? How to use this page
How to use a buyer page
- Who this buyer is, then who already holds positions here and what it is tendering.
- Click Watch and every change lands in your weekly digest.
- How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.
City of Calgary — Green Line LRT
Live now: 3 tenders, largest Green Line Phase 1 Maintenance Storage Facility (value not published); holds relationships with CAF, AtkinsRéalis, Graham.
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the Canada edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Type
- Transit authority — municipality delivering the Green Line; Calgary Transit operates the CTrain
- Market · Region
- Canada · Alberta
- Open tenders
- 3
- Technology areas
- Track & civil, Rolling-stock hardware, Signalling & train control, Electrification, Digital operations
Delivers C$6.248bn Green Line LRT Phase 1 (17.2 km, 12 stations, opening 2031) and operates CTrain.
About this buyer
Read more
Delivers the C$6.248bn Green Line LRT Phase 1 — 17.2 km of twin-track LRT and 12 new stations from Shepard to the Downtown, with 28 low-floor vehicles and almost 55,000 projected daily riders on opening in 2031 — and operates Calgary Transit's CTrain; C$1.8bn had been spent by September 2026 and the Executive Committee approved a surface Downtown alignment on 8 September 2026.
- Type
- Transit authority — municipality delivering the Green Line; Calgary Transit operates the CTrain
- Where
- Alberta · Calgary
- Programmes
- Canada Public Transit Fund
- Technology areas
- Track & civil, Rolling-stock hardware, Signalling & train control, Electrification, Digital operations
Who holds what here
- awarded Graham — One of three Green Line construction contracts awarded May–June 2026 (MSF foundations and utilities, MSF structural steel, 570 m elevated guideway over 114 Avenue and Barlow Trail S.E.); the City does not state which firm holds which (active · since 2026-06)
- awarded PCL — One of three Green Line construction contracts awarded May–June 2026 (MSF foundations and utilities, MSF structural steel, 570 m elevated guideway over 114 Avenue and Barlow Trail S.E.); the City does not state which firm holds which (active · since 2026-06)
- awarded Supreme Steel — Green Line Phase 1 early construction contracts — Supreme Steel (active · since 2026-05)
- awarded CAF — Green Line Phase 1 light rail vehicles — 28 CAF Urbos 100, manufacturing from 2025 (active · since 2025)
- awarded AtkinsRéalis — Green Line Phase 1 delivery partner — AtkinsRéalis Canada Inc. and its subcontractors, known as CSIX (active)
- awarded Supreme Steel — Calgary Green Line LRT Phase 1 Shepard Downtown — Supreme Steel (active)
Sources for these relationships (7)
- ● City of Calgary · Green Line LRT — supply and contract opportunities (published 2026 · checked 2026-09-12)
- ● City of Calgary · Moving forward: surface route for Downtown approved (published 2026-09-08 · checked 2026-09-12)
- ● City of Calgary · Green Line LRT — FAQs and resources (funding split and scope) (published 2026 · checked 2026-09-12)
- ● City of Calgary · Green Line LRT — funding partners (published 2026 · checked 2026-09-12)
- ● City of Calgary · New construction contracts awarded to Graham, PCL and Supreme Steel, supporting local jobs (published 2026-06-30 · checked 2026-09-12)
- ● City of Calgary · Green Line LRT — trains (Urbos 100 light rail vehicles) (published 2026 · checked 2026-09-12)
- ● City of Calgary · About Green Line — Green Line LRT (published 2026-06-30 · checked 2026-09-05)
Tenders
Withheld in the free surface
- Procurement structure
- Award history (5)
- Entry path
- Portals (4)
- Published contacts (5)
Full detail withheld: 5 fields. In the Canada edition · See a fully open example
11 sources · all primary
- ● City of Calgary · About Green Line — Green Line LRT (published 2026-06-30 · checked 2026-09-05)
- ● City of Calgary · Green Line LRT — supply and contract opportunities (published 2026 · checked 2026-09-12)
- ● City of Calgary · Green Line LRT — trains (Urbos 100 light rail vehicles) (published 2026 · checked 2026-09-12)
- ● City of Calgary · Green Line LRT — funding partners (published 2026 · checked 2026-09-12)
- ● City of Calgary · New construction contracts awarded to Graham, PCL and Supreme Steel, supporting local jobs (published 2026-06-30 · checked 2026-09-12)
- ● City of Calgary · Supply to the City — bidding system (SAP Business Network) (published 2026 · checked 2026-09-12)
- ● City of Calgary · Supply to the City (published 2026 · checked 2026-09-12)
- ● City of Calgary · Green Line LRT — FAQs and resources (funding split and scope) (published 2026 · checked 2026-09-12)
- ● City of Calgary · Green Line LRT — contact us (published 2026 · checked 2026-09-12)
- ● City of Calgary · Moving forward: surface route for Downtown approved (published 2026-09-08 · checked 2026-09-12)
- ● City of Calgary · Supply to the City — contacts (published 2026 · checked 2026-09-12)
Browse: the Atlas · Canada · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.