Buyer · IR zone
? How to use this page

How to use a buyer page

  1. Who this buyer is, then who already holds positions here and what it is tendering.
  2. Click Watch and every change lands in your weekly digest.
  3. How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.

Metro Railway, Kolkata

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the India edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Type
IR zone — IR-run metro operator; Indian Railways zone — India's only IR-run metro
Market · Region
India · West Bengal
Open tenders
0
Technology areas
Rolling-stock hardware, Signalling & train control, Digital operations, Predictive maintenance, AI inspection, Track & civil, Electrification

Owns and operates all five Kolkata Metro lines.

About this buyer

Read more

Owns and operates all five Kolkata Metro lines (≈72–73 km); lets its own civil/systems tenders (Principal Chief Engineer) alongside IREPS procurement.

Type
IR zone — IR-run metro operator; Indian Railways zone — India's only IR-run metro
Where
West Bengal · Kolkata
Technology areas
Rolling-stock hardware, Signalling & train control, Digital operations, Predictive maintenance, AI inspection, Track & civil, Electrification

Who holds what here

  • awarded ITD Cementation — Yellow Line extension civil — 3.59 km box tunnel and Birati station (L1, June 2025) (active · since 2025-06)
  • awarded Medha — 20 CBTC-fitted eight-coach rakes for the Purple/Orange/Yellow lines, built at ICF (active)
Sources for these relationships (4)
  • ○ Metro Rail News · ITD Cementation L1 (₹1,097.23 cr vs ₹1,330.47 cr estimate) — Yellow Line extension civil, Birati UG station + 3.59 km box tunnel (published 2025-06-27 · checked 2026-08-20)
  • ○ Metro Rail News · Kolkata Metro eyes 130 km network; 23.60 cr passengers FY2025-26; ₹166 cr revenue Apr–Jul 2026 (+34%) (published 2026-08-17 · checked 2026-08-20)
  • ○ Metro Rail Today · Medha to supply 20 eight-coach rakes for Purple, Orange and Yellow lines (built at ICF; CBTC-fitted) (published 2025-03-18 · checked 2026-08-20)
  • ○ Wikipedia (cross-checked) · Kolkata Metro (published 2026 · checked 2026-08-20)

Tenders

TenderStatusValue bandNext key date
Yellow Line extension 3.59 km Birati underground stationAwarded₹1,000–1,500 crPublished August 2024

Withheld in the free surface

  • Procurement structure
  • Award history (3)
  • Entry path
  • Portals (1)

Full detail withheld: 4 fields. In the India edition · See a fully open example

4 sources · all secondary
  • ○ Wikipedia (cross-checked) · Kolkata Metro (published 2026 · checked 2026-08-20)
  • ○ Metro Rail News · ITD Cementation L1 (₹1,097.23 cr vs ₹1,330.47 cr estimate) — Yellow Line extension civil, Birati UG station + 3.59 km box tunnel (published 2025-06-27 · checked 2026-08-20)
  • ○ Metro Rail Today · Medha to supply 20 eight-coach rakes for Purple, Orange and Yellow lines (built at ICF; CBTC-fitted) (published 2025-03-18 · checked 2026-08-20)
  • ○ Metro Rail News · Kolkata Metro eyes 130 km network; 23.60 cr passengers FY2025-26; ₹166 cr revenue Apr–Jul 2026 (+34%) (published 2026-08-17 · checked 2026-08-20)

Browse: the Atlas · India · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.