? How to use this page
How to use a buyer page
- Who this buyer is, then who already holds positions here and what it is tendering.
- Click Watch and every change lands in your weekly digest.
- How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.
Canadian Pacific Kansas City (US operations)
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Type
- Freight railroad — Class I; listed (NYSE: CP, TSX: CP); Canadian-headquartered, with a US network
- Market · Region
- United States
- Open tenders
- 0
- Technology areas
- Rolling-stock hardware, Predictive maintenance, Digital operations, Track & civil, Signalling & train control, Cybersecurity
Class I linking Canada, the US and Mexico, buying Tier 4 locomotives and track materials from US manufacturers.
About this buyer
Read more
Owns and operates a transcontinental network of approximately 20,000 route-miles across Canada, the United States and Mexico, of which the US lines are carried here; buys locomotives, track materials, signalling and contractor services under an annual capital programme running to billions of dollars across the network.
- Type
- Freight railroad — Class I; listed (NYSE: CP, TSX: CP); Canadian-headquartered, with a US network
- Technology areas
- Rolling-stock hardware, Predictive maintenance, Digital operations, Track & civil, Signalling & train control, Cybersecurity
- Also a player
- CPKC
Who holds what here
- awarded Wabtec — Tier 4 road locomotives, 100 delivered in 2025 and 70 due in 2026 (active · since 2026-01-21)
- awarded Progress Rail — SD70ACe-T4 road locomotives, 30 due in the second half of 2026 (active · since 2026-01-21)
- supplies WisDOT — Host railroad: Hiawatha trains run on CPKC track from Green Oaks, Illinois to Milwaukee, and the Borealis began under an agreement with CPKC; the Muskego Yard Bypass and Hiawatha West works are on CPKC corridors (active · since 2024-05-21)
- Contract detail and values (2)In the United States edition See a fully open example
Sources for these relationships (4)
- ● CPKC (investor newsroom) · CPKC investing US$800 million in American manufacturing with Tier 4 locomotives (published 2026-01-21 · checked 2026-10-07)
- ● WisDOT · Milwaukee Airport Rail Station Second Platform and Pedestrian Overpass Project page: 2017 CRISI grant, 800-foot platform, elevator towers and bridge, 0.6 miles of track surfacing, design November 2019 to December 2022, letting April 2023, construction from June 2023. Read 7 October 2026. (checked 2026-10-07)
- ● WisDOT · Muskego Yard Freight Rail Bypass Project page: new double-track mainline through Muskego Yard on the CPKC corridor, centralised traffic control, Burnham Canal and Menomonee Valley bridge rehabilitation; environmental clearance and preliminary engineering completed June 2023; final design expected 2026 and construction expected 2028, dependent on funding. Read 7 October 2026. (checked 2026-10-07)
- ● WisDOT · Twin Cities-Milwaukee-Chicago (TCMC) Intercity Passenger Rail Infrastructure Project page: Borealis start 21 May 2024, $53 million project, $31.8 million CRISI grant of September 2020, $12.6 million Restoration and Enhancement grant of May 2020, construction anticipated 2025 to 2027, La Crosse works list. Read 7 October 2026. (checked 2026-10-07)
Tenders
| Tender | Status | Value band | Next key date |
|---|---|---|---|
| CPKC US-built Tier 4 locomotive programme | In execution | $800m+ (programme) | |
| CPKC 2026 capital programme (network-wide) | Planned | over $1bn |
Withheld in the free surface
- Procurement structure
- Entry path
- Portals (3)
- Published contacts (1)
- Award history (2)
Full detail withheld: 5 fields. In the United States edition · See a fully open example
4 sources · all primary
- ● CPKC (suppliers) · Suppliers: become a supplier, strategic procurement contact form, ISNetworld and e-RAILSAFE (checked 2026-10-07)
- ● CPKC (suppliers) · Purchase Order Terms and Conditions, USA Services (February 2024) (published 2024-02-01 · checked 2026-10-07)
- ● CPKC (fourth quarter 2025 results release, Exhibit 99.1) · Full-year 2026 guidance: capital expenditures; network of approximately 20,000 route miles across Canada, the US and Mexico (published 2026-01-28 · checked 2026-10-07)
- ● CPKC (investor newsroom) · CPKC investing US$800 million in American manufacturing with Tier 4 locomotives (published 2026-01-21 · checked 2026-10-07)
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.