Los Angeles County Metropolitan Transportation Authority

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Type
Transit authority — county transportation authority; rail, bus, highways
Market · Region
United States · California
Open tenders
0
Technology areas
Track & civil, Rolling-stock hardware, Signalling & train control, Digital operations

Builds and operates Los Angeles rail network including East San Fernando Valley LRT under construction.

About this buyer

Read more

Builds and operates Los Angeles' rail network — East San Fernando Valley LRT under construction ($1.9bn main contract, 2026–31), Sepulveda corridor in development.

Type
Transit authority — county transportation authority; rail, bus, highways
Where
California · Los Angeles
Programmes
FTA Capital Investment Grants
Technology areas
Track & civil, Rolling-stock hardware, Signalling & train control, Digital operations

Who holds what here

  • awarded Stacy Witbeck — LA Metro East San Fernando Valley Light Rail — Stacy and Witbeck, Inc. (active · since 2026-08)
  • awarded Skanska — East San Fernando Valley LRT — Skanska/Stacy and Witbeck JV (total, construction July 2026–December 2031) (active · since 2026-07)
  • awarded Stacy Witbeck — East San Fernando Valley LRT — Skanska–Stacy and Witbeck JV (active · since 2026-07)
  • awarded Hill — LA Metro K Line Extension Torrance Hill — Hill International, Inc. (active · since 2026-03)
  • awarded Herzog — Southeast Gateway Line Advanced Works CM/GC Phase 1 — awarded to Flatiron-Herzog, a SGL Joint Venture, of which Herzog is one of the two partners (Contract PS119518000, 27 February 2025) (active · since 2025-02-27)
  • awarded Tutor Perini — Purple Line Extension Sections 2 and 3 tunnels/stations (active)
  • awarded Arcadis — Construction management support, East San Fernando Valley LRT (with Mott MacDonald) (active)
  • awarded Parsons — A Line Claremont extension design (active)
Sources for these relationships (14)
  • ● Arcadis · East San Fernando Valley Light Rail — construction management with Mott MacDonald (published 2023-01 · checked 2026-09-06)
  • ● Los Angeles County Metropolitan Transportation Authority · Board matter 2026-0266, Attachment A — Funding and Expenditure Plan: total uses $3,998.675m against the proposed life-of-project budget (published 2026-04 · checked 2026-09-13)
  • ● Los Angeles County Metropolitan Transportation Authority — Legistar legislative record · Board matter 2026-0266: establish a life-of-project budget of $3,998,675,309 for the East San Fernando Valley Light Rail Transit Project and amend Progressive Design-Build Contract No. PS89616000 with San Fernando Transit Constructors (SFTC) by $1,988,038,124, increasing the total contract value from $442,916,240 to $2,430,954,364. Approved by the Board of Directors 28 May 2026. Also published at metro.legistar.com (file 2026-0266). (published 2026-04-02 · checked 2026-09-13)
  • ● Los Angeles County Metropolitan Transportation Authority — Legistar legislative record · Board matter 2025-1032: award cost-plus fixed fee Contract No. AE130368000, five years with two three-year options, to Hill International, Inc. for Program Management Support Services for the K Line Extension to Torrance Project, not to exceed $89,198,548 for the base term. Approved on the Board of Directors’ consent calendar 26 March 2026. (published 2025-11-24 · checked 2026-09-13)
  • ● Los Angeles County Metropolitan Transportation Authority — Legistar legislative record · Board matter 2026-0037: board motion approving the "Hawthorne Option", a 4.5-mile light rail line with two stations from the existing Redondo Beach (Marine) station along Hawthorne Boulevard to the Torrance Transit Center, as the project, and certifying the Final EIR. (published 2026-01-16 · checked 2026-09-13)
  • ● Los Angeles County Metropolitan Transportation Authority — Legistar legislative record · Board matter 2025-0007: award Contract No. PS119518000 to Flatiron-Herzog, a SGL Joint Venture, for the Southeast Gateway Line Advanced Works Construction Manager/General Contractor (CM/GC) Phase 1, $10,543,240 for preconstruction services, and establish a preconstruction budget for the project of $997,750,195. Approved on the Board of Directors’ consent calendar 27 February 2025. (published 2025-01-07 · checked 2026-09-13)
  • ● Los Angeles County Metropolitan Transportation Authority — Legistar legislative record · Board matter 2025-1034: execute Modification No. 13 to Contract No. AE63445000 with STV Incorporated, $43,096,451, advancing design on the K Line Extension to Torrance Project from 15% advanced conceptual engineering to 30% preliminary engineering and increasing the total contract value from $33,404,805 to $76,501,256. (published 2025-11-25 · checked 2026-09-13)
  • ○ Railway-News · Los Angeles: Skanska and Stacy Witbeck sign contract for Van Nuys light rail (published 2026-08-20 · checked 2026-09-12)
  • ○ Metro Rail Today · Skanska–Stacy Witbeck JV awarded $1.9 billion new light rail contract from Los Angeles Metro (published 2026-09-01 · checked 2026-09-05)
  • ● Parsons · Rail and transit (450+ projects; BART CBTC US$45m; Metrolink US$50m task order) (checked 2026-09-06)
  • ● Skanska USA · Skanska JV awarded $2.43B contract for East San Fernando Valley LRT (published 2026-08 · checked 2026-09-06)
  • ● Stacy Witbeck · About us (Alameda, CA; 650+ miles of track; ENR #6 mass transit and rail 2024) (checked 2026-09-06)
  • ● Tutor Perini · Purple Line Extension, Section 2 (checked 2026-09-06)
  • ● Tutor Perini · Purple Line Extension, Section 3 tunnels (checked 2026-09-06)

Tenders

TenderStatusValue bandNext key date
LA Metro A and E Line Interlock RailWorksBids closed$25–100m
LA Metro East San Fernando Valley Light RailAwardedover $1bnAwarded September 2026
LA Metro K Line Extension Torrance HillAwarded$25–100mAwarded March 2026
LA Metro Southeast Gateway Line preconstructionIn executionover $1bnAwarded February 2025
LA Metro D Line Extension Section 1In executionvalue not published for the programme total
LA Metro Sepulveda driverless heavy railPlannedover $1bn
LA Metro C Line traction power substationsPlanned$100–500m
LA Metro Doran Street grade separationPlanned$100–500m

Withheld in the free surface

  • Procurement structure
  • Award history (1)
  • Entry path
  • Portals (1)
  • Published contacts (1)

Full detail withheld: 5 fields. In the United States edition · See a fully open example

9 sources · 4 primary
  • ● Los Angeles County Metropolitan Transportation Authority · Doing business with Metro (published 2026 · checked 2026-09-05)
  • ○ Metro Rail Today · Skanska–Stacy Witbeck JV awarded $1.9 billion new light rail contract from Los Angeles Metro (published 2026-09-01 · checked 2026-09-05)
  • ● Los Angeles County Metropolitan Transportation Authority · Metro vendor portal (current and future business opportunities) (published 2026 · checked 2026-09-13)
  • ○ Railway-News · Los Angeles: Skanska and Stacy Witbeck sign contract for Van Nuys light rail (published 2026-08-20 · checked 2026-09-12)
  • ○ Railway-News · Underground rail option approved for LA Metro's Sepulveda Pass (published 2026-01-26 · checked 2026-09-12)
  • ○ Metro Magazine · LA Metro opens D Line extension (published 2026-05-10 · checked 2026-09-12)
  • ○ Engineering News-Record · LA Metro advances $25B Sepulveda Pass subway project (published 2026-01-28 · checked 2026-09-12)
  • ● Los Angeles County Metropolitan Transportation Authority · Metro vendor portal — Open Solicitations list. The table publishes Number, Title, Type, NAICS code, Due Date, Issue Date and Status only; there is no value, budget or engineer’s-estimate column. (published 2026 · checked 2026-09-13)
  • ● Los Angeles County Metropolitan Transportation Authority · IFB No. OP138405, Metro C/K Line Mainline Fastener Replacement — Question and Answer No. 1 (17 August 2026), item 4, question of 14 August 2026: "Please provide the engineers estimate of the project" / answer: "Unable to provide." The answer is carried unchanged in Question and Answer No. 2 (27 August 2026) and No. 3 (1 September 2026). Documents distributed inside the solicitation package archive. (published 2026-08-17 · checked 2026-09-13)