Florida

9 buyers · 38 tenders · checked 2026-10-03

Miami-Dade: $4.66bn (North Corridor $4.20bn); Northeast Corridor $927.3m; Tri-Rail $88.19m Siemens locomotives; Jacksonville converting Skyway ($240.08m); Brightline 235-mile.

Everything here is free. One market edition opens in full with one email. Open your free edition

4Metro systems operating
9Buyers tracked
38Tenders tracked
6Cities tracked
Live pipeline
$4.2bn SMART North Corridor, $927.3m SMART Northeast Corridor, $370.7m Metromover programme, $240.1m Skyway conversion, $205.1m Tri-Rail rolling stock project, $91.4m Miami River–Miami Intermodal Center low bid, $78.9m St Lucie River bridge and $57.5m Cocoa station grants; 38 tracked procurements, 2 open today
Technology areas
Rolling-stock hardware, Signalling & train control, Track & civil, Electrification, Predictive maintenance, Digital operations, AI inspection, Cybersecurity

Key figures

Miami-Dade Metrorail Projects r…$4.658 billionMiami-Dade Metrorail Projects row in the FY 2026-27 proposed multi-year capital plan, which contains the $4.200bn SMART North Corridor extension and $458.4m of other Metrorail work; a further $370.7m of Metromover projects and $2.309bn of mass transit projects are separate rows
1 source · primary
  • ● Miami-Dade County · FY 2026-27 Proposed Budget and Multi-Year Capital Plan, Volume 3 — Transportation and Public Works (capital project pages and Unfunded Capital Programs table) (published 2026 · checked 2026-09-14)
SMART Plan North Corridor$4.200 billionSMART Plan North Corridor — 9.5 miles of elevated Metrorail guideway, stations and parking to the Broward county line; $3,624,864,000 of construction scheduled in 2031-32, inside the county’s $4.658bn Metrorail Projects row, not additional to it
2 sources · all primary
  • ● Miami-Dade County · FY 2026-27 Proposed Budget and Multi-Year Capital Plan, Volume 3 — Transportation and Public Works (capital project pages and Unfunded Capital Programs table) (published 2026 · checked 2026-09-14)
  • ● Miami-Dade County · SMART Plan — North Corridor (published 2026 · checked 2026-09-14)
SMART Plan Northeast Corridor$927.3 millionSMART Plan Northeast Corridor — 13.5 miles of commuter rail from Miami Central to West Aventura on the Florida East Coast alignment, budgeted outside the Metrorail Projects row and additional to it; in the FTA New Starts Engineering phase with a Medium-High rating
2 sources · all primary
  • ● Miami-Dade County · FY 2026-27 Proposed Budget and Multi-Year Capital Plan, Volume 3 — Transportation and Public Works (capital project pages and Unfunded Capital Programs table) (published 2026 · checked 2026-09-14)
  • ● Miami-Dade County · SMART Plan — Northeast Corridor (published 2026 · checked 2026-09-14)
Total project cost of the Tri-R…$205.05 millionTotal project cost of the Tri-Rail rolling stock programme — seven Siemens Charger locomotives and a simulator at $88,193,000 awarded, coach and cab cars still to be procured
1 source · primary
SunRail total operating costs a…$81.50 millionSunRail total operating costs and consultant support in FDOT fiscal year 2025-26, of which $68,504,191 is system operating cost across the Alstom, Herzog, moovel and Amtrak contract lines
1 source · primary
  • ● Central Florida Commuter Rail Commission · CFCRC 22 January 2026 meeting package (FY25/26 operating budget update; foundational-agreement review schedule; transition workshop) (published 2026-01 · checked 2026-09-14)
Local Option Gas Tax dedicated…$246.84 millionLocal Option Gas Tax dedicated funding for the Jacksonville Skyway rehabilitation and downtown service expansion — $240,075,000 capital and $6,765,000 fleet
1 source · primary
Brightline Florida ridership in…289,388 passengersBrightline Florida ridership in July 2026, up 13% year on year, on 1,099 train departures with 90% on-time performance across an approximately 235-mile Miami–Orlando system
1 source · primary
  • ● Brightline Trains Florida LLC · Brightline Florida Monthly Revenue and Ridership Report, July 2026 (Tampa Extension / Sunshine Corridor, Cocoa and Stuart stations, St. Lucie River Bridge, ridership) (published 2026-08 · checked 2026-09-14)
Florida’s freight rail network…2,738.31 mainline milesFlorida’s freight rail network in the 2023 Florida Rail System Plan — more than 3,800 track-miles, two Class I railroads, one Class II and multiple Class III carriers, and 5,324 at-grade highway-rail crossings at December 2021 of which 4,025 are on public roads
1 source · primary
  • ● Florida Department of Transportation · Florida Rail System Plan 2023, Chapter 2: Florida’s Existing Rail System (2,738.31 mainline miles; 5,324 at-grade crossings at December 2021) (published 2023-10 · checked 2026-09-14)
Low bid on FDOT contract E4Y08$91.36 millionLow bid on FDOT contract E4Y08, the Miami River – Miami Intermodal Center Capacity Improvement, at District Four’s letting of 31 July 2026 (Prince-Railworks JV), against FDOT’s $78,559,965 proposal budget estimate and 1,022 contract days; the completion of double-tracking on the South Florida Rail Corridor
3 sources · all primary
Federal station and bridge gran…$136.4 millionFederal station and bridge grants announced by the USDOT / FRA National Railroad Partnership Program in August 2026 — approximately $57.5m for the Cocoa Multimodal Station and Rail Project and approximately $78.9m to the City of Stuart for the St Lucie River Bridge Rehabilitation; both figures as reported by Brightline Trains Florida LLC in its bondholder disclosure
1 source · primary
  • ● Brightline Trains Florida LLC · Brightline Florida Monthly Revenue and Ridership Report, July 2026 (Tampa Extension / Sunshine Corridor, Cocoa and Stuart stations, St. Lucie River Bridge, ridership) (published 2026-08 · checked 2026-09-14)
SunRail’s own description of th…over 49 miles, 16 stationsSunRail’s own description of the system it operates through Volusia, Seminole, Orange and Osceola counties
1 source · primary
  • ● Florida Department of Transportation (SunRail) · SunRail home page — “The system currently operates over 49 miles with 16 stations through Volusia, Seminole, Orange, and Osceola counties” (page description and schema.org block) (published 2026-02 · checked 2026-09-14)

Buyers

Tenders

TenderBuyerStatusValue bandNext key date
SFRTA General Engineering Consultant servicesSFRTA / Tri-RailOpenvalue not publishedCloses October 2026
Miami River Miami Intermodal Center Capacity ImprovementFDOT RailBids closed$25–100mBids closed July 2026 · award expected
South Miami Metrorail station parking garageMiami-Dade DTPWBids closed$5–25m
U²C Phase II and III design-build servicesJTABids closedvalue not publishedBids closed November 2025 · award expected
Metromover Comprehensive Wayside System OverhaulMiami-Dade DTPWIn execution$100–500mCompletion July 2022
Tri-Rail Northern Layover Light Maintenance FacilitySFRTA / Tri-RailIn execution$25–100m
Alstom SunRail operations and maintenanceFDOT RailIn execution$25–100m
Tri-Rail Siemens Charger locomotive fleet replacementSFRTA / Tri-RailIn execution$25–100mAwarded December 2025
SunRail positive train control Herzog AlstomFDOT RailIn execution$5–25m
Tri-Rail positive train control operations maintenanceSFRTA / Tri-RailIn execution$5–25m
SMART Plan North Corridor Metrorail extensionMiami-Dade DTPWPlannedover $1bn
SMART Plan Northeast Corridor Miami AventuraMiami-Dade DTPWPlanned$500m–1bn
Metromover controls station repairs escalators liftsMiami-Dade DTPWPlanned$100–500m
Metrorail stations and systems improvementsMiami-Dade DTPWPlanned$100–500m
Metrorail track and guideway rehabilitationMiami-Dade DTPWPlanned$100–500m
Metrorail train control upgradeMiami-Dade DTPWPlanned$100–500m
Metrorail vehicle replacement 136 heavy rail carsMiami-Dade DTPWPlanned$100–500m
U²C Phase 2 Skyway conversionJTAPlanned$100–500m
Cocoa Multimodal Station and Rail ProjectCocoaPlanned$25–100m
Metrorail Lehman Yard improvementsMiami-Dade DTPWPlanned$25–100m
Metrorail and Metromover stations flooring replacementMiami-Dade DTPWPlanned$25–100m
SMART Plan Aventura StationMiami-Dade DTPWPlanned$25–100m
St Lucie River Bridge RehabilitationStuartPlanned$25–100m
Tri-Rail expansion passenger cars FDOTSFRTA / Tri-RailPlanned$25–100m
BL36 Overhauls Phase 3SFRTA / Tri-RailPlanned$5–25m
Metrorail Metromover substation video control equipmentMiami-Dade DTPWPlanned$5–25m
Metrorail heavy rail truck assembliesMiami-Dade DTPWPlanned$5–25m
Metrorail third rail isolation disconnect switchesMiami-Dade DTPWPlanned$5–25m
Metrorail track guideway work facility buildingMiami-Dade DTPWPlanned$5–25m
Metrorail track inspection vehicle systemMiami-Dade DTPWPlanned$5–25m
Onsite Safety Signal Safety Improvement Phase IISFRTA / Tri-RailPlanned$5–25m
Sunshine Corridor Orlando International Airport South International DriveFDOT RailPlanned$5–25m
Tri-Rail Automated Fare Collection System replacementSFRTA / Tri-RailPlanned$5–25m
U²C Phase 2 Skyway conversion fleetJTAPlanned$5–25mAnnounced 2026
Brightline Tampa extensionBrightline FloridaPlannedno capital cost published
Little River Tri-Rail stationSFRTA / Tri-RailPlanned
Tri-Rail coach and cab carsSFRTA / Tri-RailPlannedno value published for the procurement
State of Florida Automated Transit Vehicle procurementJTACancelledvalue not publishedDate March 2026

Cities

CityNetwork statusNetworks
Miamioperational — Miami-Dade Metrorail (heavy rail) and Metromover (automated people mover), Tri-Rail commuter rail to the Miami Intermodal Center and the Downtown Miami Link into MiamiCentral, and Brightline’s southern terminus at MiamiCentralMiami-Dade Metrorail; Miami-Dade Metromover; Tri-Rail; Tri-Rail Downtown Miami Link; Brightline Florida
Orlandooperational — SunRail commuter rail on the Central Florida Rail Corridor from DeLand to Poinciana, and Brightline’s northern terminus at Orlando International Airport; the Sunshine Corridor from the airport to South International Drive is in project developmentSunRail; Brightline Florida
Jacksonvilleoperational — the Jacksonville Transportation Authority’s 2.5-mile elevated Skyway automated people mover, being converted to an automated-vehicle corridor under the Ultimate Urban Circulator programme; Amtrak serves the city and the Florida East Coast Railway’s 351-mile mainline starts hereJTA Skyway; Amtrak Silver Service
Tampaoperational — the 2.7-mile TECO Line Streetcar between downtown Tampa, the Channel District and Ybor City, operated by HART; the proposed western terminus of Brightline’s Orlando–Tampa extensionTECO Line Streetcar System; Amtrak Silver Star
Cocoaplanned — the Cocoa Multimodal Station and Rail Project, a new passenger station on the Florida East Coast alignment Brightline runs, funded by an approximately $57.5m federal grant announced in August 2026
Stuartplanned — the St Lucie River Bridge Rehabilitation, replacing a 100-year-old rail bridge with a new double-track structure on the Brightline and freight corridor, funded by an approximately $78.9m federal grant announced in August 2026; a Brightline Stuart station remains unfunded

Withheld in the free surface

  • Capex in this region (3)
  • Market narrative

Full detail withheld: 2 fields. In the United States edition · See a fully open example

  • Open today
  • Contracting authority note
  • Value convention
  • Methodology note

Full detail withheld: 4 fields. In the United States edition · See a fully open example

Sources

  • ● Brightline Trains Florida LLC · Brightline Florida Monthly Revenue and Ridership Report, July 2026 (Tampa Extension / Sunshine Corridor, Cocoa and Stuart stations, St. Lucie River Bridge, ridership) (published 2026-08 · checked 2026-09-14)
  • ● Central Florida Commuter Rail Commission · CFCRC 22 January 2026 meeting package (FY25/26 operating budget update; foundational-agreement review schedule; transition workshop) (published 2026-01 · checked 2026-09-14)
  • ● Central Florida Commuter Rail Commission · CFCRC 25 June 2026 complete package (Locally Funded Agreement Supplemental Amendment No. 2, revised contract amount) (published 2026-06 · checked 2026-09-14)
  • ● City of Cocoa · Bid Postings — bid and contract opportunities page (no open bid postings on 14 September 2026); city address and switchboard (published 2026-09 · checked 2026-09-14)
  • ● Florida Department of Transportation · Central Office Letting and Project Information — 2026 letting tables (proposal ID, county, major work type, addenda) (published 2026-09 · checked 2026-09-14)
  • ● Florida Department of Transportation District Four · District Four Letting & Project Information — 2026 letting tables; proposal E4Y08, Miami-Dade, Railroad Construction, advertised for the 10 July 2026 letting, moved to the 31 July 2026 letting, three addenda (published 2026-09 · checked 2026-09-14)
  • ● Florida Department of Transportation · Preliminary 31 July 2026 letting results report, District 04 — four bids on contract E4Y08 (published 2026-07-31 · checked 2026-09-14)
  • ● Florida Department of Transportation · Central Office Design-Build Projects listing (published 2026-09 · checked 2026-09-14)
  • ● Florida Department of Transportation District Four · Bid Solicitation Notice and Approximate Quantities, proposal E4Y08 — Miami River–Miami Intermodal Center Capacity Improvement (proposal budget estimate $78,559,965.00; 1,022 contract days; project 42948725201) (published 2026-06 · checked 2026-09-14)
  • ● Florida Department of Transportation · Procurement Office — “FDOT is a decentralized agency consisting of the Central Office, seven Districts, the Florida Rail Enterprise, and the Florida Turnpike Enterprise” (published 2026 · checked 2026-09-14)
  • ● Florida East Coast Railway · Suppliers — supplier contact and network description (351-mile mainline Jacksonville to Miami) (published 2026 · checked 2026-09-14)
  • ● Greater Orlando Aviation Authority · Airport Business — business opportunities (published 2026 · checked 2026-09-14)
  • ● Greater Orlando Aviation Authority · GOAA Procurement Portal (OpenGov) (published 2026-09 · checked 2026-09-14)
  • ● Hillsborough Transit Authority · HART procurement portal (Bonfire) — open and past opportunities (published 2026-09 · checked 2026-09-14)
  • ● Hillsborough Transit Authority · FY2026 Budget Book (published 2025 · checked 2026-09-14)
  • ● Jacksonville Transportation Authority · P-26-009 State of Florida (SOF) Automated Transit Vehicle (ATV) Procurement — cancelled (published 2026-01-22 · checked 2026-09-14)
  • ● Jacksonville Transportation Authority · Ultimate Urban Circulator (U²C) programme — phases and Local Option Gas Tax dedicated funding (published 2026 · checked 2026-09-14)
  • ● Jacksonville Transportation Authority · UP-25-001 Ultimate Urban Circulator Program Phase II and Phase III Design-Build Services (unsolicited proposal from Balfour Beatty Construction, LLC) (published 2025-08-18 · checked 2026-09-14)
  • ● Miami-Dade County · FY 2026-27 Proposed Budget and Multi-Year Capital Plan, Volume 3 — Transportation and Public Works (capital project pages and Unfunded Capital Programs table) (published 2026 · checked 2026-09-14)
  • ● Miami-Dade County · Advertisement for Bids — South Miami Metrorail Garage Rehabilitation, Project No. IRP145B-DTPW25-CT, Contract No. TP-0000042425 (Contract Base Estimate $12,813,875.00) (published 2026-06 · checked 2026-09-14)
  • ● Miami-Dade County · Metromover Upgrade Project status dashboard (contract amount $152,920,983.22) (published 2023-06 · checked 2026-09-14)
  • ● Miami-Dade County · SMART Plan — North Corridor (published 2026 · checked 2026-09-14)
  • ● Miami-Dade County · SMART Plan — Northeast Corridor (published 2026 · checked 2026-09-14)
  • ● South Florida Regional Transportation Authority · SFRTA Governing Board complete agenda and minutes — August 2026 meeting (published 2026 · checked 2026-09-14)
  • ● South Florida Regional Transportation Authority · SFRTA Governing Board complete agenda and minutes — December 2025 meeting (published 2025 · checked 2026-09-14)
  • ● South Florida Regional Transportation Authority · SFRTA Governing Board complete agenda and minutes — June 2025 meeting (published 2025 · checked 2026-09-14)
  • ● South Florida Regional Transportation Authority · SFRTA Governing Board complete agenda and minutes — March 2026 meeting (published 2026 · checked 2026-09-14)
  • ● South Florida Regional Transportation Authority · SFRTA Procurement Portal hosted by EUNA Procurement (Bonfire) — open opportunities (published 2026-09 · checked 2026-09-14)
  • ● City of Stuart · Bid Postings — bid and contract opportunities page (no open bid postings on 14 September 2026); city address and switchboard (published 2026-09 · checked 2026-09-14)
  • ● Florida Department of Transportation (SunRail) · Doing Business With SunRail — “FDOT is contracting out the operations, maintenance and construction of SunRail to third party vendors” (published 2026 · checked 2026-09-14)
  • ● Florida Department of Transportation (SunRail) · SunRail home page — “The system currently operates over 49 miles with 16 stations through Volusia, Seminole, Orange, and Osceola counties” (page description and schema.org block) (published 2026-02 · checked 2026-09-14)