United States · State
? How to use this page
How to use a region page
- Counts and the pipeline for this region come first; the tabs list its buyers, players and tenders.
- Cities on the map open their own pages.
- Capex, pipeline value and the market narrative open with this market's edition.
Florida
9 buyers · 38 tenders · checked 2026-10-03
Miami-Dade: $4.66bn (North Corridor $4.20bn); Northeast Corridor $927.3m; Tri-Rail $88.19m Siemens locomotives; Jacksonville converting Skyway ($240.08m); Brightline 235-mile.
Everything here is free. One market edition opens in full with one email. Open your free edition
4Metro systems operating
9Buyers tracked
38Tenders tracked
6Cities tracked
- Live pipeline
- $4.2bn SMART North Corridor, $927.3m SMART Northeast Corridor, $370.7m Metromover programme, $240.1m Skyway conversion, $205.1m Tri-Rail rolling stock project, $91.4m Miami River–Miami Intermodal Center low bid, $78.9m St Lucie River bridge and $57.5m Cocoa station grants; 38 tracked procurements, 2 open today
- Technology areas
- Rolling-stock hardware, Signalling & train control, Track & civil, Electrification, Predictive maintenance, Digital operations, AI inspection, Cybersecurity
Key figures
Miami-Dade Metrorail Projects r…$4.658 billion
1 source · primary
- ● Miami-Dade County · FY 2026-27 Proposed Budget and Multi-Year Capital Plan, Volume 3 — Transportation and Public Works (capital project pages and Unfunded Capital Programs table) (published 2026 · checked 2026-09-14)
SMART Plan North Corridor$4.200 billion
2 sources · all primary
- ● Miami-Dade County · FY 2026-27 Proposed Budget and Multi-Year Capital Plan, Volume 3 — Transportation and Public Works (capital project pages and Unfunded Capital Programs table) (published 2026 · checked 2026-09-14)
- ● Miami-Dade County · SMART Plan — North Corridor (published 2026 · checked 2026-09-14)
SMART Plan Northeast Corridor$927.3 million
2 sources · all primary
- ● Miami-Dade County · FY 2026-27 Proposed Budget and Multi-Year Capital Plan, Volume 3 — Transportation and Public Works (capital project pages and Unfunded Capital Programs table) (published 2026 · checked 2026-09-14)
- ● Miami-Dade County · SMART Plan — Northeast Corridor (published 2026 · checked 2026-09-14)
Total project cost of the Tri-R…$205.05 million
1 source · primary
- ● South Florida Regional Transportation Authority · SFRTA Governing Board complete agenda and minutes — December 2025 meeting (published 2025 · checked 2026-09-14)
SunRail total operating costs a…$81.50 million
1 source · primary
- ● Central Florida Commuter Rail Commission · CFCRC 22 January 2026 meeting package (FY25/26 operating budget update; foundational-agreement review schedule; transition workshop) (published 2026-01 · checked 2026-09-14)
Local Option Gas Tax dedicated…$246.84 million
1 source · primary
- ● Jacksonville Transportation Authority · Ultimate Urban Circulator (U²C) programme — phases and Local Option Gas Tax dedicated funding (published 2026 · checked 2026-09-14)
Brightline Florida ridership in…289,388 passengers
1 source · primary
- ● Brightline Trains Florida LLC · Brightline Florida Monthly Revenue and Ridership Report, July 2026 (Tampa Extension / Sunshine Corridor, Cocoa and Stuart stations, St. Lucie River Bridge, ridership) (published 2026-08 · checked 2026-09-14)
Florida’s freight rail network…2,738.31 mainline miles
1 source · primary
- ● Florida Department of Transportation · Florida Rail System Plan 2023, Chapter 2: Florida’s Existing Rail System (2,738.31 mainline miles; 5,324 at-grade crossings at December 2021) (published 2023-10 · checked 2026-09-14)
Low bid on FDOT contract E4Y08$91.36 million
3 sources · all primary
- ● Florida Department of Transportation · Preliminary 31 July 2026 letting results report, District 04 — four bids on contract E4Y08 (published 2026-07-31 · checked 2026-09-14)
- ● Florida Department of Transportation District Four · Bid Solicitation Notice and Approximate Quantities, proposal E4Y08 — Miami River–Miami Intermodal Center Capacity Improvement (proposal budget estimate $78,559,965.00; 1,022 contract days; project 42948725201) (published 2026-06 · checked 2026-09-14)
- ● South Florida Regional Transportation Authority · SFRTA Governing Board complete agenda and minutes — June 2025 meeting (published 2025 · checked 2026-09-14)
Federal station and bridge gran…$136.4 million
1 source · primary
- ● Brightline Trains Florida LLC · Brightline Florida Monthly Revenue and Ridership Report, July 2026 (Tampa Extension / Sunshine Corridor, Cocoa and Stuart stations, St. Lucie River Bridge, ridership) (published 2026-08 · checked 2026-09-14)
SunRail’s own description of th…over 49 miles, 16 stations
1 source · primary
- ● Florida Department of Transportation (SunRail) · SunRail home page — “The system currently operates over 49 miles with 16 stations through Volusia, Seminole, Orange, and Osceola counties” (page description and schema.org block) (published 2026-02 · checked 2026-09-14)
Buyers
| Buyer | Type | Tenders | Contracts awarded |
|---|---|---|---|
| Miami-Dade County Department of Transportation and Public Works | Transit authority | 17 | 1 |
| South Florida Regional Transportation Authority | Transit authority | 10 | 4 |
| Florida Department of Transportation — Freight and Rail Office and Florida Rail Enterprise | State DOT | 4 | 4 |
| Jacksonville Transportation Authority | Transit authority | 4 | 0 |
| Brightline Trains Florida LLC | PPP concessionaire | 1 | 0 |
| City of Cocoa | Other | 1 | 0 |
| City of Stuart | Other | 1 | 0 |
| Central Florida Commuter Rail Commission | Transit authority | 0 | 0 |
| Hillsborough Transit Authority | Transit authority | 0 | 0 |
Tenders
Cities
| City | Network status | Networks |
|---|---|---|
| Miami | operational — Miami-Dade Metrorail (heavy rail) and Metromover (automated people mover), Tri-Rail commuter rail to the Miami Intermodal Center and the Downtown Miami Link into MiamiCentral, and Brightline’s southern terminus at MiamiCentral | Miami-Dade Metrorail; Miami-Dade Metromover; Tri-Rail; Tri-Rail Downtown Miami Link; Brightline Florida |
| Orlando | operational — SunRail commuter rail on the Central Florida Rail Corridor from DeLand to Poinciana, and Brightline’s northern terminus at Orlando International Airport; the Sunshine Corridor from the airport to South International Drive is in project development | SunRail; Brightline Florida |
| Jacksonville | operational — the Jacksonville Transportation Authority’s 2.5-mile elevated Skyway automated people mover, being converted to an automated-vehicle corridor under the Ultimate Urban Circulator programme; Amtrak serves the city and the Florida East Coast Railway’s 351-mile mainline starts here | JTA Skyway; Amtrak Silver Service |
| Tampa | operational — the 2.7-mile TECO Line Streetcar between downtown Tampa, the Channel District and Ybor City, operated by HART; the proposed western terminus of Brightline’s Orlando–Tampa extension | TECO Line Streetcar System; Amtrak Silver Star |
| Cocoa | planned — the Cocoa Multimodal Station and Rail Project, a new passenger station on the Florida East Coast alignment Brightline runs, funded by an approximately $57.5m federal grant announced in August 2026 | |
| Stuart | planned — the St Lucie River Bridge Rehabilitation, replacing a 100-year-old rail bridge with a new double-track structure on the Brightline and freight corridor, funded by an approximately $78.9m federal grant announced in August 2026; a Brightline Stuart station remains unfunded |
Withheld in the free surface
- Capex in this region (3)
- Market narrative
Full detail withheld: 2 fields. In the United States edition · See a fully open example
- Open today
- Contracting authority note
- Value convention
- Methodology note
Full detail withheld: 4 fields. In the United States edition · See a fully open example
Sources
- ● Brightline Trains Florida LLC · Brightline Florida Monthly Revenue and Ridership Report, July 2026 (Tampa Extension / Sunshine Corridor, Cocoa and Stuart stations, St. Lucie River Bridge, ridership) (published 2026-08 · checked 2026-09-14)
- ● Central Florida Commuter Rail Commission · CFCRC 22 January 2026 meeting package (FY25/26 operating budget update; foundational-agreement review schedule; transition workshop) (published 2026-01 · checked 2026-09-14)
- ● Central Florida Commuter Rail Commission · CFCRC 25 June 2026 complete package (Locally Funded Agreement Supplemental Amendment No. 2, revised contract amount) (published 2026-06 · checked 2026-09-14)
- ● City of Cocoa · Bid Postings — bid and contract opportunities page (no open bid postings on 14 September 2026); city address and switchboard (published 2026-09 · checked 2026-09-14)
- ● Florida Department of Transportation · Central Office Letting and Project Information — 2026 letting tables (proposal ID, county, major work type, addenda) (published 2026-09 · checked 2026-09-14)
- ● Florida Department of Transportation District Four · District Four Letting & Project Information — 2026 letting tables; proposal E4Y08, Miami-Dade, Railroad Construction, advertised for the 10 July 2026 letting, moved to the 31 July 2026 letting, three addenda (published 2026-09 · checked 2026-09-14)
- ● Florida Department of Transportation · Preliminary 31 July 2026 letting results report, District 04 — four bids on contract E4Y08 (published 2026-07-31 · checked 2026-09-14)
- ● Florida Department of Transportation · Central Office Design-Build Projects listing (published 2026-09 · checked 2026-09-14)
- ● Florida Department of Transportation District Four · Bid Solicitation Notice and Approximate Quantities, proposal E4Y08 — Miami River–Miami Intermodal Center Capacity Improvement (proposal budget estimate $78,559,965.00; 1,022 contract days; project 42948725201) (published 2026-06 · checked 2026-09-14)
- ● Florida Department of Transportation · Procurement Office — “FDOT is a decentralized agency consisting of the Central Office, seven Districts, the Florida Rail Enterprise, and the Florida Turnpike Enterprise” (published 2026 · checked 2026-09-14)
- ● Florida East Coast Railway · Suppliers — supplier contact and network description (351-mile mainline Jacksonville to Miami) (published 2026 · checked 2026-09-14)
- ● Greater Orlando Aviation Authority · Airport Business — business opportunities (published 2026 · checked 2026-09-14)
- ● Greater Orlando Aviation Authority · GOAA Procurement Portal (OpenGov) (published 2026-09 · checked 2026-09-14)
- ● Hillsborough Transit Authority · HART procurement portal (Bonfire) — open and past opportunities (published 2026-09 · checked 2026-09-14)
- ● Hillsborough Transit Authority · FY2026 Budget Book (published 2025 · checked 2026-09-14)
- ● Jacksonville Transportation Authority · P-26-009 State of Florida (SOF) Automated Transit Vehicle (ATV) Procurement — cancelled (published 2026-01-22 · checked 2026-09-14)
- ● Jacksonville Transportation Authority · Ultimate Urban Circulator (U²C) programme — phases and Local Option Gas Tax dedicated funding (published 2026 · checked 2026-09-14)
- ● Jacksonville Transportation Authority · UP-25-001 Ultimate Urban Circulator Program Phase II and Phase III Design-Build Services (unsolicited proposal from Balfour Beatty Construction, LLC) (published 2025-08-18 · checked 2026-09-14)
- ● Miami-Dade County · FY 2026-27 Proposed Budget and Multi-Year Capital Plan, Volume 3 — Transportation and Public Works (capital project pages and Unfunded Capital Programs table) (published 2026 · checked 2026-09-14)
- ● Miami-Dade County · Advertisement for Bids — South Miami Metrorail Garage Rehabilitation, Project No. IRP145B-DTPW25-CT, Contract No. TP-0000042425 (Contract Base Estimate $12,813,875.00) (published 2026-06 · checked 2026-09-14)
- ● Miami-Dade County · Metromover Upgrade Project status dashboard (contract amount $152,920,983.22) (published 2023-06 · checked 2026-09-14)
- ● Miami-Dade County · SMART Plan — North Corridor (published 2026 · checked 2026-09-14)
- ● Miami-Dade County · SMART Plan — Northeast Corridor (published 2026 · checked 2026-09-14)
- ● South Florida Regional Transportation Authority · SFRTA Governing Board complete agenda and minutes — August 2026 meeting (published 2026 · checked 2026-09-14)
- ● South Florida Regional Transportation Authority · SFRTA Governing Board complete agenda and minutes — December 2025 meeting (published 2025 · checked 2026-09-14)
- ● South Florida Regional Transportation Authority · SFRTA Governing Board complete agenda and minutes — June 2025 meeting (published 2025 · checked 2026-09-14)
- ● South Florida Regional Transportation Authority · SFRTA Governing Board complete agenda and minutes — March 2026 meeting (published 2026 · checked 2026-09-14)
- ● South Florida Regional Transportation Authority · SFRTA Procurement Portal hosted by EUNA Procurement (Bonfire) — open opportunities (published 2026-09 · checked 2026-09-14)
- ● City of Stuart · Bid Postings — bid and contract opportunities page (no open bid postings on 14 September 2026); city address and switchboard (published 2026-09 · checked 2026-09-14)
- ● Florida Department of Transportation (SunRail) · Doing Business With SunRail — “FDOT is contracting out the operations, maintenance and construction of SunRail to third party vendors” (published 2026 · checked 2026-09-14)
- ● Florida Department of Transportation (SunRail) · SunRail home page — “The system currently operates over 49 miles with 16 stations through Volusia, Seminole, Orange, and Osceola counties” (page description and schema.org block) (published 2026-02 · checked 2026-09-14)
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.