7 buyers · 58 tenders · checked 2026-10-03

Four procurement doors; MetroLink civils, service, enabling contracts EUR 7.9bn/7.3bn/1.2bn estimates; Iarnród Éireann DART+ frameworks closed without award; only 50 km of 2,200 km electrified.

Everything here is free. One market edition opens in full with one email. Open your free edition

0Metro systems operating
1Light rail systems operational
7Buyers tracked
58Tenders tracked
Live pipeline
Over EUR 20bn of valued procurements tracked, dominated by MetroLink (M401/M402 civils EUR 7.912bn, the M500 25-year design-build-finance-operate-maintain contract EUR 7.3bn, the M120 heavy civils framework EUR 1.2bn) and the DART+ Programme (EUR 2.2bn indicative, with framework estimates of EUR 650m for civils, EUR 550m for electrification and EUR 325m for signalling); one tender above the EUR 5m floor was still open for bids on 13 September 2026
Technology areas
Signalling & train control, Track & civil, Electrification, Rolling-stock hardware, Predictive maintenance, Digital operations, AI inspection, Cybersecurity

Key figures

Iarnród Éireann's Network State…1,178 km single · 886 km double · 60 km multiple trackIarnród Éireann's Network Statement 2026 summarises the mainline as 1,178 km single track, 886 km double and 60 km multiple; nominal installed plain-line gauge is 1,602 mm where rails are inclined at 1 in 40 on concrete and 1,600 mm where they are inclined at 1 in 20 or vertical, with 1,600 mm for new points and crossings, and the maximum permissible axle load is 18.8 tonnes. Iarnród Éireann's own infrastructure page states it manages the safety of 2,200 km of railway; its infrastructure department publishes 2,400 km of track, 5,100-plus bridges, 1,240 level crossings, 147 open stations, 372 platforms and 14 tunnels, while the Commission for Railway Regulation publishes approximately 2,400 km of operational track, about 4,440 bridges, about 1,100 point ends, about 970 level crossings, 144 stations, 3,300-plus cuttings and embankments, 372 platforms and 13 tunnels.
4 sources · all primary
  • ● Iarnród Éireann · Network Statement 2026 (§3.3.1.1 extent of single, double and multiple track; §3.3.1.2 track gauge; §3.3.2.2 weight limits; §3.3.2.6 power supply) (published 2025-12-01 · checked 2026-09-13)
  • ● Iarnród Éireann · Iarnród Éireann Infrastructure (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · Infrastructure Contact Details (asset counts and the three Infrastructure Manager's Offices) (published 2026 · checked 2026-09-13)
  • ● Commission for Railway Regulation · Areas we regulate (published 2026 · checked 2026-09-13)
The DART is Iarnród Éireann's o…about 50 km at 1,500 V DC, rising to over 150 kmThe DART is Iarnród Éireann's only electrified line. Its Network Statement 2026 records that the Dublin suburban system in the area bounded by Malahide, Howth and Greystones is electrified at 1,500 V DC by overhead contact line, with one or both running rails as the return, contact wire height between 4,200 mm and 5,600 mm and a maximum stagger of 400 mm. The DART+ Programme grows the electrified network from its current 50 km to over 150 km, with DART+ Coastal North alone extending the wire about 37 km from Malahide to Drogheda MacBride; Iarnród Éireann describes DART+ as trebling electrification of the Greater Dublin Area network. No published figure gives the electrified share of the whole network.
5 sources · all primary
  • ● Iarnród Éireann · Network Statement 2026 (§3.3.1.1 extent of single, double and multiple track; §3.3.1.2 track gauge; §3.3.2.2 weight limits; §3.3.2.6 power supply) (published 2025-12-01 · checked 2026-09-13)
  • ● Iarnród Éireann · DART+ Programme — home and news (published 2026-09 · checked 2026-09-13)
  • ● Iarnród Éireann · About the DART+ Programme (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · DART+ Coastal North (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · Investment in New Trains (published 2026 · checked 2026-09-13)
DART+ Programme: four infrastru…EUR 2bn programme · EUR 2.2bn on the indicative noticeDART+ Programme: four infrastructure projects (West, South West, Coastal North, Coastal South) plus fleet and a depot, described by Iarnród Éireann as a EUR 2 billion investment under Project Ireland 2040 that doubles capacity and trebles electrification in the Greater Dublin Area; the periodic indicative notice of 20 December 2024 carries EUR 2,200,000,000
3 sources · all primary
  • ● Iarnród Éireann · About the DART+ Programme (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · Investment in New Trains (published 2026 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Iarnród Éireann — Periodic Indicative Notice relating to DART+ Programme Procurements (published 2024-12-20 · checked 2026-09-13)
MetroLinkEUR 9.5bn · 18.8 km · 16 stationsMetroLink, Swords to Charlemont, driverless, much of it bored; both the global prior information notice of 8 July 2025 and the M500 prior information notice of 7 October 2025 carry EUR 9,500,000,000. Government approval in principle July 2022; procurement of the M401/M402 civils began 3 February 2026 and of the M500 25-year design-build-finance-operate-maintain contract on 4 May 2026
5 sources · all primary
Luas light rail43 km · 81 trams · 55 million journeys in 2025Luas light rail, owned by Transport Infrastructure Ireland: Red Line 21 km with 32 stops, Green Line 22 km with 35 stops, 81 trams, seven Park & Ride sites, opened 2004, on TII's own Luas page, which publishes no depot count; the three maintenance depots and the 67-stop total come from the TII400 contract notice. Operations and maintenance awarded to Keolis (UK) Limited on 12 March 2026 at EUR 718,979,302
2 sources · all primary
All-Island Strategic Rail Review32 recommendations · EUR 35bn-37bn to 2050All-Island Strategic Rail Review, published 31 July 2024 by the Department of Transport and Northern Ireland's Department for Infrastructure: 32 recommendations to 2050 taking the island's route length from about 2,300 km to almost 3,000 km, 200 km/h intercity trains, at least hourly intercity services, net-zero through overhead electrification, 700,000 more people within 5 km of a station and annual passengers from about 65 million to over 180 million, at a capital cost of EUR 35bn-EUR 37bn (GBP 29bn-GBP 31bn) in 2023 prices
2 sources · all primary
Shared Island Fund allocation o…EUR 228m for all-island rail, June 2026Shared Island Fund allocation of 23 June 2026 with delivery targeted by 2030: EUR 100 million for track renewals in Northern Ireland on the Derry-Belfast and Belfast-Dublin lines (recorded in the Atlas's Northern Ireland file), EUR 93 million to accelerate DART+ Coastal North infrastructure in Ireland, and EUR 35 million to continue the hourly Enterprise service to 2030, matched by the Department of Transport; Enterprise passenger numbers rose about 40 per cent after the hourly service began in October 2024
1 source · primary
DART+ Fleet: an Alstom framewor…up to 750 vehicles · 285 carriages orderedDART+ Fleet: an Alstom framework awarded December 2021 with provision for up to 750 electric and battery-electric vehicles over ten years; three orders totalling 285 carriages in 57 five-carriage trains, about EUR 670 million of Government investment, first units in testing for service in 2027 and the third order of 100 carriages at EUR 173.9 million replacing the 1984 DART fleet
2 sources · all primary

Buyers

BuyerTypeTendersContracts awarded
Iarnród Éireann — Irish RailInfrastructure manager4223
Transport Infrastructure IrelandState DOT144
National Transport AuthorityTransit authority22
An Coimisiún PleanálaOther00
Commission for Railway RegulationRegulator / standards00
Córas Iompair ÉireannNational operator00
Department of Transport (Ireland)National rail HQ00

Tenders

TenderBuyerStatusValue bandNext key date
Luas low-voltage electrical renewals worksTIIOpen$25–100mCloses October 2026
MetroLink M120 Dublin Airport station heavy civilsTIIBids closedover $1bnBids closed July 2026 · award expected
MetroLink M401 M402 design build civilTIIBids closedover $1bnBids closed March 2026 · award expected
MetroLink M500 service delivery partner 25 yearsTIIBids closedover $1bnBids closed July 2026 · award expected
DART+ civil structural works design buildIarnród ÉireannBids closed$500m–1bnBids closed October 2025 · award expected
DART+ electrification works design build frameworkIarnród ÉireannBids closed$500m–1bnBids closed September 2025 · no award published
MetroLink M14 utilities enabling works frameworkTIIBids closed$500m–1bnBids closed May 2026 · award expected
DART+ Spencer Dock station Dublin design buildIarnród ÉireannBids closed$100–500mBids closed October 2025 · award expected
DART+ signalling telecoms design build frameworkIarnród ÉireannBids closed$100–500mBids closed December 2025 · award expected
DART+ MetroLink Glasnevin enabling worksIarnród ÉireannBids closed$100–500mBids closed August 2026 · award expected
Labour services framework four trade lotsIarnród ÉireannBids closed$100–500mBids closed September 2026 · award expected
New light rail vehicles procurement supplies servicesTIIBids closed$100–500mBids closed September 2024 · no award published
High voltage traction power renewals worksIarnród ÉireannBids closed$25–100mBids closed March 2025 · no award published
MetroLink M160 environmental monitoring servicesTIIBids closed$25–100mBids closed July 2026 · award expected
Sales distribution platform revenue managementIarnród ÉireannBids closed$25–100mBids closed May 2026 · award expected
Field cable train protection systemIarnród ÉireannBids closed$5–25mBids closed September 2025 · no award published
MetroLink M190 specialist heritage contractTIIBids closed$5–25mBids closed July 2026 · award expected
Remote sensor monitoring equipment eleven asset-class lotsIarnród ÉireannBids closed$5–25mBids closed December 2025 · award expected
Belden OTN XTRAN MPLS-TP optical transport equipmentIarnród ÉireannBids closed$5–25mBids closed January 2026 · award expected
Fasteners supply three lots safety-critical bespokeIarnród ÉireannBids closed$5–25mBids closed May 2026 · award expected
Wicklow Station battery-electric multiple unit chargingIarnród ÉireannBids closed$5–25mBids closed April 2026 · award expected
MetroLink Programme Delivery Partner support servicesTIIAwarded$500m–1bnPublished November 2025
Multi-disciplinary consultants PMP phases 1-5 frameworkIarnród ÉireannAwarded$500m–1bnAwarded August 2026
TII400 Luas operations maintenance seven yearsTIIAwarded$500m–1bnAwarded March 2026
Plant hire services framework agreementIarnród ÉireannAwarded$100–500mAwarded July 2026
Washed railway ballast supply delivery frameworkIarnród ÉireannAwarded$100–500mAwarded July 2026
GSM-R Phase 4 civils works package 2Iarnród ÉireannAwarded$100–500mAwarded October 2025
Galway Line Portarlington multi-disciplinary consultantIarnród ÉireannAwarded$100–500mAwarded April 2025
Computer based interlocking system supply supportIarnród ÉireannAwarded$100–500mAwarded April 2025
On-track machine fleet permanent way operationIarnród ÉireannAwarded$100–500mAwarded July 2026
Level crossing CCTV camera poles nationalIarnród ÉireannAwarded$100–500mAwarded November 2024
Luas overhead contact system works frameworkTIIAwarded$100–500mAwarded July 2026
DART+ multi-disciplinary consultancy IÉ PMP 5-7Iarnród ÉireannAwarded$25–100mAwarded May 2026
Foynes line fibre services Limerick FoynesIarnród ÉireannAwarded$25–100mAwarded December 2025
Independent safety assessor notified designated bodyIarnród ÉireannAwarded$25–100mAwarded August 2026
38 kV traction substation equipment maintenanceIarnród ÉireannAwarded$25–100mAwarded November 2025
Navan rail line multi-disciplinary consultancyIarnród ÉireannAwarded$25–100mAwarded November 2024
Overhead line equipment maintenance repair renewalIarnród ÉireannAwarded$25–100mAwarded October 2024
Rail welding repair and track inspection servicesIarnród ÉireannAwarded$25–100mAwarded December 2023
Rope access inspection Irish Rail bridgesIarnród ÉireannAwarded$25–100mAwarded July 2025
Rail supply CEN54E1 CEN60E1 UIC33C1Iarnród ÉireannAwarded$25–100mAwarded March 2024
Telecommunications batteries rechargeable 12 V DC VRLAIarnród ÉireannAwarded$25–100mAwarded June 2025
Luas track and associated works renewalsTIIAwarded$25–100mAwarded May 2025
Luas operations maintenance Transdev Covid-era modificationsNTAAwarded$5–25mPublished August 2024
Cork Area Commuter Rail multi-disciplinary consultantIarnród ÉireannAwarded$5–25mAwarded May 2024
Technical advisory services transport projectsNTAAwarded$5–25mAwarded June 2026
Ultrasonic rail testing operativesIarnród ÉireannAwarded$5–25mAwarded October 2024
Long line public address system supplyIarnród ÉireannAwarded$5–25mAwarded November 2025
OBE53 waterproofing stitching masonry Granagh BegIarnród ÉireannAwardedvalue not reliable on the noticeAwarded September 2025
Siemens Mobility signalling train control systemIarnród ÉireannAwardedvalue not publishedAwarded June 2026
DART+ Fleet Alstom 750 electric battery-electric vehiclesIarnród ÉireannIn execution$500m–1bn
Glounthaune Midleton twin track Cork AreaIarnród ÉireannIn execution$25–100mAwarded July 2024
Ceannt Station Galway redevelopmentIarnród ÉireannIn execution$25–100mAwarded October 2023
DART+ Programme periodic indicative noticeIarnród ÉireannPlannedover $1bn
MetroLink global prior information noticeTIIPlannedover $1bn
DART+ Coastal North Malahide Clongriffin Shared IslandIarnród ÉireannPlanned$100–500mAnnounced June 2026
Continuous welded rail transportation delivery systemIarnród ÉireannPlanned$5–25m
Luas onboard radio installation TETRA systemTIIPlannedvalue not reliable on the notice

Cities

CityNetwork statusNetworks
Dublinoperational — the DART, about 50 km of electrified coastal and suburban railway, plus diesel Commuter and Intercity services on four radial corridors and the 43 km Luas light rail network; no metro exists yet, and MetroLink (18.8 km, 16 stations, driverless) is in procurement with its civils and 25-year service contracts closed to bids in 2026DART (Iarnród Éireann); DART+ Programme (in procurement); Luas Red Line and Green Line (Transport Infrastructure Ireland); Luas Finglas extension (Green Line, 3.9 km, four stops); MetroLink Swords–Charlemont (in procurement)
Corkoperational — diesel commuter rail between Mallow, Cork Kent, Cobh and Midleton; Cork Area Commuter Rail phase 1 in execution (Kent Station through platform, Glounthaune to Midleton twin tracking, signalling and communications upgrade), phase 2 proposing eight new stations, two upgrades, a new depot and full electrificationCork Area Commuter Rail (Iarnród Éireann); Cork light rail, proposed within the Cork Metropolitan Area Transport Strategy
Galwayoperational — Intercity services to Dublin via Athlone and Portarlington and a local service to Athenry and Limerick; Ceannt Station redevelopment in execution and Oranmore Station double-tracking consentedGalway Line project, Portarlington to Galway (Iarnród Éireann)
Limerickoperational — Intercity and Commuter services via Limerick Junction, and the new Limerick to Foynes freight link under construction with its cable route and fibre system contractedLimerick to Foynes freight line (Iarnród Éireann)

Players with a footprint here

PlayerKindFootprint
GPX RailTrack & electrification contractorProject presence
TRIURCivil contractorProject presence

What changed

From This Week in Rail, newest first.

  • 2026-10-05 — Iarnród Éireann awards Rhomberg Sersa Rail Group a ten-year, €140m contract.
  • 2026-10-05 — Iarnród Éireann issues a design-and-build tender to deliver DART electric services to Wicklow.
  • 2026-10-05 — Planning permission is set to be granted for a new railway station at Blackpool in Cork.
  • 2026-10-05 — Transport Infrastructure Ireland appoints Amey to its Luas overhead-line-works framework.
  • 2026-09-21 — Ireland's Cabinet approves proceeding to the detailed tender stage for the €15.7 billion Dublin MetroLink. The detailed business case is approved; market bids and delivery partners follow, so it's now a question of who is invited to compete.

Withheld in the free surface

  • Capex in this region (3)
  • Market narrative

Full detail withheld: 2 fields. In the European Union edition · See a fully open example

  • Composition
  • Methodology note

Full detail withheld: 2 fields. In the European Union edition · See a fully open example

Sources

  • ● Government of Ireland — Department of Transport · Almost €230 million Shared Island funding to support investment in all-island rail (press release) (published 2026-06-23 · checked 2026-09-05)
  • ● Department of Transport (Ireland) · All-Island Vision for a New Age of Rail (press release on the Final Report) (published 2024-07-31 · checked 2026-09-13)
  • ● Commission for Railway Regulation · Areas we regulate (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · About the DART+ Programme (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · DART+ Coastal North (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · DART+ Coastal South (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · DART+ Fleet (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · DART+ South West (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · DART+ West (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · Cork Area Commuter Rail (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · Infrastructure Contact Details (asset counts and the three Infrastructure Manager's Offices) (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · Iarnród Éireann Infrastructure (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · Network Statement 2026 (§3.3.1.1 extent of single, double and multiple track; §3.3.1.2 track gauge; §3.3.2.2 weight limits; §3.3.2.6 power supply) (published 2025-12-01 · checked 2026-09-13)
  • ● Iarnród Éireann · Investment in New Trains (published 2026 · checked 2026-09-13)
  • ● Iarnród Éireann · Iarnród Éireann Projects and Investments (published 2026 · checked 2026-09-13)
  • ● Transport Infrastructure Ireland · Luas Finglas — the Green Line extension to Finglas (published 2026 · checked 2026-09-13)
  • ● Transport Infrastructure Ireland · About MetroLink (published 2026 · checked 2026-09-13)
  • ● Transport Infrastructure Ireland · First Major Design and Build Civils Contracts Announced for MetroLink (published 2026-02-03 · checked 2026-09-13)
  • ● Transport Infrastructure Ireland · MetroLink announces contract for supplying trains, tracks and stations and operating service for 25 years (published 2026 · checked 2026-09-13)
  • ● Transport Infrastructure Ireland · MetroLink Preliminary Business Case (published 2026 · checked 2026-09-13)
  • ● Transport Infrastructure Ireland · Transport Infrastructure Ireland Appoints Programme Delivery Partner to Drive MetroLink Construction Phase (published 2026 · checked 2026-09-13)
  • ● Transport Infrastructure Ireland · MetroLink — Procurement news index (M14 Utilities and Enabling Works Framework, M160, M190) (published 2026 · checked 2026-09-13)
  • ● Transport Infrastructure Ireland · Luas Operations (published 2026 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Transport Infrastructure Ireland — MetroLink, Dublin: design and build civil infrastructure contract packages M401 and M402 (change notice) (published 2026-03-23 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Transport Infrastructure Ireland — MetroLink M500 Service Delivery Partner (change notice) (published 2026-06-10 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Transport Infrastructure Ireland — TII400 Luas Operations and Maintenance Contract (contract award notice) (published 2026-09-02 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Transport Infrastructure Ireland — TII522 Electrical Renewals Luas Works (Low Voltage) IMPQQ (change notice) (published 2026-09-07 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Iarnród Éireann — Long term supply and support of a Computer Based Interlocking system (contract award notice) (published 2025-11-05 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Iarnród Éireann and Northern Ireland Railways Company Limited — 8437 Enterprise Fleet Replacement Project (contract award notice) (published 2025-12-22 · checked 2026-09-13)

Browse: the Atlas · European Union · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.