? How to use this page
How to use a buyer page
- Who this buyer is, then who already holds positions here and what it is tendering.
- Click Watch and every change lands in your weekly digest.
- How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.
MTA Construction & Development
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Type
- Development authority — MTA's capital delivery arm; lets the megaproject and state-of-good-repair construction contracts
- Market · Region
- United States · New York
- Open tenders
- 0
- Technology areas
- Track & civil, Signalling & train control, Digital operations, AI inspection, Electrification
Lets MTA capital construction including Second Avenue Subway Phase 2, Interborough Express, Penn Station Access.
About this buyer
Read more
Lets the MTA's capital construction: Second Avenue Subway Phase 2 (budget $6.968bn), the Interborough Express, Penn Station Access and the station and accessibility programme.
- Type
- Development authority — MTA's capital delivery arm; lets the megaproject and state-of-good-repair construction contracts
- Where
- New York · New York City
- Programmes
- FTA Capital Investment Grants, IIJA / Bipartisan Infrastructure Law
- Technology areas
- Track & civil, Signalling & train control, Digital operations, AI inspection, Electrification
Structure
- controlled by MTA — Capital delivery arm of the MTA (active)
Who holds what here
- awarded Skanska — Second Avenue Subway Phase 2 Contract 3, design-build in joint venture with Traylor Bros. and Walsh Construction (active · since 2026-06)
- awarded Walsh — Second Avenue Subway Phase 2 Contract 3, joint venture member (active · since 2026-06)
- awarded Traylor — MTA Second Avenue Subway Phase 2 106th Street — Traylor Bros. Inc. (active · since 2026-06)
- awarded Jacobs — Interborough Express design and engineering, in joint venture with HDR (active · since 2025-08)
- awarded HDR — Interborough Express design and engineering, joint venture member (active · since 2025-08)
- awarded RailWorks — MTA Penn Station Access four Bronx stations — RailWorks (active)
- Contract detail and values (2)over $1bn · $100–500mIn the United States edition See a fully open example
Sources for these relationships (7)
- ○ Engineering News-Record · MTA exec blames Amtrak for three-year delay on $2.9B Penn Station Access project (published 2025-10-28 · checked 2026-09-12)
- ○ Engineering News-Record · MTA awards $1B contract for Second Ave Subway Phase II station package (published 2026-06-01 · checked 2026-09-12)
- ● Metropolitan Transportation Authority · Procurement contacts (per-agency procurement desks) (published 2026 · checked 2026-09-12)
- ○ Railway-News · New York's MTA records $15.8 billion in capital commitments for 2025 (published 2026-01-29 · checked 2026-09-12)
- ○ Railway-News · Interborough Express Brooklyn-Queens rail link moves into design phase (published 2025-08-04 · checked 2026-09-12)
- ○ Railway-News · Groundbreaking takes place for Metro-North Penn Station Access project (published 2022-12-09 · checked 2026-09-12)
- ○ Railway-News · MTA breaks ground on construction of Second Avenue Subway Phase 2 project (published 2026-06-15 · checked 2026-09-12)
Tenders
| Tender | Status | Value band | Next key date |
|---|---|---|---|
| MTA Second Avenue Subway Phase 2 106th Street | Awarded | over $1bn | Awarded June 2026 |
| MTA Penn Station Access four Bronx stations | In execution | over $1bn | Completion 2024 |
| MTA Second Avenue Subway Phase 2 2032 | In execution | $6.97-7.7bn (programme; the two published figures differ) | |
| MTA Second Avenue Subway Phase 2 tunnels | In execution | over $1bn | Awarded 2025 |
| MTA Interborough Express design Jacobs-HDR venture | In execution | $100–500m | |
| MTA Interborough Express light rail 14 miles | Planned | over $1bn |
Withheld in the free surface
- Procurement structure
- Published contacts (1)
- Award history (4)
- Entry path
- Portals (1)
Full detail withheld: 5 fields. In the United States edition · See a fully open example
4 sources · 1 primary
- ● Metropolitan Transportation Authority · Procurement contacts (per-agency procurement desks) (published 2026 · checked 2026-09-12)
- ○ Engineering News-Record · MTA awards $1B contract for Second Ave Subway Phase II station package (published 2026-06-01 · checked 2026-09-12)
- ○ Railway-News · Interborough Express Brooklyn-Queens rail link moves into design phase (published 2025-08-04 · checked 2026-09-12)
- ○ Engineering News-Record · MTA exec blames Amtrak for three-year delay on $2.9B Penn Station Access project (published 2025-10-28 · checked 2026-09-12)
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.