Traction power substation system replacement

Traction power substation system replacement — 68 substations and 16 gap breaker stations

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
Metropolitan Atlanta Rapid Transit Authority
Where
Georgia · Atlanta
Segments
Electrification
Status
Planned — Programmed in FY2027 and across FY2027–FY2036.
Value band
$100–500m
Currency
USD
Key dates (month)
Cip published April 2026 · Budget adopted May 2026 · Fiscal year from July 2026

Part of MARTA traction power substation replacement, in waves · 2 parts. Other parts: Traction power substation equipment replacement Wave 1.

Status in full

Read more

Programmed in FY2027 and across FY2027–FY2036. MARTA states that in FY2027 the Auxiliary Power Rooms Replacement Program will award a contract for the implementation of Wave 1, during which the equipment will be approved for manufacturing and installed in later fiscal years. One contract against this scope is already let and is carried separately in this file: B50502, Traction Power Substation Equipment Replacement Program – Wave 1, awarded to Cleveland Electric Company in November 2025. The programme budget here is separate from the contract award and the two figures are not added.

Next step

Planned — sanctioned May 2026.

Read the notice: Metropolitan Atlanta Rapid Transit Authority ↗

Withheld in the free surface

  • Full scope
  • Exact value
  • How the figure was arrived at
  • Key dates (3)
  • Published bidders

Full detail withheld: 5 fields. In the United States edition · See a fully open example

4 sources · all primary
  • ● Metropolitan Atlanta Rapid Transit Authority · FY2027 Proposed Capital Improvement Program Budget (April 2026), including Attachment A — State of Good Repair proposed projects ten-year forecast FY27–FY36 (PDF pages 19–21, text layer), Attachment B — MARTA City of Atlanta proposed projects ten-year forecast (PDF page 22) and Attachment C — MARTA Clayton County proposed projects ten-year forecast (PDF page 23); Attachments B and C carry no text layer and were read as pixels rendered at 300 dpi on 14 September 2026 (published 2026-04 · checked 2026-09-14)
  • ● Metropolitan Atlanta Rapid Transit Authority · FY27 Operating and Capital Budget Highlights (one pager) — capital sources and uses, top ten State of Good Repair projects by FY27 funds programmed (published 2026-04 · checked 2026-09-14)
  • ● Metropolitan Atlanta Rapid Transit Authority · FY26 MARTOC Annual Report — including the schedule of Payments and Contracts $20,000 or More for 1 July 2025 to 30 June 2026 (vendor, purpose, contract number, award date, base term with options, award amount, paid to date) (published 2026 · checked 2026-09-14)
  • ● Metropolitan Atlanta Rapid Transit Authority · Board of Directors meeting summary and resolutions, 11 June 2026 (published 2026-06-11 · checked 2026-09-14)

Related tenders

Same buyer first, then the same segment in this market.

TenderBuyerStatusValue bandNext key date
CQ400 heavy rail car procurementMARTAIn execution$500m–1bnAwarded November 2019
Communications-Based Train ControlMARTAIn execution$500m–1bnAwarded December 2024
Better Breeze Automated Fare Collection SystemMARTAIn execution$100–500mAwarded January 2024
Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
Station Rehabilitation Program construction managementMARTAIn execution$100–500mAwarded March 2020
Station Rehabilitation Program architectural engineering designMARTAIn execution$25–100mAwarded February 2020
Direct Fixation Rail Fastener ReplacementMARTAIn execution$25–100mAwarded June 2026