Player · Civil contractor
? How to use this page

How to use a player page

  1. Where this supplier already holds positions, market by market.
  2. Competes with shows its rivals; Compare puts two players side by side.
  3. Order book and the partner path open with an edition.

Kiewit

Private · HQ United States

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the editions it is active in — one edition is free with one email. Open your free edition · Open this record in the Atlas

Kind
Civil contractor
Markets
2
Positions held
9

Employee-owned US contractor.

Kind
Civil contractor
Headquarters
United States
Ownership
Private
Segments
Civil works, Track, Stations & depots
Present in
United States, Canada

Footprint

United States

KindWhereDetailSources
HeadquartersOmaha; rail, transit and systems market — Federal Way Link, Austin Light Rail (progressive design-build), Denver Union Station
  • ● Kiewit · Rail, transit and systems (checked 2026-09-06)

Canada

KindWhereDetailSources
Project presenceOntarioOttawa LRT Stage 2 (East-West Connectors), Waterloo LRT, Spadina subway extension
  • ● Kiewit · Ottawa LRT Stage 2 (East-West Connectors) (checked 2026-09-06)

Positions held

SegmentTechnologyPhase
  • awarded by CHSRA — Track and systems installation across the 119-mile Central Valley guideway (active · since 2026-06-01)
  • awarded by ATP — Member of Kiewit Austin Partnership, the design-build contractor for the Austin Light Rail Operations and Maintenance Facility (active · since 2026-04-15)
  • awarded by CDPQ Infra — TramCité civil contract — consortium Tram Alliance (Construction Kiewit Cie with EBC Inc.), preferred consortium 26 March 2026 (active · since 2026-03)
  • awarded by ATP — Austin Light Rail Phase 1 — Kiewit Austin Partnership (active · since 2026-01)
  • awarded by UTA — S-Line Extension Phase 1 pre-construction design, Change Order 4 for systems and pre-curved rail procurement, on the 22 October 2025 board agenda (Kiewit Infrastructure West Co.) (active · since 2025-10-22)
  • awarded by VTA — BART Silicon Valley Phase II CP2 tunnel and trackwork, progressive design-build (active · since 2022-05)
  • awarded by Alaska Railroad — Construction contractor for the Eagle River Bridge 127.5 replacement, selected in 2022 per the railroad's fact sheet (active · since 2022)
  • awarded by Valley Metro — Construction-manager-at-risk services for the South Central Extension/Downtown Hub, the 5.5-mile light rail extension that opened on 7 June 2025 (active)
  • awarded by Omaha Streetcar Authority — Construction-manager-at-risk contract for the mainline, guaranteed maximum price (Res. 2025-015, 16 June 2025); change order approved 15 December 2025 (active)
Sources for these relationships (18)
  • ● Alaska Railroad fact sheet: Bridge 127.5 Replacement · Eagle River bridge replacement: new 360-foot triple-span bridge, contractor selected 2022, construction from April 2025 into the second quarter of 2027, completion estimated end 2027, 80% FTA funded (published 2026-04-13 · checked 2026-10-08)
  • ● Valley Metro · REVISED August Valley Metro Board Meeting Packet — Joint Boards, RPTA and Valley Metro Rail agendas of 27 August 2026, minutes of the Joint Boards meeting of 18 June 2026, executive summaries, 2026 Prop 400 Transit Life Cycle Program Rail Update, monthly purchase order registers (192 pages) (published 2026-08-24 · checked 2026-09-14)
  • ● California High-Speed Rail Authority · News release: California approves team to build the nation's first true high-speed rail track and systems (published 2026-06-01 · checked 2026-09-12)
  • ○ Railway-News · California High-Speed Rail Authority awards track and systems contract (published 2026-06-02 · checked 2026-09-12)
  • ● Santa Clara Valley Transportation Authority · BART Silicon Valley Phase II — contracting (packages CP1-CP4; procurement desk and portal) (published 2026 · checked 2026-09-12)
  • ● CDPQ Infra · TramCité annonce les consortiums privilégiés pour les contrats civil et système (published 2026-03-26 · checked 2026-09-12)
  • ○ Flatwater Free Press report of the Omaha Streetcar Authority meeting of 15 December 2025 · Report: unanimous approval of a $5.38m change order to the Kiewit Construction contract for a track and power test section; completion expected September 2028; streetcars expected 2027; total Kiewit contract value not stated. Secondary; article posted 5 January 2026 (published 2026-01-05 · checked 2026-10-08)
  • ● Omaha Streetcar Authority board packet, 16 June 2025 · Agenda packet with Res. 2025-015 (Kiewit amendment at a Guaranteed Maximum Price). 403 to curl; read from Internet Archive copy (published 2025-06-16 · checked 2026-10-08)
  • ● Omaha Streetcar Authority board packet, 15 December 2025 · Agenda packet with Res. 2025-034 (Kiewit Change Order No. 1) and the change order sheet. 403 to curl; read from Internet Archive copy (published 2025-12-11 · checked 2026-10-08)
  • ● Austin Transit Partnership · Fiscal Year 2025-26 Approved Budget (published 2025-09-22 · checked 2026-09-14)
  • ● Austin Transit Partnership · Light Rail - Phase 1 line description (15 stops) (published 2026 · checked 2026-09-14)
  • ● Austin Transit Partnership · Austin Transit Partnership Selects Contractor to Deliver Operations and Maintenance Facility for Austin Light Rail (Kiewit Austin Partnership) (published 2026-04-15 · checked 2026-09-14)
  • ● Austin Transit Partnership · Federal Transit Administration Gives Austin Light Rail a “Medium-High” Rating (published 2025-11-19 · checked 2026-09-14)
  • ● Austin Transit Partnership · Austin Transit Partnership Completes Key Step in Federal Funding Process for Austin Light Rail (FTA Record of Decision) (published 2026-01-16 · checked 2026-09-14)
  • ● Federal Transit Administration · Austin Light Rail Phase 1 Project profile, FY2026 Annual Report (TX-Austin-Light-Rail-Phase-1-Profile-AR26-11-19-25.pdf) (published 2025-11-19 · checked 2026-09-14)
  • ● Federal Transit Administration · Current Capital Investment Grants Program and Expedited Project Delivery Pilot Program Projects (published 2026 · checked 2026-09-14)
  • ● Utah Public Notice Website — UTA Board of Trustees regular meeting, 22 October 2025 (agenda) · Meeting notice HTML: agenda item 8a lists Light Rail Vehicles Change Order 1 (Stadler US), notice to proceed on exercising an option to buy 20 vehicles; item 8c lists S-Line Extension Phase 1 Pre-Construction Design Change Order 4 (Kiewit Infrastructure West Co.), systems and pre-curved rail procurement. An agenda, not minutes; the attached minutes PDF could not be read (published 2025-10-22 · checked 2026-10-07)
  • ● Utah Transit Authority (official) — S-Line Extension Project · Project page: extends the S-Line streetcar about a quarter of a mile east from Fairmont Station to Highland Drive near Simpson Avenue with a new station; partners UTA, Salt Lake City, the Salt Lake Community Reinvestment Agency and UDOT; construction expected to continue through 2027; no cost or contractor stated (published 2026 · checked 2026-10-07)

Competes with

Other civil contractor players present in the same markets.

PlayerHQMarketsPositions
SkanskaSwedenUnited States, United Kingdom18
VINCIFranceEuropean Union, United States, United Kingdom16
DragadosSpainEuropean Union, United States, United Kingdom, Canada11
AeconCanadaCanada11
WebuildItalyEuropean Union, United States, Canada10
FCCSpainEuropean Union, Canada9
WalshUnited StatesUnited States7
Balfour BeattyUnited KingdomUnited States, United Kingdom6
1 source · primary
  • ● Kiewit · Rail, transit and systems (checked 2026-09-06)

Browse: the Atlas · United States · Canada · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.