? How to use this page
How to use a buyer page
- Who this buyer is, then who already holds positions here and what it is tendering.
- Click Watch and every change lands in your weekly digest.
- How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.
Hovedstadens Letbane I/S
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the European Union edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Type
- Metro corporation — interessentskab owned by Region Hovedstaden (43.0 per cent) and eleven municipalities along Ring 3; the state withdrew as owner on 1 January 2019 and its contribution became a grant
- Market · Region
- European Union · Denmark
- Open tenders
- 0
- Technology areas
- Signalling & train control, Digital operations, Predictive maintenance, Rolling-stock hardware, Track & civil, Electrification
Owns the Ring 3 light rail, 28 km with 29 stations between Ishøj and Lundtofte.
About this buyer
Read more
Built and owns the Ring 3 light rail, 28 km with 29 stations between Ishøj and Lundtofte, connecting six S-bane stations, Herlev and Glostrup hospitals and DTU. The southern section opened on 26 October 2025 and the full line on 22 August 2026, on a construction budget of DKK 9,624m; 29 Siemens Avenio vehicles run it and Metro Service holds the fifteen-year operation and maintenance contract.
- Type
- Metro corporation — interessentskab owned by Region Hovedstaden (43.0 per cent) and eleven municipalities along Ring 3; the state withdrew as owner on 1 January 2019 and its contribution became a grant
- Where
- Denmark · Copenhagen
- Technology areas
- Signalling & train control, Digital operations, Predictive maintenance, Rolling-stock hardware, Track & civil, Electrification
Structure
- regulated by Trafikstyrelsen — Approved the safety of the second stage of the Ring 3 light rail before it opened on 22 August 2026 (active · since 2026-08)
Who holds what here
- awarded Siemens Mobility — Ring 3 transportation system: 29 Siemens Avenio vehicles and the railway infrastructure, delivered by a consortium of Siemens AG, Siemens A/S and Aarsleff Rail (active)
- Contract detail and values (1)In the European Union edition See a fully open example
Sources for these relationships (4)
- ● Hovedstadens Letbane I/S · Stor tilslutning: 50.000 kørte med da hele Letbanen blev indviet (published 2026-08-23 · checked 2026-09-12)
- ● Hovedstadens Letbane I/S · Årsrapport 2025 (anlægsbudget, ejerindskud og ejerandele, driftsoperatør) (published 2026 · checked 2026-09-12)
- ● Hovedstadens Letbane I/S · Hovedstadens Letbane modtager sit første tog (Siemens Avenio) (published 2023-08-25 · checked 2026-09-12)
- ● Hovedstadens Letbane I/S · Historik — tidslinje og kontrakter (published 2026 · checked 2026-09-12)
Withheld in the free surface
- Procurement structure
- Award history (4)
- Entry path
- Published contacts (2)
- Portals (1)
Full detail withheld: 5 fields. In the European Union edition · See a fully open example
6 sources · all primary
- ● Hovedstadens Letbane I/S · Årsrapport 2025 (anlægsbudget, ejerindskud og ejerandele, driftsoperatør) (published 2026 · checked 2026-09-12)
- ● Hovedstadens Letbane I/S · Historik — tidslinje og kontrakter (published 2026 · checked 2026-09-12)
- ● Hovedstadens Letbane I/S · Stor tilslutning: 50.000 kørte med da hele Letbanen blev indviet (published 2026-08-23 · checked 2026-09-12)
- ● Hovedstadens Letbane I/S · Hovedstadens Letbane modtager sit første tog (Siemens Avenio) (published 2023-08-25 · checked 2026-09-12)
- ● Hovedstadens Letbane I/S · Kontakt og kundeservice (published 2026 · checked 2026-09-12)
- ● Metro Service A/S · Om os — drift og vedligehold af Metroen i København og driften af Hovedstadens Letbane (published 2026 · checked 2026-09-12)
Browse: the Atlas · European Union · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.