India · State
? How to use this page

How to use a region page

  1. Counts and the pipeline for this region come first; the tabs list its buyers, players and tenders.
  2. Cities on the map open their own pages.
  3. Capex, pipeline value and the market narrative open with this market's edition.

Odisha

3 buyers · 8 tenders · checked 2026-10-03

East Coast Railway hub with 2026 port-rail multitracking sanctioned; Bhubaneswar Metro scrapped; pitching India's first rail-tech manufacturing park.

Everything here is free. One market edition opens in full with one email. Open your free edition

0Metro systems operating
1IR zones headquartered
3Buyers tracked
8Tenders tracked
Live pipeline
₹9,000–10,500 cr sanctioned in-window (2026 multitracking + KAVACH), plus a terminated ₹6,000 cr-class metro programme
Technology areas
Signalling & train control, Track & civil, Rolling-stock hardware

Key figures

East Coast Railway freight load…286.3 MT originating freight FY2025-26 (all-time high; +27 MT y-o-y) — IR's highest-loading zone, ~17.1% of IR's 1,669.9 MTEast Coast Railway freight loading
2 sources · all secondary
  • ○ UNI · East Coast Railway logs record freight loading in 2025-26 (286.3 MT) (published 2026-04 · checked 2026-08-20)
  • ○ RailPost.in · ECoR FY26 performance — IR's highest freight-loading zone (published 2026-04 · checked 2026-08-20)
Bhubaneswar MetroBhubaneswar Metro (26 km, 20 stations, ~₹5,900–6,300 cr, state-funded) terminated by cabinet 2026-04-04; minister later called it 'paused'Bhubaneswar Metro — terminated/paused
3 sources · all secondary
  • ○ Odisha Plus · Bhubaneswar Metro project cancelled; DMRC agreement annulled; economic-corridor pivot (published 2026-04 · checked 2026-08-20)
  • ○ Swarajya · Odisha scraps Bhubaneswar Metro project over low ridership (published 2026-04 · checked 2026-08-20)
  • ○ Swarajya · Odisha minister says metro project only on hold, not scrapped (published 2026-04-12 · checked 2026-08-20)

Buyers

Tenders

TenderBuyerStatusValue bandNext key date
BBC-03 viaduct 6 elevated stations Capital–ViharBMRCL (Bhubaneswar)Awarded₹550–600 crAwarded August 2024
BBC-04 viaduct 7 elevated stations Acharya–KIITBMRCL (Bhubaneswar)Awarded₹600–650 crAwarded August 2024
BBC-05 viaduct 6 elevated stations KIIT–TrisuliaBMRCL (Bhubaneswar)Awarded₹850–900 crAwarded August 2024
Bhadrak–Haridaspur 4th lineECoRPlanned₹1,500–2,000 crSanctioned August 2026
Cuttack–Paradeep Badabandha 3rd 4th linesECoRPlanned₹2,000–2,500 crSanctioned August 2026
Doubling Paradip–Haridaspur line Paradip port feederECoRPlanned₹2,500–3,000 crSanctioned July 2026
Kharagpur–Bhadrak Ranital 4th line West Bengal OdishaECoRPlanned₹3,000–3,500 crSanctioned August 2026
KAVACH ATP 631 RKm ECoR six sectionsECoRPlanned₹250–300 crSanctioned June 2026

Cities

CityNetwork statusNetworks
Bhubaneswarmetro construction terminated (Apr 2026); ECoR zonal HQ

Players with a footprint here

PlayerKindFootprint
Ranjit BuildconCivil contractorProject presence
JSPLTrack technology supplierPlant
SAILTrack technology supplierPlant
Jupiter WagonsRolling-stock OEMPlant

Withheld in the free surface

  • Market narrative
  • Capex in this region (4)

Full detail withheld: 2 fields. In the India edition · See a fully open example

  • Sanction wave 2026 (4)
  • Kb line (4)
  • Railtech park (3)
  • Dhamra connectivity (4)

Full detail withheld: 4 fields. In the India edition · See a fully open example

Browse: the Atlas · India · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.