South Carolina Department of Transportation
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Type
- State DOT — State department of transportation; its Intermodal and Freight Programs office is the State Rail Transportation Authority, writes the statewide rail plan, manages rail-highway crossing funds and the Assembly Street consolidation, and is the applicant on the Upstate Express BUILD grant
- Market · Region
- United States · South Carolina
- Open tenders
- 0
- Technology areas
- Track & civil, Signalling & train control
South Carolina's State Rail Transportation Authority; writes the rail plan, backs grants and manages crossing safety funds.
About this buyer
Read more
Named the State Rail Transportation Authority under the 2008 passenger rail law. Its Statewide Rail Plan 2024 was accepted by the FRA on 8 May 2025, with the next submission due in May 2029. It does not own track or trains: the state has no dedicated funding programme for freight or passenger rail, and Class I railroads fund their own capital. Its rail projects are the Upstate Express corridor project, serving Inland Port Greer, and the Assembly Street rail consolidation in Columbia, plus the federal Section 130 crossing-safety programme.
- Type
- State DOT — State department of transportation; its Intermodal and Freight Programs office is the State Rail Transportation Authority, writes the statewide rail plan, manages rail-highway crossing funds and the Assembly Street consolidation, and is the applicant on the Upstate Express BUILD grant
- Where
- South Carolina · Columbia
- Programmes
- FRA Consolidated Rail Infrastructure and Safety Improvements, IIJA / Bipartisan Infrastructure Law
- Technology areas
- Track & civil, Signalling & train control
Structure
- funded by USDOT — BUILD discretionary grant for the Upstate Express Corridor Capacity Expansion, awarded on behalf of Norfolk Southern and SC Ports (active)
- Contract detail and values (1)$25–100mIn the United States edition See a fully open example
Sources for these relationships (2)
- ● SCDOT · 2022 Rail Plan Analysis Implementation Update, January 2023, filed with the General Assembly: SCDOT as State Rail Transportation Authority, BUILD award for the Upstate Express project, Camp Hall INFRA award, Assembly Street consolidation. Read 8 October 2026. (published 2023-01 · checked 2026-10-08)
- ● SCDOT / FRA · South Carolina Statewide Rail Plan 2024 (Cambridge Systematics for SCDOT, November 2024) bound with the FRA acceptance letter of 8 May 2025: funding sources, projects under construction (Table 4-2), unfunded needs (Tables 4-3, 4-7, 5-1), Palmetto Railways profile, CRISI, INFRA and BUILD awards. Read 8 October 2026. (published 2025-05-08 · checked 2026-10-08)
Tenders
| Tender | Status | Value band | Next key date |
|---|---|---|---|
| Upstate Express corridor capacity expansion | In execution | $25–100m |
Withheld in the free surface
- Procurement structure
- Published contacts (1)
- Award history (3)
Full detail withheld: 3 fields. In the United States edition · See a fully open example