Buyer · Rolling-stock OEM
? How to use this page

How to use a buyer page

  1. Who this buyer is, then who already holds positions here and what it is tendering.
  2. Click Watch and every change lands in your weekly digest.
  3. How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.

Integral Coach Factory

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the India edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Type
Rolling-stock OEM — IR production unit, Chennai
Market · Region
India · Tamil Nadu
Open tenders
0
Technology areas
Rolling-stock hardware, AI inspection, Predictive maintenance, Digital operations

World's largest rail coach factory; designs and builds LHB, EMU/MEMU and Vande Bharat (Chair Car + Sleeper) coaches.

About this buyer

Read more

World's largest rail coach factory; designs and builds LHB, EMU/MEMU and Vande Bharat (Chair Car + Sleeper) coaches.

Type
Rolling-stock OEM — IR production unit, Chennai
Where
Tamil Nadu · Chennai
Technology areas
Rolling-stock hardware, AI inspection, Predictive maintenance, Digital operations

Who holds what here

  • awarded BEML — Repeat order for Vande Bharat Sleeper trainset manufacture and supply (active · since 2026-09)
  • awarded Kernex — On-board KAVACH system works (incl. GST, July 2026) (active · since 2026-07)
  • awarded by K-RIDE — 306 AC coaches — 153 in the first tranche of a programme (active)
Sources for these relationships (6)
  • ○ Angel One · Kernex bags ₹100.53 crore on-board KAVACH order from ICF (published 2026-07 · checked 2026-09-06)
  • ● Business Standard (RVNL filing) · RVNL–Rithwik JV $64.4M (₹554 cr) LoA (BSRP C4A) (published 2025-02 · checked 2026-06-22)
  • ● K-RIDE (official) · Bengaluru Suburban Rail Project (published 2026 · checked 2026-06-22)
  • ○ Siasat · K-RIDE $176M (₹1,513 cr) coach contract with ICF (published 2026 · checked 2026-06-22)
  • ○ The Metro Rail Guy · L&T wins BSRP Kanaka (C4) civil (published 2023-12 · checked 2026-06-22)
  • ○ Trade Brains · BEML bags ₹180.60 crore repeat order from ICF for Vande Bharat Sleeper trains (SEBI Reg. 30 disclosure) (published 2026-09-02 · checked 2026-09-12)

Withheld in the free surface

  • Procurement structure
  • Award history (1)
  • Entry path
  • Portals (1)

Full detail withheld: 4 fields. In the India edition · See a fully open example

2 sources · all secondary
  • ○ DD News · ICF record coach production FY2024-25 (published 2025 · checked 2026-06-22)
  • ○ Wikipedia (cross-checked) · Integral Coach Factory (published 2026 · checked 2026-06-22)

Browse: the Atlas · India · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.