? How to use this page
How to use a buyer page
- Who this buyer is, then who already holds positions here and what it is tendering.
- Click Watch and every change lands in your weekly digest.
- How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.
Bundesministerium für Verkehr
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the European Union edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Type
- National rail HQ — federal transport ministry; writes the rail legal framework and provides the federal funds
- Market · Region
- European Union · Germany
- Open tenders
- 0
- Technology areas
- Track & civil, Signalling & train control, Electrification, Digital operations
Sets German rail framework and funds network; Hochleistungsnetz target 9,400 km by 2030.
About this buyer
Read more
Sets the German rail legal framework and funds the network through its Abteilung Eisenbahnen: the Leistungs- und Finanzierungsvereinbarung III signed with Deutsche Bahn on 14 January 2020 runs to 2029 and totals about €86.2bn, an average €8.62bn a year of which about €62bn is federal money. Its Hochleistungsnetz target is 9,400 km by 2030, including 4,200 km of renewal, 350 smaller capacity measures and 750 km of new track; the ministry states the corridor sequence is still being revised.
- Type
- National rail HQ — federal transport ministry; writes the rail legal framework and provides the federal funds
- Where
- Germany · Berlin
- Programmes
- ERTMS / ETCS, TEN-T, Connecting Europe Facility
- Technology areas
- Track & civil, Signalling & train control, Electrification, Digital operations
Structure
- funds DB InfraGO — Leistungs- und Finanzierungsvereinbarung III to, of which federal funds (active · since 2020-01-01)
- controls EBA — Bundesoberbehörde under the ministry's technical and legal supervision (active)
- Contract detail and values (1)over $1bnIn the European Union edition See a fully open example
Sources for these relationships (2)
- ● Bundesministerium für Verkehr · Erhalt der Infrastruktur (Leistungs- und Finanzierungsvereinbarung III) (published 2022-02-10 · checked 2026-09-12)
- ● Eisenbahn-Bundesamt · Das Eisenbahn-Bundesamt (checked 2026-09-12)
Withheld in the free surface
- Procurement structure
- Award history (0)
- Entry path
- Portals (1)
- Published contacts (3)
Full detail withheld: 5 fields. In the European Union edition · See a fully open example
4 sources · all primary
- ● Bundesministerium für Verkehr · Impressum (published 2025-05-13 · checked 2026-09-12)
- ● Bundesministerium für Verkehr · Schienenverkehr kompakt (published 2025-08-27 · checked 2026-09-12)
- ● Bundesministerium für Verkehr · Erhalt der Infrastruktur (Leistungs- und Finanzierungsvereinbarung III) (published 2022-02-10 · checked 2026-09-12)
- ● Bundesministerium für Verkehr · Korridorsanierung für die Schiene (published 2025-07-30 · checked 2026-09-12)
Browse: the Atlas · European Union · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.