India · State
? How to use this page
How to use a region page
- Counts and the pipeline for this region come first; the tabs list its buyers, players and tenders.
- Cities on the map open their own pages.
- Capex, pipeline value and the market narrative open with this market's edition.
Gujarat
4 buyers · 10 tenders · checked 2026-10-14
~352 km Mumbai-Ahmedabad bullet train with 8 of 12 stations, 2 of 3 depots; Ahmedabad metro operational, Surat in trials; Western DFC largest share.
Everything here is free. One market edition opens in full with one email. Open your free edition
1Metro systems operating
1Metro systems under construction
1High-speed corridors under construction
4Buyers tracked
9Tenders tracked
- Live pipeline
- ₹1,00,000 cr+ HSR programme under execution + ₹12,000 cr-class Surat Metro build
- Technology areas
- Signalling & train control, Rolling-stock hardware, Track & civil, Electrification, Digital operations, Predictive maintenance, AI inspection, Cybersecurity
Key figures
Mumbai–Ahmedabad HSR programme₹1,08,000 cr sanctioned; 508 km corridor, ~352 km and 8 of 12 stations in Gujarat; first commercial service (Surat–Vapi ~100 km) announced for August 2027, full corridor by 2029-class timelines
3 sources · 1 primary
- ● PIB (official) · Status of Mumbai-Ahmedabad bullet train (sanctioned cost ₹1,08,000 cr) (published 2024-02-09 · checked 2026-08-20)
- ○ Wikipedia (cross-checked) · Mumbai–Ahmedabad high-speed rail corridor (published 2026 · checked 2026-08-20)
- ○ Deccan Herald · Bullet train inaugural run to cover 100 km between Surat and Vapi in August 2027 — Vaishnaw (published 2026 · checked 2026-08-20)
Gujarat metro route-km operatio…≈68 km operational in Ahmedabad–Gandhinagar (Ph1 40.03 km + Ph2 28.2 km, fully commissioned 2026-01-11)
2 sources · 1 primary
- ● GMRC (official) · Project overview (Ahmedabad Ph1 40.03 km/31 stations; Ph2 28.2 km fully commissioned 2026-01-11; Surat 40.35 km/38 stations under construction) (published 2026 · checked 2026-08-20)
- ○ Wikipedia (cross-checked) · Ahmedabad Metro (67.56 km operational, 4 lines; Yellow Line completed 2026-01-11; ridership) (published 2026 · checked 2026-08-20)
Surat Metro Phase 140.35 km / 38 stations under construction; trial runs on first 8.5 km since 2026-03-29
2 sources · 1 primary
- ● GMRC (official) · Project overview (Ahmedabad Ph1 40.03 km/31 stations; Ph2 28.2 km fully commissioned 2026-01-11; Surat 40.35 km/38 stations under construction) (published 2026 · checked 2026-08-20)
- ○ Indian Infrastructure · Trial runs commence on Diamond Corridor (Dream City–Althan, 8.5 km), Surat Metro Phase I (published 2026-03-30 · checked 2026-08-20)
Buyers
| Buyer | Type | Tenders | Contracts awarded |
|---|---|---|---|
| National High Speed Rail Corporation Limited | High-speed rail SPV | 6 | 6 |
| Gujarat Metro Rail Corporation Limited | Metro corporation | 2 | 2 |
| Western Railway (Gujarat divisions) | IR zone | 2 | 0 |
| Dedicated Freight Corridor Corporation of India (Gujarat) | Freight corridor | 0 | 0 |
Tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Ahmedabad Metro Phase 3 viaduct, Package 1 | GMRC | Open | $84.7–95.2M (₹800–900 cr) | Closes November 2026 |
| Surat Metro multi-modal integration 21 stations | GMRC | Bids closed | ₹50–100 cr per package | Bids closed June 2026 · award expected |
| MAHSR Shinkansen 2×25 kV electrification | NHSRCL | Awarded | ₹10,000–15,000 cr (L&T 'Mega' band) | Awarded January 2024 |
| MAHSR T-2 237 km J-Slab | NHSRCL | Awarded | ₹5,000–5,500 cr | Awarded January 2022 |
| MAHSR Shinkansen DS-ATC signalling telecom | NHSRCL | Awarded | ₹4,000–4,500 cr | Awarded June 2025 |
| MAHSR T-3 116 km J-Slab | NHSRCL | Awarded | ₹2,500–5,000 cr (L&T 'Large' band) | Awarded May 2022 |
| MAHSR 8-car 280 kmph B28 | NHSRCL | Awarded | ₹850–900 cr | |
| MAHSR rolling stock maintenance machinery | NHSRCL | Awarded | value not published | Awarded August 2026 |
| OFC LTE backbone Ahmedabad Ratlam | WR (Gujarat) | Planned | ₹350–400 cr | Sanctioned April 2026 |
| KAVACH 4.0 48 block sections | WR (Gujarat) | Planned | ₹100–150 cr | Sanctioned June 2026 |
Cities
| City | Network status | Networks |
|---|---|---|
| Ahmedabad | metro operational (Phases 1+2 complete); MAHSR terminus under construction | Ahmedabad Metro (Blue + Red + Yellow + Violet lines) |
| Surat | metro under construction (trial runs); MAHSR station + depot under construction | Surat Metro (Phase 1 under construction) |
| Vadodara | no metro; MAHSR station under construction; WR division HQ |
Players with a footprint here
| Player | Kind | Footprint |
|---|---|---|
| L&T | Civil contractor | Headquarters |
| Alstom | Rolling-stock OEM | Office, Plant |
| Siemens Mobility | Rolling-stock OEM | Plant |
| Titagarh | Rolling-stock OEM | Plant |
| DBL | Civil contractor | Headquarters |
| DRA Infracon | Civil contractor | Project presence |
| IRCON | Civil contractor | Headquarters |
| ABB | Vehicle systems supplier | Plant |
| Hitachi Energy | Vehicle systems supplier | Plant |
What changed
From This Week in Rail, newest first.
- 2026-11-16 — Gujarat Metro Rail Corporation is tendering construction of a depot, including the OCC and associated E&M works, near Shela for the Ahmedabad Metro Rail project.
- 2026-11-16 — Gujarat Metro Rail Corporation is tendering construction of a depot, including the OCC and associated E&M works, near Gyaspur for the Ahmedabad Metro Rail project.
- 2026-11-09 — Gujarat Metro Rail Corporation has tendered construction of an 11.04km elevated viaduct from Vishal Nagar West to Bapunagar North with 10 elevated stations for the Ahmedabad Metro Rail project (NIT STNS & VDCT-4).
- 2026-11-09 — Gujarat Metro Rail Corporation has tendered construction of a 12.527km elevated viaduct from Shilaj Circle to Badrabad dead end with 7 elevated stations for the Ahmedabad Metro Rail project (NIT STNS & VDCT-2).
- 2026-11-09 — Gujarat Metro Rail Corporation has tendered construction of a 10.26km elevated viaduct from Thaltej Gam dead end to Godhavi dead end with 8 elevated stations and E&M works for the Ahmedabad Metro Rail project (NIT STNS & VDCT-1).
Withheld in the free surface
- Market narrative
- Capex in this region (4)
Full detail withheld: 2 fields. In the India edition · See a fully open example
- Mahsr gujarat progress (3)
- Mahsr spend (4)
- Wdfc gujarat (4)
- KAVACH wr (3)
- Ahmedabad ridership (3)
Full detail withheld: 5 fields. In the India edition · See a fully open example
Browse: the Atlas · India · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.