S-Line 162-mile Raleigh-Richmond corridor survey
S-Line corridor survey and design-engineering — CRISI federal grant to NCDOT for the full 162-mile Raleigh-Richmond corridor
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- North Carolina Department of Transportation, Rail Division
- Where
- North Carolina · Raleigh
- Segments
- Civil works, Track, Consultancy
- Technology areas
- Track & civil, Digital operations
- Status
- In execution — Secured in 2022 for survey work and preliminary engineering across the 162-mile Raleigh-Richmond corridor.
- Value band
- $25–100m
- Currency
- USD
- Key dates (month)
- Grant secured 2022 · Design engineering approval noted February 2026
Status in full
Read more
Secured in 2022 for survey work and preliminary engineering across the 162-mile Raleigh-Richmond corridor. NCDOT's February 2026 press release states it 'has also recently received approval from the FRA to progress a design engineering grant for the entire 162-mile rail corridor between Raleigh and Richmond, Virginia' — read here as the same grant advancing from preliminary engineering into design engineering, not a second award; no source separately itemises the two phases' funding.
Next step
Withheld in the free surface
- Full scope
- Exact value
- How the figure was arrived at
- Key dates (2)
- Note on the figure
Full detail withheld: 5 fields. In the United States edition · See a fully open example
2 sources · all primary
- ● North Carolina Department of Transportation (official) — S-Line Raleigh to Richmond project · S-Line project scope (162 miles), Raleigh-Wake Forest first segment (18 miles), funding history and construction milestones (published 2026 · checked 2026-09-20)
- ● North Carolina Department of Transportation (official) — press release · Construction Advances on S-Line Rail Corridor in Wake County: New Hope Church Road grade-separation construction under way, about $22.7 million and three years of work; notes NCDOT's recent FRA approval to progress a $58 million design-engineering grant for the full 162-mile Raleigh-Richmond corridor (published 2026-02-26 · checked 2026-09-20)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| S-Line Raleigh-Richmond 18-mile Raleigh-Wake Forest | NCDOT Rail Division | In execution | over $1bn | |
| S-Line corridor Raleigh-Ridgeway property acquisition | NCDOT Rail Division | In execution | $25–100m | |
| S-Line Durant Road grade-separation North Raleigh | NCDOT Rail Division | In execution | $5–25m | Awarded July 2024 |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Ashmont and Mattapan Infrastructure Upgrades | MBTA | Open | $100–500m | |
| FRRCSI 2026 grants 12 short lines | NCDOT Rail Division | Awarded | $25–100m | Awarded January 2026 |
| S-Line New Hope Church Road grade-separation Raleigh | NCDOT Rail Division | In execution | $5–25m |
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.