Buyer · Development authority
? How to use this page

How to use a buyer page

  1. Who this buyer is, then who already holds positions here and what it is tendering.
  2. Click Watch and every change lands in your weekly digest.
  3. How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.

MTA Construction & Development

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Type
Development authority — MTA's capital delivery arm; lets the megaproject and state-of-good-repair construction contracts
Market · Region
United States · New York
Open tenders
0
Technology areas
Track & civil, Signalling & train control, Digital operations, AI inspection, Electrification

Lets MTA capital construction including Second Avenue Subway Phase 2, Interborough Express, Penn Station Access.

About this buyer

Read more

Lets the MTA's capital construction: Second Avenue Subway Phase 2 (budget $6.968bn), the Interborough Express, Penn Station Access and the station and accessibility programme.

Type
Development authority — MTA's capital delivery arm; lets the megaproject and state-of-good-repair construction contracts
Where
New York · New York City
Programmes
FTA Capital Investment Grants, IIJA / Bipartisan Infrastructure Law
Technology areas
Track & civil, Signalling & train control, Digital operations, AI inspection, Electrification

Structure

  • controlled by MTA — Capital delivery arm of the MTA (active)

Who holds what here

  • awarded Skanska — Second Avenue Subway Phase 2 Contract 3, design-build in joint venture with Traylor Bros. and Walsh Construction (active · since 2026-06)
  • awarded Walsh — Second Avenue Subway Phase 2 Contract 3, joint venture member (active · since 2026-06)
  • awarded Traylor — MTA Second Avenue Subway Phase 2 106th Street — Traylor Bros. Inc. (active · since 2026-06)
  • awarded Jacobs — Interborough Express design and engineering, in joint venture with HDR (active · since 2025-08)
  • awarded HDR — Interborough Express design and engineering, joint venture member (active · since 2025-08)
  • awarded RailWorks — MTA Penn Station Access four Bronx stations — RailWorks (active)
Sources for these relationships (7)
  • ○ Engineering News-Record · MTA exec blames Amtrak for three-year delay on $2.9B Penn Station Access project (published 2025-10-28 · checked 2026-09-12)
  • ○ Engineering News-Record · MTA awards $1B contract for Second Ave Subway Phase II station package (published 2026-06-01 · checked 2026-09-12)
  • ● Metropolitan Transportation Authority · Procurement contacts (per-agency procurement desks) (published 2026 · checked 2026-09-12)
  • ○ Railway-News · New York's MTA records $15.8 billion in capital commitments for 2025 (published 2026-01-29 · checked 2026-09-12)
  • ○ Railway-News · Interborough Express Brooklyn-Queens rail link moves into design phase (published 2025-08-04 · checked 2026-09-12)
  • ○ Railway-News · Groundbreaking takes place for Metro-North Penn Station Access project (published 2022-12-09 · checked 2026-09-12)
  • ○ Railway-News · MTA breaks ground on construction of Second Avenue Subway Phase 2 project (published 2026-06-15 · checked 2026-09-12)

Tenders

TenderStatusValue bandNext key date
MTA Second Avenue Subway Phase 2 106th StreetAwardedover $1bnAwarded June 2026
MTA Penn Station Access four Bronx stationsIn executionover $1bnCompletion 2024
MTA Second Avenue Subway Phase 2 2032In execution$6.97-7.7bn (programme; the two published figures differ)
MTA Second Avenue Subway Phase 2 tunnelsIn executionover $1bnAwarded 2025
MTA Interborough Express design Jacobs-HDR ventureIn execution$100–500m
MTA Interborough Express light rail 14 milesPlannedover $1bn

Withheld in the free surface

  • Procurement structure
  • Published contacts (1)
  • Award history (4)
  • Entry path
  • Portals (1)

Full detail withheld: 5 fields. In the United States edition · See a fully open example

4 sources · 1 primary
  • ● Metropolitan Transportation Authority · Procurement contacts (per-agency procurement desks) (published 2026 · checked 2026-09-12)
  • ○ Engineering News-Record · MTA awards $1B contract for Second Ave Subway Phase II station package (published 2026-06-01 · checked 2026-09-12)
  • ○ Railway-News · Interborough Express Brooklyn-Queens rail link moves into design phase (published 2025-08-04 · checked 2026-09-12)
  • ○ Engineering News-Record · MTA exec blames Amtrak for three-year delay on $2.9B Penn Station Access project (published 2025-10-28 · checked 2026-09-12)

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.