India · State
? How to use this page
How to use a region page
- Counts and the pipeline for this region come first; the tabs list its buyers, players and tenders.
- Cities on the map open their own pages.
- Capex, pipeline value and the market narrative open with this market's edition.
Rajasthan
4 buyers · 9 tenders · checked 2026-09-24
Jaipur Metro Phase 2 (₹13,000 cr, April 2026) freshest pipeline; civil packages awarded; Western DFC largest state footprint; KAVACH 4.0.
Everything here is free. One market edition opens in full with one email. Open your free edition
1Metro systems operating
4Buyers tracked
9Tenders tracked
- Live pipeline
- ₹15,000–17,500 cr sanctioned/live (Phase 2 + Phase 1 extensions + NWR KAVACH)
- Technology areas
- Signalling & train control, Track & civil, Electrification, Rolling-stock hardware, Digital operations, Predictive maintenance, AI inspection, Cybersecurity
Key figures
Jaipur Metro Phase 111.97 km, 1 line (Pink), 11 stations — Mansarovar–Badi Chaupar
1 source · secondary
- ○ Wikipedia (cross-checked) · Jaipur Metro (published 2026 · checked 2026-08-20)
Jaipur Metro ridership≈60,000/day (Cabinet note, Apr 2026); 55,068/day (July 2024)
2 sources · 1 primary
- ● DD News (official broadcaster) · Cabinet approves ₹13,037 crore Jaipur Metro Phase-2 (published 2026-04 · checked 2026-08-20)
- ○ Wikipedia (cross-checked) · Jaipur Metro (published 2026 · checked 2026-08-20)
Western DFC in Rajasthan565 km of the 1,506 km Western DFC runs through Rajasthan — the joint-largest state share with Gujarat per PIB (565 km; 567 km per Wikipedia)
2 sources · 1 primary
- ● PIB (official) · Details of Dedicated Freight Corridor (Western DFC state-wise: Rajasthan 565 km) (published 2021-01 · checked 2026-08-20)
- ○ Wikipedia (cross-checked) · Western Dedicated Freight Corridor (published 2026 · checked 2026-08-20)
Buyers
| Buyer | Type | Tenders | Contracts awarded |
|---|---|---|---|
| Rajasthan Metro Rail Corporation Limited | Metro corporation | 4 | 1 |
| Jaipur Metro Rail Corporation | Metro corporation | 3 | 1 |
| North Western Railway | IR zone | 2 | 0 |
| Dedicated Freight Corridor Corporation of India (Rajasthan footprint) | Freight corridor | 0 | 0 |
Tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| 2C-03 11 elevated stations B2 Bypass Circle–Khasa Kothi | RMRCL | Bids closed | ₹1,000–1,200 cr | Published June 2026 |
| Phase 2 elevated viaduct 12 stations Todi Mod | RMRCL | Bids closed | ₹1,250–1,500 cr (estimate) | Bids closed August 2026 · award expected |
| 25 kV traction power systems OHE SCADA | JMRC | Bids closed | $5–25m | Bids closed December 2025 · award expected |
| Ballastless track work Phase 1C 1D | JMRC | Bids closed | ₹50–100 cr | |
| Phase 2 2C-01 elevated viaduct 10 stations | RMRCL | Awarded | ₹900–1,000 cr | Published October 2025 |
| Ajmer–Chanderiya doubling civil track electrical | NWR | Awarded | ₹250–300 cr | Awarded March 2025 |
| JCDD-02 detailed design civil architectural Phase 2 | RMRCL | Awarded | value not published | Awarded May 2026 |
| KAVACH 4.0 across NWR zone 5561 rkm | NWR | In execution | ₹2,000–2,500 cr (programme) | |
| Phase 1C UG-03 twin-tunnel Badi–Transport Nagar | JMRC | In execution | ₹600–650 cr | Awarded September 2023 |
Cities
| City | Network status | Networks |
|---|---|---|
| Jaipur | operational (Phase 1) + Phase 1C/1D under construction + Phase 2 sanctioned, civil awards underway | Jaipur Metro (Pink Line operational; Orange Line / Phase 2 sanctioned) |
| Kota | no metro; national test-bed — Vande Bharat freight-EMU trials + Kavach 4.0 commissioned mainline |
Players with a footprint here
Withheld in the free surface
- Market narrative
- Indian Railways allocation (4)
Full detail withheld: 2 fields. In the India edition · See a fully open example
- Jaipur p2 (4)
- Jaipur p1 extensions (4)
- Nwr network (4)
- KAVACH delhi mumbai (3)
- Vande bharat freight (3)
Full detail withheld: 5 fields. In the India edition · See a fully open example
Browse: the Atlas · India · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.