India · State
? How to use this page

How to use a region page

  1. Counts and the pipeline for this region come first; the tabs list its buyers, players and tenders.
  2. Cities on the map open their own pages.
  3. Capex, pipeline value and the market narrative open with this market's edition.

Gujarat

4 buyers · 9 tenders · checked 2026-10-03

~352 km Mumbai-Ahmedabad bullet train with 8 of 12 stations, 2 of 3 depots; Ahmedabad metro operational, Surat in trials; Western DFC largest share.

Everything here is free. One market edition opens in full with one email. Open your free edition

1Metro systems operating
1Metro systems under construction
1High-speed corridors under construction
4Buyers tracked
9Tenders tracked
Live pipeline
₹1,00,000 cr+ HSR programme under execution + ₹12,000 cr-class Surat Metro build
Technology areas
Signalling & train control, Rolling-stock hardware, Track & civil, Electrification, Digital operations, Predictive maintenance, AI inspection, Cybersecurity

Key figures

Mumbai–Ahmedabad HSR programme₹1,08,000 cr sanctioned; 508 km corridor, ~352 km and 8 of 12 stations in Gujarat; first commercial service (Surat–Vapi ~100 km) announced for August 2027, full corridor by 2029-class timelinesMumbai–Ahmedabad HSR programme
3 sources · 1 primary
  • ● PIB (official) · Status of Mumbai-Ahmedabad bullet train (sanctioned cost ₹1,08,000 cr) (published 2024-02-09 · checked 2026-08-20)
  • ○ Wikipedia (cross-checked) · Mumbai–Ahmedabad high-speed rail corridor (published 2026 · checked 2026-08-20)
  • ○ Deccan Herald · Bullet train inaugural run to cover 100 km between Surat and Vapi in August 2027 — Vaishnaw (published 2026 · checked 2026-08-20)
Gujarat metro route-km operatio…≈68 km operational in Ahmedabad–Gandhinagar (Ph1 40.03 km + Ph2 28.2 km, fully commissioned 2026-01-11)Gujarat metro route-km operational
2 sources · 1 primary
  • ● GMRC (official) · Project overview (Ahmedabad Ph1 40.03 km/31 stations; Ph2 28.2 km fully commissioned 2026-01-11; Surat 40.35 km/38 stations under construction) (published 2026 · checked 2026-08-20)
  • ○ Wikipedia (cross-checked) · Ahmedabad Metro (67.56 km operational, 4 lines; Yellow Line completed 2026-01-11; ridership) (published 2026 · checked 2026-08-20)
Surat Metro Phase 140.35 km / 38 stations under construction; trial runs on first 8.5 km since 2026-03-29Surat Metro Phase 1
2 sources · 1 primary
  • ● GMRC (official) · Project overview (Ahmedabad Ph1 40.03 km/31 stations; Ph2 28.2 km fully commissioned 2026-01-11; Surat 40.35 km/38 stations under construction) (published 2026 · checked 2026-08-20)
  • ○ Indian Infrastructure · Trial runs commence on Diamond Corridor (Dream City–Althan, 8.5 km), Surat Metro Phase I (published 2026-03-30 · checked 2026-08-20)

Buyers

Tenders

TenderBuyerStatusValue bandNext key date
Surat Metro multi-modal integration 21 stationsGMRCBids closed₹50–100 cr per packageBids closed June 2026 · award expected
MAHSR Shinkansen 2×25 kV electrificationNHSRCLAwarded₹10,000–15,000 cr (L&T 'Mega' band)Awarded January 2024
MAHSR T-2 237 km J-SlabNHSRCLAwarded₹5,000–5,500 crAwarded January 2022
MAHSR Shinkansen DS-ATC signalling telecomNHSRCLAwarded₹4,000–4,500 crAwarded June 2025
MAHSR T-3 116 km J-SlabNHSRCLAwarded₹2,500–5,000 cr (L&T 'Large' band)Awarded May 2022
MAHSR 8-car 280 kmph B28NHSRCLAwarded₹850–900 cr
MAHSR rolling stock maintenance machineryNHSRCLAwardedvalue not publishedAwarded August 2026
OFC LTE backbone Ahmedabad RatlamWR (Gujarat)Planned₹350–400 crSanctioned April 2026
KAVACH 4.0 48 block sectionsWR (Gujarat)Planned₹100–150 crSanctioned June 2026

Cities

CityNetwork statusNetworks
Ahmedabadmetro operational (Phases 1+2 complete); MAHSR terminus under constructionAhmedabad Metro (Blue + Red + Yellow + Violet lines)
Suratmetro under construction (trial runs); MAHSR station + depot under constructionSurat Metro (Phase 1 under construction)
Vadodarano metro; MAHSR station under construction; WR division HQ

Players with a footprint here

PlayerKindFootprint
L&TCivil contractorHeadquarters
AlstomRolling-stock OEMOffice, Plant
Siemens MobilityRolling-stock OEMPlant
TitagarhRolling-stock OEMPlant
DBLCivil contractorHeadquarters
DRA InfraconCivil contractorProject presence
IRCONCivil contractorHeadquarters
ABBVehicle systems supplierPlant
Hitachi EnergyVehicle systems supplierPlant

What changed

From This Week in Rail, newest first.

  • 2026-09-28 — Gujarat Metro Rail Corporation tenders a 10.26km elevated viaduct with eight stations from Thaltej Gam to Godhavi for the Ahmedabad Metro, bids closing 16 November.
  • 2026-09-28 — Gujarat Metro Rail Corporation tenders a 12.527km elevated viaduct with seven stations from Shilaj Circle to Badrabad for the Ahmedabad Metro, bids closing 16 November.
  • 2026-09-28 — Gujarat Metro Rail Corporation tenders a 6.56km elevated viaduct with five stations from APMC to New Faisal Nagar for the Ahmedabad Metro, bids closing 20 November.
  • 2026-09-28 — Gujarat Metro Rail Corporation tenders an 11.04km elevated viaduct with ten stations from Vishal Nagar West to Bapunagar North for the Ahmedabad Metro, bids closing 20 November.
  • 2026-09-28 — Gujarat Metro Rail Corporation tenders an 8.68km elevated viaduct with five stations from Naranpura to Nehrunagar for the Ahmedabad Metro, bids closing 21 November.

Withheld in the free surface

  • Market narrative
  • Capex in this region (4)

Full detail withheld: 2 fields. In the India edition · See a fully open example

  • Mahsr gujarat progress (3)
  • Mahsr spend (4)
  • Wdfc gujarat (4)
  • KAVACH wr (3)
  • Ahmedabad ridership (3)

Full detail withheld: 5 fields. In the India edition · See a fully open example

Browse: the Atlas · India · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.