India · State
? How to use this page

How to use a region page

  1. Counts and the pipeline for this region come first; the tabs list its buyers, players and tenders.
  2. Cities on the map open their own pages.
  3. Capex, pipeline value and the market narrative open with this market's edition.

Tamil Nadu

5 buyers · 9 tenders · checked 2026-10-03

Country's richest metro pipeline: Chennai Phase 2 ($7.35B); home to ICF, world's largest rail coach factory; Western suppliers embedded.

Everything here is free. One market edition opens in full with one email. Open your free edition

1Metro systems operating
1Rolling-stock factories
5Buyers tracked
9Tenders tracked
Live pipeline
$6.98B+ (₹60,000 cr+) programme (Phase 2) incl. tracked awards
Technology areas
Signalling & train control, Rolling-stock hardware, Digital operations, Predictive maintenance, AI inspection, Cybersecurity, Track & civil, Electrification

Key figures

Chennai Metro Phase 1≈54.1 km, 2 lines, 41 stationsChennai Metro Phase 1
1 source · primary
  • ● CMRL (official) · Project status (published 2026 · checked 2026-06-22)
Chennai Metro ridership11.19 crore passengers in 2025 (record); ≈2.95 lakh/day (H1 2025)Chennai Metro ridership
2 sources · 1 primary
  • ○ DTNext · Chennai Metro 11.19 cr ridership 2025 (published 2026-01 · checked 2026-06-22)
  • ● CMRL (official live data) · Passenger flow (published 2026 · checked 2026-06-22)

Buyers

Tenders

TenderBuyerStatusValue bandNext key date
12-year O&M Phase 2 116 kmCMRLAwarded$640–698M (₹5,500–6,000 cr)
12 underground stations Kilpauk–Taramani JICA-fundedCMRLAwarded$465–523M (₹4,000–4,500 cr)Awarded June 2023
ARE04A 96 driverless UTO trains Phase 2CMRLAwarded$174–233M (₹1,500–2,000 cr)
ASA04 CBTC GoA4 signalling Corridor 3CMRLAwarded$174–233M (₹1,500–2,000 cr)Awarded December 2022
17 entry/exit structures Corridor 3CMRLAwarded$29.1–34.9M (₹250–300 cr)Awarded October 2025
E&M systems Corridor 3CMRLAwarded$5.81–11.6M (₹50–100 cr)Awarded March 2026
AFC swing gates C3 C5 Phase 1 retrofitCMRLAwardedvalue not published
ISA-01 Independent Safety Assessment Phase 1CMRLAwardedlt_5mAwarded December 2011
KAVACH 4.0 Chennai Beach–Tambaram–Chengalpattu 60 kmSR (Chennai)Planned$17.4–23.3M (₹150–200 cr)

Cities

CityNetwork statusNetworks
Chennaioperational + major Phase 2 constructionChennai Metro (Blue + Green; Phase 2 under construction); Chennai MRTS / Suburban
Coimbatoremetro DPR rejected (Nov 2025)
Maduraimetro DPR rejected (Nov 2025)

Players with a footprint here

PlayerKindFootprint
L&TCivil contractorHeadquarters
AlstomRolling-stock OEMPlant
AECOMEngineering consultantProject presence
Nippon KoeiEngineering consultantProject presence
Hitachi RailSignalling & systemsOffice
KernexSignalling & systemsHeadquarters
ST EngineeringTechnology vendorProject presence
ADBFunder / investorOffice
AIIBFunder / investorOffice
JICAFunder / investorOffice

What changed

From This Week in Rail, newest first.

  • 2026-08-31 — CMRL tenders electrical, fire alarm and detection, fire-fighting, VAC and BMS works (C3-E&M-07A) for nine elevated stations from Sholinganallur Lake to SIPCOT 2, including stabling lines
  • 2026-08-17 — CMRL tenders a feasibility-cum-project report for water metro transport along the Buckingham Canal, Ennore to Mahabalipuram Chennai testing the Kochi model — if the DPR holds, a new modality and a new equipment market open in Tamil Nadu.
  • 2026-08-17 — CMRL awards the DPR for multi-modal integration within 500 m of all 41 Phase-I stations
  • 2026-08-10 — CMRL tenders a high-rise commercial development above Arumbakkam Metro station, with four-tier mechanical parking Transit-oriented development is becoming a standing revenue line for CMRL — property packages now travel alongside rail ones.
  • 2026-08-03 — CMRL tenders a consultancy for ISO 9001 / 14001 recertification of its O&M departments

Withheld in the free surface

  • Market narrative
  • Indian Railways allocation (4)

Full detail withheld: 2 fields. In the India edition · See a fully open example

  • Cmrl p2 (3)
  • Icf output (4)
  • Mrts (3)
  • Sr chennai division (4)

Full detail withheld: 4 fields. In the India edition · See a fully open example

Browse: the Atlas · India · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.