Tender · In execution
? How to use this page

How to use a tender page

  1. What is being bought, for how much, and what happens next.
  2. Next step tells you the procedure and where the notice is; Watch to follow deadlines and the award.
  3. Full scope, exact values, dates and bidders open with this market's edition, with a calendar export.

SEPTA Trolley Modernization 130 Low-floor ADA Alstom

SEPTA Trolley Modernization — 130 low-floor ADA trolleys from Alstom plus stations, heavy maintenance facility, tunnel signalling and power

Awarded to Alstom — Southeastern Pennsylvania Transportation Authority now holds 1 position with this supplier.

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
Southeastern Pennsylvania Transportation Authority
Where
Pennsylvania · Philadelphia
Segments
Rolling stock, Track, Signalling, Stations & depots, Electrification, Civil works
Technology areas
Rolling-stock hardware, Signalling & train control, Track & civil, Predictive maintenance
Status
In execution — Alstom Transportation, Inc.
Value band
over $1bn
Currency
USD
Key dates (month)
Vehicle contract awarded February 2023 · Vehicle design 2023–20 · Manufacture 2027–20 · Vehicle testing 2029–20 · Fleet delivery 2030–20 · Design and construction 2023–20

Status in full

Read more

Alstom Transportation, Inc. was awarded the vehicle contract in February 2023 with an option for up to 30 additional trolleys; vehicle design runs 2023-2027, manufacture 2027-2030 and fleet delivery and deployment 2030-2034. SEPTA's project status table shows Trolley Vehicle Replacement and the 5100 Grays maintenance facility in design, Blossom at Bartram complete, T5 in design and the T1 corridor analysis in planning.

Next step

In execution — awarded and under way.

Read the notice: Southeastern Pennsylvania Transportation Authority ↗

Recorded award: Alstom — 130 low-floor ADA-compliant trolleys for Trolley Modernization, with an option for up to 30 more

Withheld in the free surface

  • Full scope
  • Exact value
  • How the figure was arrived at
  • Key dates (6)
  • Published bidders

Full detail withheld: 5 fields. In the United States edition · See a fully open example

3 sources · all primary

Related tenders

Same buyer first, then the same segment in this market.

TenderBuyerStatusValue bandNext key date
SEPTA Green Line CBTC Replacement Philadelphia TrolleySEPTAOpenvalue not publishedPublished July 2026
SEPTA Silverliner VI 234 Regional Rail EMUSEPTAOpencontract value not publishedPublished November 2025
SEPTA Trolley Modernization Eleven Design Construction PackagesSEPTAPlannedno values published (pre-solicitation pipeline)Announced May 2026
Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
SEPTA L-Line Automated Train Control M-5 FleetSEPTABids closed$500m–1bnPublished May 2026
SEPTA Market-Frankford Line 200 M-5 Hitachi RailSEPTAIn executionover $1bn
SEPTA Regional Rail Silverliner VI Facility UpgradesSEPTAPlanned$100–500m

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.