operations and maintenance, including track, signal and equipment maintenance (Herzog Transit Services) (active)
Sources for these relationships (8)
  • ● New Mexico State Rail Plan, February 2026 · NMDOT State Rail Plan prepared by Huitt-Zollars; read page by page: ownership and operation of Rail Runner (pp. 30-40), funding programmes (pp. 91-96), short-range investment programme (pp. 115-119), long-range programme (p. 127-128) (published 2026-02-13 · checked 2026-10-08)
  • ● USAspending.gov - FTA grant NM-2025-021, Rio Metro Regional Transit District · Federal award record: $25,817,101, Federal Transit Formula Grants (Section 5307 large urban), signed 25 September 2025, period to 1 July 2027; maintenance of equipment and way for the Rail Runner (published 2025-09-25 · checked 2026-10-08)
  • ● USAspending.gov - FTA award NM-2026-037, Rio Metro Regional Transit District · Federal award record: $22,477,133, National Infrastructure Investments (FY2025 BUILD grant), signed 22 September 2026, period to 30 September 2033; construction of the Rail Runner operations and maintenance facility (maintenance shop for four locomotives or cars, service station, new and relocated track) (published 2026-09-22 · checked 2026-10-08)
  • ● USAspending.gov - FTA grant NM-2026-019, Rio Metro Regional Transit District · Federal award record: $8,290,500, Federal Transit Formula Grants, signed 14 July 2026, period to 1 October 2027; centralised traffic control and positive train control on a 4.7-mile double-track segment near downtown Albuquerque (control points Hahn, Abajo, Marquette, Maine) (published 2026-07-14 · checked 2026-10-08)
  • ● USAspending.gov - FTA grant NM-2026-038, Rio Metro Regional Transit District · Federal award record: $17,249,999, Federal Transit Formula Grants, signed 24 September 2026, period to 30 September 2033; first phase of the Rail Runner operations and maintenance facility (two-track shop, crane, service station, yard track, drainage) (published 2026-09-24 · checked 2026-10-08)
  • ● USAspending.gov - award NM-2019-013, Rio Metro Regional Transit District · Federal award record: $29,359,208, Railroad Safety Technology Grants (CRISI), signed 12 April 2019, period ended 31 March 2020, awarding sub-agency shown as the Federal Transit Administration; Rio Metro NMRX positive train control implementation project (published 2019-04-12 · checked 2026-10-08)
  • ● USAspending.gov - FTA grant NM-2025-020, Rio Metro Regional Transit District · Federal award record: $27,195,676, State of Good Repair Grants Program, signed 25 September 2025, period to 1 July 2028; maintenance of equipment and way for the Rail Runner (9 locomotives, 9 cab cars, 13 coach cars, about 96.5 miles of right-of-way) (published 2025-09-25 · checked 2026-10-08)
  • ● Rio Metro Regional Transit District Budget and Capital Plan FY2027-FY2031 · Adopted 15 May 2026; Rail Runner budget (Tables 1-1, 1-2), capital maintenance programme, funded and unfunded capital projects (Tables 2-2, 2-3), partner pass-through projects (Table 2-4) (published 2026-05-15 · checked 2026-10-08)

Tenders

Withheld in the free surface

  • Procurement structure
  • Published contacts (3)
  • Award history (7)
  • Entry path

Full detail withheld: 4 fields. In the United States edition · See a fully open example

14 sources · all primary

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.