Finland

16 buyers · 39 tenders · checked 2026-10-03

Digirail replacing JKV on 5,915 km with ERTMS, EU derogation 11 September 2026 for mobile networks; 58 M400 Helsinki-Espoo trainsets EUR 1.2bn re-issued April 2026.

Everything here is free. One market edition opens in full with one email. Open your free edition

1Metro systems operating
2Tram systems operational
1Tram systems under construction
16Buyers tracked
39Tenders tracked
Live pipeline
More than EUR 2.1bn of valued 2024–26 rail and urban rail procurements tracked — the largest being the M400 metro trainsets (EUR 1.2bn estimate), the Turku tramway alliance (EUR 291m), the Helsinki metro train control system (EUR 125.6m) and maintenance area 3 (EUR 95.1m) — with the ERTMS central safety system and object controller packages and four maintenance areas in the market at values the notices do not publish
Technology areas
Signalling & train control, Digital operations, Predictive maintenance, Cybersecurity, Rolling-stock hardware, Track & civil, Electrification, AI inspection

Key figures

Finnish national rail network i…5,915 km · 5,502 km trafficableFinnish national rail network in 2024: 5,915 km of which 5,502 km trafficable, 5,200 km single track and 715 km double or multiple track; electrified single-track line 2,920 km and electrified two-or-more-track line 715 km; 1,524 mm gauge, 25 kV 50 Hz; maximum authorised axle weight 22.5 tonnes with 25 tonnes permitted in places; speed limits 220 km/h for passenger and 120 km/h for freight trains
1 source · primary
Väylävirasto's stated annual sp…nearly EUR 300 million a yearVäylävirasto's stated annual spend on track maintenance
1 source · primary
The ERTMS programme covers the…about 6,000 km · JKV replacedThe ERTMS programme covers the replacement of the signalling systems and the current JKV train protection system across the whole Finnish rail network, about 6,000 km, bought as a central safety system package, an object controller package joined through EULYNX interfaces, and per-area service alliances; the existing JKV reaches the end of its life around the end of the 2020s and the programme targets ETCS-level capability without lineside signals, FRMCS data transmission and grade of automation 2
2 sources · all primary
  • ● European Union · TED notice 80353-2026 — ERTMS-ohjelman rataosa-alueiden 2, 3 ja 4 palveluallianssi, suunnitteluhankinta (Väylävirasto) (published 2026-02-04 · checked 2026-09-13)
  • ● Digirail (Digirata) programme · About Digirail (published 2026 · checked 2026-09-13)
The European Commission granted…EU derogation granted 11 September 2026The European Commission granted Finland an exemption permitting train control communications over telecommunications operators' existing commercial mobile networks instead of a dedicated rail radio network; Digirail states a dedicated 5G network would have cost hundreds of millions of euros and the chosen route saves tens of millions. Testing moves next to the Tampere–Pori/Rauma section, the first line section to use the new system in regular passenger and freight traffic
2 sources · all primary
  • ● Digirail (Digirata) programme · Finland received a special exemption from the EU: train control communications may be carried out over commercial mobile networks (published 2026-09-11 · checked 2026-09-13)
  • ● Digirail (Digirata) programme · Testing on the Tampere–Pori/Rauma track section progressed over the summer (published 2026-09-07 · checked 2026-09-13)
State purchases of public servi…EUR 34.87 million a year, 2022–2030State purchases of public service obligation passenger rail under the direct-award agreement with VR, against about EUR 34.9 million a year before 2021; the agreement expires at the end of 2030 and the services must then be tendered. Traficom is preparing that tendering
3 sources · all primary
VR Group key figures for 1–12/2…EUR 1,252.5m revenue in 2025VR Group key figures for 1–12/2025: revenue EUR 1,252.5 million, operating result EUR 137.0 million, net result EUR 94.5 million, investments EUR 237.4 million, operating cash flow EUR 288.7 million, net debt EUR 447.8 million, gearing 34.1 per cent and 7,631 full-time equivalents on average. About 84 per cent of long-distance travel by passenger count is VR's own market-priced traffic; its exclusive right in passenger transport ended at the start of 2021
2 sources · all primary
Pääkaupunkiseudun Kaupunkiliike…46 km metro track · 173 km tram linesPääkaupunkiseudun Kaupunkiliikenne Oy operates 46 km of two-way metro track and 173 km of tram lines with 147 million public transport trips a year, 4,600 city bikes at 460 stations and 1,571 employees; Länsimetro Oy owns the 21 km, 13-station western extension, close to half the region's metro route kilometres. The M300 fleet is 20 four-car CAF trains delivered in 2015 and 2016
3 sources · all primary
Tampere's tramway opened in 202…2 operational · 1 under constructionTampere's tramway opened in 2021 and reached 79 million passenger journeys by August 2026 with 26 Škoda Transtech ForCity Smart Artic X34 trams; Helsinki's tram network runs 173 km of line; Turku's 12 km first line is due to carry passengers from 2033
4 sources · all primary
Väylävirasto states that a larg…more than EUR 10 billion of development needsVäylävirasto states that a large number of good and necessary projects were left outside the investment programme for 2027–2034 because development needs total more than EUR 10 billion while only a fraction of that sum is available; the programme package implements the Liikenne 12 national plan approved in December 2025
2 sources · all primary
  • ● Väylävirasto · Investment programme 2027–2034 (published 2026 · checked 2026-09-13)
  • ● Väylävirasto · Ohjelmakokonaisuus — Liikenne 12 programme and plan package (published 2026 · checked 2026-09-13)

Buyers

Tenders

TenderBuyerStatusValue bandNext key date
MLNRV3 Artic X34 tram HVAC sparesRV Kalusto ja VarikkoOpenvalue not publishedCloses October 2026
M400 metro trainsets Helsinki area 58 unitsHKLBids closedover $1bnPublished March 2026
Electrical telecom works frameworkKaupunkiliikenneBids closed$25–100mBids closed June 2026 · award expected
Construction works frameworkKaupunkiliikenneBids closed$25–100mBids closed August 2025 · no award published
Creosote-impregnated sleepers treatment 2026–2028VäylävirastoBids closed$5–25mBids closed October 2025 · award expected
Light rail PR15 depot maintenance hallRV Kalusto ja VarikkoBids closedvalue not publishedBids closed March 2026 · award expected
Väylävirasto Uusimaa maintenance alliance, track and signalling · 2 partsVäylävirastoBids closedVaries by part
Uusimaa signalling maintenance alliance 2027–2032VäylävirastoBids closedvalue not publishedPublished February 2026
Uusimaa track superstructure maintenance alliance 2027–2032VäylävirastoBids closedvalue not publishedPublished February 2026
Oulu passenger yard improvement RU2VäylävirastoBids closedvalue not publishedPublished June 2026
Track signalling maintenance Oulu–Lapland 2026–2031VäylävirastoBids closedvalue not publishedPublished January 2026
ERTMS central safety system CSS supportVäylävirastoBids closedvalue not published
ERTMS object controller OC supply installationVäylävirastoBids closedvalue not publishedPublished April 2026
Lappeenranta–Lauritsala construction consultancy Karelian lineVäylävirastoBids closedvalue not publishedBids closed August 2026 · award expected
Railway switch assembly 2027–2029 two lotsVäylävirastoBids closedvalue not publishedPublished August 2026
Electrified railway maintenance Tampere Oulu 2027–2029VäylävirastoBids closedvalue not publishedPublished April 2026
Rail and switch profiling servicesVäylävirastoBids closedvalue not publishedBids closed September 2026 · award expected
Track signalling maintenance Haapamäen tähti 2027–2032VäylävirastoBids closedvalue not publishedPublished June 2026
Metro automatic train control system METKAHKLAwarded$100–500mAwarded January 2026
Track signalling maintenance Riihimäki–Kokkola 2026–2030VäylävirastoAwarded$100–500mAwarded June 2025
Metro mobile radio network train integrationHKLAwarded$25–100mAwarded January 2026
Vaarala tram depot building collaborative managementKaupunkiliikenneAwarded$25–100mAwarded April 2026
ETCS Baseline 4 Sr3 locomotive upgradeVR GroupAwarded$25–100mAwarded October 2025
Kannelmäki railway station refurbishmentKaupunkiliikenneAwarded$5–25mAwarded March 2026
MLNRV3 Artic X34 tram bogie overhaulKaupunkiliikenneAwarded$5–25mAwarded February 2026
Malminkartano railway station refurbishmentKaupunkiliikenneAwarded$5–25mAwarded March 2026
Pohjois-Haaga railway station refurbishmentKaupunkiliikenneAwarded$5–25mAwarded April 2026
ERTMS design areas 2 3 4 allianceVäylävirastoAwarded$5–25mAwarded May 2026
Kontiomäki raw-timber terminal extension stage 1VäylävirastoAwarded$5–25mAwarded April 2026
Track asset management Southern Finland 2026–2029VäylävirastoAwarded$5–25mAwarded April 2026
Tramway alliance TV1 TV2 stagesTurun RaitiotieIn execution$100–500mCompletion 2028
Tram rolling stock first line 14Turun RaitiotiePlannedEUR 65–75m (city estimate for 14 trams)
M300 metro modifications control radio systemsHKLPlanned$5–25mSanctioned March 2026
Helsinki region commuter train operation maintenanceHSLPlannedvalue not published
ETCS ATO onboard Sm5 fleet surveyJunakalustoPlannedvalue not published
Lielahti–Ylöjärvi tramway project planTampereen RaitiotiePlannedvalue not published
Rauma–Tampere passenger rail service direct awardTraficomPlannedvalue not published
Public service obligation passenger rail servicesTraficomPlannedvalue not published
Freight wagons market surveyVR GroupPlannedvalue not published
Liminka–Oulu double track design constructionVäylävirastoPlannedvalue not published

Cities

CityNetwork statusNetworks
Helsinkioperational — a driverless-capable metro across 46 km of two-way track and 173 km of tram lines carrying 147 million public transport trips a year, plus the HSL commuter rail network; a new CAF train control system and Telia radio network signed 20 January 2026, up to 58 M400 trainsets in procurement, and the Vaarala tram depot under constructionHelsinki metro (HKL, Pääkaupunkiseudun Kaupunkiliikenne Oy); Länsimetro western extension; Helsinki tram network; Light rail line PR15; HSL commuter rail (Sm5 fleet, Pääkaupunkiseudun Junakalusto Oy)
Espoooperational — the 21 km, 13-station western metro extension from Lauttasaari to Kivenlahti owned by Länsimetro Oy, with costs split roughly 83.5 per cent Espoo and 16.5 per cent Helsinki; the Espoo city rail additional tracks between Leppävaara and Kauklahti in deliveryLänsimetro (Helsinki metro western extension); Espoo city rail (Espoon kaupunkirata)
Tampereoperational — tramway open since 2021, 79 million passenger journeys by August 2026, 26 Škoda Transtech ForCity Smart Artic X34 trams at 1,435 mm gauge and 750 V; the Lielahti–Ylöjärvi extension at project plan stage and one of the two ERTMS control-centre maintenance areasTampere tramway (Tampereen Raitiotie Oy); Lielahti–Ylöjärvi extension (project plan)
Turkuunder construction — a 12 km tramway with 20 stops from Linnakaupunki through Kauppatori and Kupittaa to Varissuo at EUR 465 million, main construction 2028–2032 and services from 2033, delivered by the Auratikka alliance; the western end of the planned Helsinki–Turku fast connectionTurku tramway (Turun Raitiotie Oy); Helsinki–Turku fast rail connection (Länsirata Oy)
Ouluoperational main-line node under upgrade — the Liminka–Oulu second track in design and procurement, the Oulu passenger yard improvement contract RU2 closed for participation in June 2026, one of Fintraffic Raide's four traffic control centres and one of the two electrified-railway maintenance control-centre areasLiminka–Oulu double track; Oulu passenger yard (Oulun henkilöratapiha)

Players with a footprint here

PlayerKindFootprint
GRKCivil contractorProject presence
KreateCivil contractorProject presence

What changed

From This Week in Rail, newest first.

  • 2026-10-05 — Finland's Fintraffic begins renewing its rail traffic-control system, bringing traffic controllers into the redesign. A control-room/signalling modernisation — relevant to digital-operations and signalling vendors.
  • 2026-09-28 — Turku's tramway moves to its delivery phase as the alliance agreement is signed.
  • 2026-09-28 — Construction of Turku's tramway can begin after no enforcement ban was ordered.
  • 2026-09-21 — Turku's tramway project renovates the historic Cathedral Bridge crossing, calling it a demanding undertaking.
  • 2026-09-21 — Award-winning architecture firm ALA is appointed to design the station for Finland's planned Lentorata airport rail link.

Withheld in the free surface

  • Capex in this region (3)
  • Market narrative

Full detail withheld: 2 fields. In the European Union edition · See a fully open example

  • ERTMS procurement state
  • Maintenance structure
  • Metka programme
  • Helsinki group structure
  • Project companies
  • Urban rail costs
  • Methodology note

Full detail withheld: 7 fields. In the European Union edition · See a fully open example

Browse: the Atlas · European Union · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.